Travancore Titanium Products Limited Tender

... More
The TTPL has issued a formal invitation for competitive bids for the Travancore Titanium Products Limited project, for Revamping Of Damaged Roads -inner Gate To Cooling Tower in Thiruvananthapuram, Kerala. The bid opening date for this tender is 28-02-2022 and the last date for bid submission is 25-03-2022. Interested bidders for Travancore Titanium Products Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Travancore Titanium Products Limited - TTPL Tender

Opening Date28 Feb 2022
Closing Date25 Mar 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by manual / mechanical means including dressing of sides and ramming of bottoms,including getting out the excavated soil and disposal of surplus excavated soil to dumpyard as directed by Engineer in charge.

113.52

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specificationincluding premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

70.95

-

-

... More
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared

1000

-

-

... More
Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.2 per cent of mix and filler , transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - I (19 mm Nominal size)

86.98

-

-

... More
Revamping of roads in TTPL

-

-

-

... More
Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.

473

-

-

... More
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.

70.95

-

-

... More
Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading, premixed with bituminous binder using VG 30 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. For grading - I ( 37.5 mm nominal size)

35.48

-

-

... More
Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

2427.38

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.