Travancore Devaswom Board Tender

... More
The TDB has issued a formal invitation for competitive bids for the Travancore Devaswom Board project, for Perumbavoor Devaswom In Thrikkariyoor Group - Urgent Reconstruction Of The Collapsed Hand Rail Surrounding The Temple Pond. in Kottayam, Kerala, with an estimated contract value of Rs. 4,56,485. The bid opening date for this tender is 27-02-2025 and the last date for bid submission is 03-03-2025. Interested bidders for Travancore Devaswom Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Travancore Devaswom Board - TDB Tender

Works
Civil And Construction
Eprocure
Opening Date27 Feb 2025
Closing DateCancelled
Tender Amount₹ 4,56,485 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer

62.58

70

4421

... More
Labour charges for removing the collapsed steel hand rails and staking the same at suitable location : Man coolie engaged

6

878

5273

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

650

101

65839

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

0.57

7990

4563

... More
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar

3.77

1730

6530

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

0.43

2045

877

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

4.52

10954

49534

... More
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead: Cement mortar 1:4 ( 1 cement: 4 coarse sand)

3.36

505

1700

... More
Filling with Quarry muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade

232.5

902

209794



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.