The Travancore Cochin Chemicals Limited Tender

... More
The The Travancore Cochin Chemicals Limited has issued a formal invitation for competitive bids for Construction Of Compound Wall At Ksie Land Near Water Treatment Plant in Ernakulam, Kerala, with an estimated contract value of Rs. 5,89,358. The bid opening date for this tender is 20-02-2023 and the last date for bid submission is 06-03-2023. Interested bidders for The Travancore Cochin Chemicals Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

The Travancore Cochin Chemicals Limited Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Feb 2023
Closing Date6 Mar 2023
Tender Amount₹ 5,89,358 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of compound wall at KSIE land near Water Treatment Plant
Construction of compound wall at KSIE land near Water Treatment Plant
Construction of compound wall at KSIE land near Water Treatment Plant.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of existing concrete poles,including all labour charges ,hire for tools,all safety protection works to men,machinery,materials etc.Including all safety measures like safety belt,helmet,googles/face shield,safety shoes,at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts each day,machinery,pipe lines,cables etc,stacking the post to the location pointed out by engineer in charge,Disposal of materials with in 1000 m lead as per the instruction of engineer in charge,as per approval of TCC.,all hire for hand cart/tempo van/lorry etc., complete.

45

-

-

... More
Providing and laying in plain cement concrete of specified grade excluding the cost of centering and shuttering –All work up to plinth level 1:2:4 (1 cement : 2 corse sand :4 graded stone aggregate of 20 mm nominal size)(Required quantity of cement will be issued by TCC at free of cost)Providing and laying in plain cement concrete of specified grade excluding the cost of centering and shuttering –All work up to plinth level 1:2:4 (1 cement : 2 corse sand :4 graded stone aggregate of 20 mm nominal size)(Required quantity of cement will be issued by TCC at free of cost)

2.76

-

-

... More
Concrete block masonry work in cement mortar 1:5, using standard size pre-cast blocks of 30 x 20x 15 cm or nearest available size for compound wall, including all material costs except cement , all labour charges, hire for tolls and plants, all safety precautions etc complete.( Required cement will be issued free of cost)

36.8

-

-

... More
Providing and laying in plain cement concrete of specified grade including the cost of centering and shuttering – All work up to plinth level:(required quantity of cement issued free of cost from TCC)br1:4:8 (1 cement:4 coarse sand : 8 graded stone aggregate 40 nominal size)

5.52

-

-

... More
Fabricating and fixing M.S angular fence post on top of compound wall in cement concrete of grade 1:2:4, erecting post at a depth of 20cm, total length 120cm angled 30º at 60cm from the top of the wall with ISA 65x65x5mm, providing sufficient groves for holding barbed wire at a spacing 15cm,including cost of centering,shuttering,finishing ,curing for a period of 7 days,including cost of all materials,cost of conveying, cost of all hires and tools etc.Post should be fixed properly in cement concrete and checked for line and level using plumb etc.(Required quantity of steel and cement will be issued by TCC free of cost)

40.5

-

-

... More
Fixing existing or dismantled PVC coated GI barbed fencing wire of 2.5mm dia and barbed spacing 10cm in 5 layers fixed through the grooves provide in the angular M.S fence post, barbed wire streched, tightened and spliced to perfect tension, tied to poles using aluminium wire in line & level including cost of all materials, cost of conveying, cost of all hires and tools etc. (Required quantity of barbed wire will be issued by TCC free of cost)

460

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.