Technopark Tender
... More
The Technopark has issued a formal invitation for competitive bids for Construction Of Cable Trench From Brigade Square To Ss3 (electrical Laboratory) In Technopark Phase 1 Campus, Trivandrum in Thiruvananthapuram, Kerala, with an estimated contract value of Rs. 12,32,746. The bid opening date for this tender is 05-02-2025 and the last date for bid submission is 17-03-2025. Interested bidders for Technopark tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Technopark Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date5 Feb 2025
Closing Date17 Mar 2025
Tender Amount₹ 12,32,746
Costs
EMD
₹ 30,819Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ETPK_734778_1Bid Award Id
ViewTender No
ETPK/PH1/218/2024-25Tender Authority
Technopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolishing R.C.C. work by mechanical means (Hydraulic excavator) /manual means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars for drain work. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
1.58
-
-
... More
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Bituminous course - By mechanical means (Hydraulic excavator) /manual means for drain work. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
4.95
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) for drain work. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
15.44
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations, sides of drain etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
28.51
-
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
2115.69
-
-
... More
Supplying and fixing RCC precast slab in 1:2:4 (including steel reinforcement) - 96X48X10cm or nearest as per site condetion and direction of enginner in charge. for coverslab of drain. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
29
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth, string courses, side wall of drain, base of drain and topslab of drain etc. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
428.78
-
-
... More
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 1000 metre lead as per direction of Engineer-in-Charge for drain work. The rate is inclusive of all material charge, Side maintenance, leveling, fixing in proper allignment, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from work site etc. complete as per the direction of engineer in charge.
102.3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements