Soil Survey And Soil Conservation Department Tender
... More
The Soil Survey And Soil Conservation Department has issued a formal invitation for competitive bids for Construction Of Retaining Wall 1mt Ht.(diversion Channel) in Idukki, Kerala, with an estimated contract value of Rs. 5,91,889. The bid opening date for this tender is 27-02-2019 and the last date for bid submission is 06-03-2019. Interested bidders for Soil Survey And Soil Conservation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 14,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_DSSC_265370_2Bid Award Id
ViewTender No
IS(5)825/2017/2Tender Authority
Soil Survey And Soil Conservation Department ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
4.1.5 - Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteing- All work upto the the plinth level 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)
7.88
-
-
... More
2.8.1-Earth work excavation by mechanical means(hydaulic Excavator)/manual means over areas (exceedind 30n cm in depth1.5m in width as well as 10sqm on plan)including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m -All kind of soil
70
-
-
... More
Construction of Retaining Wall 1mt Ht. (Diversion Channel)
-
-
-
... More
60.7.1 - DRY RUBBLE MASONRY_ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials, labour charge etc. complete as per direction of departmental officers at site
161.88
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements