Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for General-rm 2024-25, Rc-1, Cluster - 1, Piravom - Zone 2 -one Year Running Contract For Various Roads Under Pwd Roads Section Piravom In Ernakulam District, 7 Nos Of Roads For A Stretch Of 15.65km-general Civil Work in Ernakulam, Kerala, with an estimated contract value of Rs. 69,20,820. The bid opening date for this tender is 11-04-2025 and the last date for bid submission is 21-04-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Works
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date11 Apr 2025
Closing Date21 Apr 2025
Tender Amount₹ 69,20,820 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

15609

-

-

... More
OD5147/2025-2026:<derived from DAR :50.2.33.6> Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete

110

-

-

... More
OD5143/2025-2026:<derived 2.33.2> Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth

3

-

-

... More
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor

4300

-

-

... More
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer

7.66

-

-

... More
OD127830/2024-2025:Filling up the pot holes (cut and formed to regular shape and all loose and defective material removed ) with bituminous ready mix compound( 25 kg bag) and compacting by ramming to get a compact surface, after applyimg bituminous priming coat including of cost of materials, laying charge, transporting to site, etc, complete. Rate is arrived for a bag of 25 kgs.

180

-

-

... More
OD127826/2024-2025:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.

813.8

-

-

... More
OD5144/2025-2026:<derived 2.33.1> Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth up to and including 60 cm girth

4

-

-

... More
OD127831/2024-2025:Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By Manual means.

4015

-

-

... More
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area

2.7

-

-

... More
OD127834/2024-2025:Removing the old existing vinyl sticker on the display board of running contract and replacing with new vinyl sticker, including lettering, symbols, and transporting to site etc. as per approved drawing and direction of site engineer

8.4

-

-

... More
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.

100

-

-

... More
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)<br>

820

-

-

... More
OD343/2025-2026:Dry Stone Masonry for Retainingwall including cost of materials , conveyance ,Labour charges etc complete

65.28

-

-

... More
OD5146/2025-2026:<derived from DAR : 50.2.33.5 >Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.

138

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

24.6

-

-

... More
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

10

-

-

... More
OD127829/2024-2025:Providing , laying and rolling of close graded premix carpet (CGPC) of 20 mm thickness composed of 11.2 mm to 0.09 mm (MoRTH M -041) aggregates premixed using viscosity grade bitumen (VG 30@22 kg of bitumen per 10 sqm (MoRTH 5.7.1 Type A) to required line, grade and level on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel static, roller of 80-100 kN capacity, finished to required level and grades. By Manual means.

15609

-

-

... More
OD342/2025-2026:Dry stone Masonry for Retaining Walls using Departmental Rubble as per drawing and technical specification including cost and conveyance of all Materials and labour charges etc .complete

5.76

-

-

... More
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

4015

-

-

... More
12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20 (Without formwork) <br>

6.9

-

-

... More
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm

5

-

-

... More
Appendix B : Protective maintenance items

-

-

-

... More
OD127827/2024-2025:Hire charges of excavator of bucket capacity 0.9 cum, including operator, fuel etc.

40

-

-

... More
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.

24.6

-

-

... More
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.

8.23

-

-

... More
Appendix A : Reactive maintenance items

-

-

-

... More
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications

0.77

-

-

... More
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

21

-

-

... More
Appendix C : Premonsoon work

-

-

-

... More
OD127828/2024-2025:Hire charges for tipper (upto a capacity of 10 tonne ) for removing the debris and excess earth to dumping site including all leads etc completed as per the direction of department officer at site .

40

-

-

... More
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.