The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for General-construction Of School Building For Government Vocational Higher Secondary School Veeranakavu Thiruvananthapuram Phase I Civil Work in Thiruvananthapuram, Kerala, with an estimated contract value of Rs. 82,62,525. The bid opening date for this tender is 14-05-2025 and the last date for bid submission is 22-05-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date14 May 2025
Closing Date22 May 2025
Tender Amount₹ 82,62,525
Costs
EMD
₹ 50,000Document Cost
₹ 2,760Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_756668_2Bid Award Id
ViewTender No
TR/7214/2024_5_1_1/1Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
OD259633/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or not recoverable separately .All work up to plinth level
147.386
-
-
... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
20835.396
-
-
... More
OD259632/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work above plinth level up to floor V level
105.277
-
-
... More
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
14258.315
-
-
... More
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
320.78
-
-
... More
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
394.975
-
-
... More
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
623.224
-
-
... More
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
284.176
-
-
... More
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
39.54
-
-
... More
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide
126.9
-
-
... More
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
294.066
-
-
... More
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
60.492
-
-