The LSGD has issued a formal invitation for competitive bids for the Local Self Government Department project, for Mythri Vayanasala Building Construction in Kozhikode, Kerala, with an estimated contract value of Rs. 4,27,729. The bid opening date for this tender is 08-10-2019 and the last date for bid submission is 18-10-2019. Interested bidders for Local Self Government Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Local Self Government Department - LSGD Tender

Opening Date8 Oct 2019
Closing Date18 Oct 2019
Tender Amount₹ 4,27,729 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

2.7

-

-

... More
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide

25.7

-

-

... More
od137273/2019_2020 : Dry rubble masonry-Dry rubble without concrete levelling course masonry using deptl.rubble including<br>packing to compactness to lines and levels for road protection to withstand the dynamic loads due to<br>moving traffic including cost and conveyance of all materials labour charges etc complete as per direction<br>of departmental officers at site

4.525

-

-

... More
5.9.7 : Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)

4.9

-

-

... More
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers

83.668

-

-

... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

2561.932

-

-

... More
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size

9.499

-

-

... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)

1.8

-

-

... More
od137274/2019_2020 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer with power roller of minimum 8 tonnes and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. (Modified 2.3.1)

5.114

-

-

... More
BUILDING

-

-

-

... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete

27.36

-

-

... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform

28.417

-

-

... More
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15sup0/sup landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).

10.274

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.