Local Self Government Department Tender

... More
The LSGD has issued a formal invitation for competitive bids for the Local Self Government Department project, for Annual Plan_vatakara Municipality_project No-73/2024-25_construction Of Open Well_general Civil Work in Kozhikode, Kerala, with an estimated contract value of Rs. 5,93,071. The bid opening date for this tender is 29-04-2025 and the last date for bid submission is 10-05-2025. Interested bidders for Local Self Government Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Local Self Government Department - LSGD Tender

Works
Civil And Construction
Excavation
Water Storage And Supply
Eprocure
Opening Date29 Apr 2025
Closing Date10 May 2025
Tender Amount₹ 5,93,071 
Notes
Download

Costs

Summary

Annual Plan_vatakara Municipality_project No-73/2024-25_construction Of Open Well_general Civil Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock

139.71

-

-

... More
OD525389/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 3M TO 4.5M-RATE IS 2 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525391/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 4.5M TO 6M-RATE IS 3 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525388/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 6M TO 7.5M-RATE IS 4 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525393/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 7.5M TO 9M-RATE IS 5 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525390/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 9M TO 10.5M-RATE IS 6 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525394/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 10.5M TO 12M-RATE IS 7 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525392/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 12M TO 13.5M-RATE IS 8 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525385/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 13.5M TO 15M-RATE IS 9 TIMES RATE OF DAR 2.26.2)

16.12

-

-

... More
OD525386/2024-2025:Extra for every additional lift 1.5 m or part there of in excavation/banking excavated or stacked materials. For ordinary rock (FOR DEPTH 15M TO 16.5M-RATE IS 10 TIMES RATE OF DAR 2.26.2)

10.75

-

-

... More
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

7.15

-

-

... More
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining

47.3

-

-

... More
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

357.5

-

-

... More
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.

35.59

-

-

... More
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.