Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Kerala Water Authority - KWA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Nov 2022
Closing Date26 Nov 2022
Tender Amount₹ 6,06,260
Costs
EMD
₹ 15,300Document Cost
₹ 1,367Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_KWA_531333_1Bid Award Id
ViewTender No
E-Tender No.137/2022-23/EE/PH/TVLATender Authority
Kerala Water Authority ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
General conditions of E Tendering Process
BOQ Items
... More
Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the remaining
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe into the trenches,
placing in position, aligning the pipe to line and level and jointing the new pipe with
the existing pipe with solvent cement or any available joint and testing the pipeline by
operating the valves concerned, and rectifying the defects if noticed and without
causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, charges for removing surplus soil from work site,
including hire for tools and plant, conveyance of tools and materials, bailing out
water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling
etc., complete as per the direction of Departmental officers including the cost of pipe
and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming
to relevant standards: All Socketed Jointing.
35
-
1645.66
... More
Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the remaining
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe into the trenches,
placing in position, aligning the pipe to line and level and jointing the new pipe with
the existing pipe with solvent cement or any available joint and testing the pipeline by
operating the valves concerned, and rectifying the defects if noticed and without
causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, charges for removing surplus soil from work site,
including hire for tools and plant, conveyance of tools and materials, bailing out
water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling
etc., complete as per the direction of Departmental officers including the cost of pipe
and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming
to relevant standards: All Socketed Jointing.
15
-
1768.3
... More
Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the remaining
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe to the site, cutting and lowering new pipe into the trenches,
placing in position, aligning the pipe to line and level and jointing the new pipe with
the existing pipe with solvent cement or any available joint and testing the pipeline by
operating the valves concerned, and rectifying the defects if noticed and without
causing any damages to the existing utilities and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, charges for removing surplus soil from work site,
including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling
etc., complete as per the direction of Departmental officers including the cost of pipe
and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming
to relevant standards: All Socketed Jointing.
15
-
1993.24
... More
Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earth work excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damages to the existing utilities, including hire for tools and plant, conveyance of
tools and materials, bailing out water, providing caution boards, lighting, ribbon
fencing, watching, traffic control etc., complete as per the direction of Departmental
officers, including the cost of pipe & specials but excluding the cost of C.I.R.
Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: Socket & C.I.R. Jointing.
8
-
2235.54
... More
Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damage to the existing utilities, including hire for tools and plant, conveyance of tools
and materials, bailing out water, providing caution boards, ribbon fencing, lighting,
watching, traffic control etc., complete as per the direction of Departmental officers,
including the cost of pipe & specials but excluding the cost of C.I.R. Joints;
uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: C.I.R. Jointing.
10
-
2276.26
... More
Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earth work excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damages to the existing utilities, including hire for tools and plant, conveyance of
tools and materials, bailing out water, providing caution boards, lighting, ribbon
fencing, watching, traffic control etc., complete as per the direction of Departmental
officers, including the cost of pipe & specials but excluding the cost of C.I.R.
Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: Socket & C.I.R. Jointing.
8
-
2615
... More
Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damage to the existing utilities, including hire for tools and plant, conveyance of tools
and materials, bailing out water, providing caution boards, ribbon fencing, lighting,
watching, traffic control etc., complete as per the direction of Departmental officers,
including the cost of pipe & specials but excluding the cost of C.I.R. Joints;
uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: C.I.R. Jointing.
8
-
2636.39
... More
Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damage to the existing utilities, including hire for tools and plant, conveyance of tools
and materials, bailing out water, providing caution boards, ribbon fencing, lighting,
watching, traffic control etc., complete as per the direction of Departmental officers,
including the cost of pipe & specials but excluding the cost of C.I.R. Joints;
uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: C.I.R. Jointing.
8
-
3566.5
... More
Leak rectification work in 200mm uPVC (Class 2 to 6) pipeline including detecting
and locating leak, earthwork excavation in all kinds of soil for exposing leak portion
of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically
perpendicular to the axis of pipeline without causing any damages to the balance
portion, dismantling and lifting the pipe from trenches, smoothening the cut ends,
conveying the new pipe, cutting and lowering new pipe into the trenches, placing in
position, aligning the pipe to line and level and jointing the new pipe with the existing
pipe with solvent cement or repairable joint and testing the pipeline by operating the
valves concerned, and rectifying the defects if noticed and refilling the trenches in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, charges for removing surplus soil from work site, without causing any
damage to the existing utilities, including hire for tools and plant, conveyance of tools
and materials, bailing out water, providing caution boards, ribbon fencing, lighting,
watching, traffic control etc., complete as per the direction of Departmental officers,
including the cost of pipe & specials but excluding the cost of C.I.R. Joints;
uPVC Pipes and specials shall be of good quality and conforming to relevant
standards: C.I.R. Jointing.
8
-
4732.44
... More
Rectification of leakages in 150mm C.I. Pipe of all classes by replacing a length up to
1.5m including earthwork excavation in all kinds of soil for exposing leak portion of
the pipe including tar cutting / concrete cutting, cutting and removing and stacking
the damaged portion from the existing line without causing any damages to the
remaining portion and specials and conveying and replacing with the C.I. pipe and
conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or
any other available size suitable joints after cleaning the ends, grinding if necessary,
centering the pipe, inserting the joints, tightening to make a water tight joint, charging
and testing to the required pressure, rectifying any defects noticed and refilling the
trenches using excavated earth in layers not exceeding 20cm depth including
consolidating each layers by ramming, watering, removing the surplus soil from the
work site, without causing any damages to any other utilities, including the charges of
conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon
fencing, providing caution boards, traffic diversion but excluding cost of materials
and as per the direction of departmental officers etc., complete.
4
-
4579.05
... More
Rectification of minor joint leakages in 150mm C.I. Pipe including earthwork
excavation in all kinds of soil for exposing leaking joint including tar cutting /
concrete cutting, without causing any damages to the line and specials, cleaning the
joints including raking out the damaged lead wool, conveying and inserting hemp and
lead wool and caulking after cleaning the ends, charging and testing to the required
pressure, rectifying any defects noticed and refilling the trenches using excavated
earth in layers not exceeding 20cm depth including consolidating each layers by
ramming, watering, removing the surplus soil from the work site, without causing any
damages to any other utilities, including the charges of conveyance and hire for tools
and plant, bailing out water, lighting, watching, ribbon fencing, providing caution
boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete
4
-
2777.39
... More
Rectification of leakages of 32mm, 40mm & 50mm G.I. Pipes by replacing
lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing
leak portion of the pipe including tar / concrete cutting, by cutting, removing and
stacking the damaged portion from the existing line without causing any damages to
the remaining portion and specials and conveying and replacing with G.I. Pipes of
suitable size and jointing by thraded coupler and union of suitable size including
threading, alignment, laying and jointing to make a water tight joint, testing the line to
the required pressure, rectifying any defects noticed and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, removing the surplus soil from the work site, without
causing any damages to any other utilities, including the charges hire and conveyance
of tools, plant and materials to the leak site, bailing out water, lighting, watching,
ribbon fencing, caution boards, traffic diversion, including the cost of specials but
excluding cost of pipe and as per the direction of departmental officers etc., complete.
15
-
2214.17
... More
Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths
up to 1.0m by cutting, removing and stacking the damaged portion from the existing
line without causing any damages to the remaining portion and specials and
conveying and replacing with G.I. Pipes of suitable size and jointing by three run
welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc., complete.
14
-
1246.72
... More
Rectification of leakages of 65mm G.I. Pipes in exposed portions by replacing lengths
up to 1.0m by cutting, removing and stacking the damaged portion from the existing
line without causing any damages to the remaining portion and specials and
conveying and replacing with G.I. Pipes of suitable size and jointing by three run
welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc., complete.
10
-
1548.02
... More
Rectification of leakages of 80mm G.I. Pipes in exposed portions by replacing lengths
up to 1.0m by cutting, removing and stacking the damaged portion from the existing
line without causing any damages to the remaining portion and specials and
conveying and replacing with G.I. Pipes of suitable size and jointing by three run welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc., complete.
12
-
1757.23
... More
Rectification of leakages of 100 mm GI Pipes in exposed portions by replacing
lengths up to 1.0m by cutting, removing and stacking the damaged portion from the
existing line without causing any damages to the remaining portion and specials and
conveying and replacing with GI Pipes of suitable size and jointing by three run
welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc. complete.
8
-
2910.06
... More
Rectification of leakages of 150 mm GI Pipes in exposed portions by replacing
lengths up to 1.0m by cutting, removing and stacking the damaged portion from the
existing line without causing any damages to the remaining portion and specials and
conveying and replacing with GI Pipes of suitable size and jointing by three run
welding to make a water tight joint, painting the welded portion, testing the line to the
required pressure, rectifying any defects noticed, without causing any damages to any
other utilities, including the charges hire and conveyance of tools, plant and materials
to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards,
traffic diversion, necessary scaffolding including the cost of specials but excluding
cost of pipe and as per the direction of departmental officers etc. complete.
3
-
2882.45
... More
Rectification of leakages of 150mm G.I. Pipes by replacing lengths up to 1.0m
including earthwork excavation in all kinds of soil for exposing leak portion of the
pipe including tar / concrete cutting, by cutting, removing and stacking the damaged
portion from the existing line without causing any damages to the remaining portion
and specials and conveying and replacing with G.I. Pipes of suitable size and jointing
by thraded coupler and union of suitable size including threading, alignment, laying
and jointing to make a water tight joint, testing the line to the required pressure,
rectifying any defects noticed and refilling the trenches using excavated earth in
layers not exceeding 20cm depth including consolidating each layers by ramming,
watering, removing the surplus soil from the work site, without causing any damages
to any other utilities, including the charges hire and conveyance of tools, plant and
materials to the leak site, bailing out water, lighting, watching, ribbon fencing,
caution boards, traffic diversion, including the cost of specials but excluding cost of
pipe and as per the direction of departmental officers etc., complete.
6
-
4842.61
... More
Rectification of joint leakages in 150mm D.I. Pipe (cutting, removing and laying back
a length of 1.0m from one side of the joint) including earthwork excavation in all
kinds of soil for exposing leak portion of the pipe including tar cutting / concrete
cutting, by cutting and removing a portion of pipe from the damaged joint without
causing any damages to the remaining portion of the line and specials and replacing
the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe,
providing the joints, testing the line to the required test pressure, rectifying any
defects noticed and refilling the trenches using excavated earth in layers not
exceeding 20cm depth including consolidating each layers by ramming, watering,
removing the surplus soil from the work site, without causing any damages to any
other utilities, including the charges of hire and conveyance of tools, plants and
materials to the leak site, bailing out water, lighting, watching, ribbon fencing,
caution boards, traffic diversion but excluding cost of mechanical joint and as per the
direction of departmental officers etc., complete.
3
-
5685.39
... More
Disconnecting water connection from service mains along earthern road without
causing any damage to the existing line including charges of earth work excavation in
all kinds of soil for exposing connection point including tar cutting / conrete cutting if
any, making the disconnection point water tight charging and testing to the required
pressure, rectifying any defects noticed and refilling the trenches using excavated
earth in layers not exceeding 20cm depth including consolidating each layers by
ramming, watering, removing the surplus soil from the work site, without causing any
damages to any other existing utilities, including the charges of hire for tools and
plant, conveyance of tools and materials to the leak site, bailing out water, lighting,
watching, ribbon fencing, caution boards, traffic diversion but excluding cost of
materials and as per the direction of departmental officers etc. complete.
5
-
1156.76
... More
Disconnecting water connection from service mains along Concrete road without
causing any damage to the existing line including charges of earth work excavation in
all kinds of soil for exposing connection point including tar cutting / conrete cutting,
making the disconnection point water tight charging and testing to the required
pressure, rectifying any defects noticed and refilling the trenches using excavated
earth in layers not exceeding 20cm depth including consolidating each layers by
ramming, watering, removing the surplus soil from the work site, without causing any
damages to any other existing utilities, including the charges of hire for tools and
plant, conveyance of tools and materials to the leak site, bailing out water, lighting,
watching, ribbon fencing, caution boards, traffic diversion but excluding cost of
materials and as per the direction of departmental officers etc. complete.
5
-
1187.43
... More
Disconnecting water connection from service mains along Asphalt road without
causing any damage to the existing line including charges of earth work excavation in
all kinds of soil for exposing connection point including tar cutting / conrete cutting,
making the disconnection point water tight charging and testing to the required
pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by
ramming, watering, removing the surplus soil from the work site, without causing any
damages to any other existing utilities, including the charges of hire for tools and
plant, conveyance of tools and materials to the leak site, bailing out water, lighting,
watching, ribbon fencing, caution boards, traffic diversion but excluding cost of
materials and as per the direction of departmental officers etc. complete.
5
-
1179.12
... More
Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap
including all cost of materials, labour charges, hire for tools and as per the direction
of the department officers etc complete.
8
-
131.77
... More
Rectifying the leakages in boring point of public tap connection including earth work
excavation in all kinds of soil for exposing the boring point including concrete / tar
cutting, dismantling the damaged saddle piece,cutting and removing damaged portion
of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of
damaged portion of pipe and connecting with existing pipe line,testing the line to the
required test pressure, rectifying any defects noticed and refilling the trenches using
excavated earth in layers not exceeding 20cm depth including consolidating each
layers by ramming, watering, removing the surplus soil from the work site, without
causing any damages to any other utilities, including the charges of hire and
conveyance of tools, plants and materials to the leak site, bailing out water, lighting,
watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and
saddle piece and as per the direction of departmental officers etc. complete.
8
-
1798.45
... More
Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging
coolies, scrubbing twice, washing and cleaning using fresh water, including side wall,
floor slab and columns, disposing the the slurry / waste materials away from the
immediate premises and within the initial lead of 50m from the periphery of the tank,
without causing any damage to the existing structure and installations, charges
including the operation of valves, conveyance and hire charges of tools and as per the
direction of the department officers etc. complete.
300
-
46.02
... More
Bailing out water with 5HP engine and pump set including conveyance to the site,
erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil
and other stores pay of staff etc., complete.
25
-
37.4
... More
Refilling the trenches with a wet mix of close graded granular materials (Stone
aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size -
17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings -
4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers
not exceeding 150mm, compacting properly at Optimum Moisture Content with
Surface Plate Vibrator and disposing the excavated material etc. complete, including
traffic control, providing caution boards and as per direction of Engineer-in-charge
for road restoration works in pipeline leak sites.
2.25
-
7537.96
... More
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm
nominal size ) in pavements, laid to required slope and camber in panels as required
including consolidation finishing and tamping complete
2.7
-
8153.3
... More
App B- Cost of Materials
-
-
-
... More
Supply of 80 mm G.I.pipe (M) for maintenance work etc. complete as per
specifications.
6
-
805.28
... More
Supply of 65 mm G.I.pipe (M) for maintenance work etc. complete as per
specifications.
6
-
629.88
... More
Supply of 50 mm G.I.pipe (M) for maintenance work etc. complete as per
specifications.
6
-
494.33
... More
Supply of 40 mm G.I.pipe (M) for maintenance work etc. complete as per
specifications.
6
-
381.11
... More
Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as
per IS : 9523 :Upto 600 mm dia
0.99
-
21410.35