Kerala State Nirmithi Kendra Tender
... More
The KESNIK has issued a formal invitation for competitive bids for the Kerala State Nirmithi Kendra project, for Construction Works In Nss Training College Perunna Chenganassery Rusa Phase 2 in Alappuzha, Kerala, with an estimated contract value of Rs. 9,36,536. The bid opening date for this tender is 01-04-2025 and the last date for bid submission is 09-04-2025. Interested bidders for Kerala State Nirmithi Kendra tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 23,413Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Construction Works In Nss Training College Perunna Chenganassery Rusa Phase 2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KSNK_757558_1Bid Award Id
ViewTender No
KSNK/TECH/KZHY/NSSCHRY-58/2025Tender Authority
Kerala State Nirmithi Kendra ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs,
landings, balconies and access platform
68.22
-
-
... More
13.7.2
12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
211.77
-
-
... More
2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated
earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of
soil
12.93
-
-
... More
Supplying & Fixing Stainless Steel Incinerator,30 Kg Capacity, with all fixtures (Size 1m x1m)
1
-
-
... More
5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and
binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2642.7
-
-
... More
13.60.1
Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two
or more coats on new work
225.36
-
-
... More
5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams,
girders bressumers and cantilevers
114.18
-
-
... More
11.41.2
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer)
with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and
shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints
with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
8.1
-
-
... More
13.43.1
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall
surface:Water thinnable cement primer
225.36
-
-
... More
5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers,
Abutments, Posts and Struts
10.08
-
-
... More
13.7.1
12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
30.87
-
-
... More
4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40
nominal size)
0.55
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements