The KSEB has issued a formal invitation for competitive bids for the Kerala State Electricity Board project, for (part 1) Double Feeder From Chalaringal To Pongallur in Malappuram, Kerala, with an estimated contract value of Rs. 5,65,427. The bid opening date for this tender is 03-09-2019 and the last date for bid submission is 17-09-2019. Interested bidders for Kerala State Electricity Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Kerala State Electricity Board - KSEB Tender

Opening Date3 Sep 2019
Closing Date17 Sep 2019
Tender Amount₹ 5,65,427 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

(part 1) Double Feeder From Chalaringal To Pongallur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.

14

-

327

... More
Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle).

35

-

603

... More
Fitting one set AB switch and giving connection

2

-

1859

... More
Fitting one additional HT pin with insulator

90

-

99

... More
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.

60

-

320

... More
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

6

-

3197

... More
Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

16

-

1183

... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

14

-

2081

... More
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

12

-

507

... More
Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

29

-

2756

... More
Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

10

-

601

... More
Additional rate for excavation of Pit for 'A' type pole in Laterite.

6

-

434

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.

7

-

289

... More
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

35

-

914

... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.

3

-

578

... More
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.

8

-

361

... More
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

43

-

64

... More
Additional rate for excavation of Pit for 'A' type pole in Hard Laterite.

2

-

867

... More
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

36

-

320

... More
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

35

-

3802

... More
Renewing damaged PSC/RCC Transformer DP structure with new 'A' type Transformer DP and re- erecting all accessories & Transformer (excluding renewal of pipe earthing).

1

-

23813

... More
Drilling hole of various sizes on existing Channel/Cross Arm.

80

-

11

... More
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

0.5

-

9198

... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

12

-

1428.57

... More
Unforeseen

1

-

-

... More
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

6

-

160

... More
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.

3

-

1907

... More
Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

2

-

6967

... More
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

6

-

2033

... More
Additional rate for providing one disc set on any type of HT pole for making cut point.

48

-

105

... More
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

3

-

99

... More
Dismantling one section fuse

6

-

128



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.