Kerala State Electricity Board Tender
... More
The KSEB has issued a formal invitation for competitive bids for the Kerala State Electricity Board project, for Reconductoring Ht Oh Line From Panthakad Jn To Orbic Ab in Ernakulam, Kerala, with an estimated contract value of Rs. 5,24,287. The bid opening date for this tender is 11-11-2026 and the last date for bid submission is 21-11-2026. Interested bidders for Kerala State Electricity Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Kerala State Electricity Board - KSEB Tender - Kerala Tender
Opening Date11 Nov 2026
Closing Soon21 Nov 2026
Tender Amount₹ 5,24,287
Costs
EMD
₹ 13,200Document Cost
₹ 1,298Tender Fee
₹ 295
Summary
Reconductoring Ht Oh Line From Panthakad Jn To Orbic Ab
Description
Reconductoring Ht Oh Line From Panthakad Jn To Orbic Ab Under Electrical Section Aluva Town
Contact
Tender Id
2026_KSEB_887590_1Tender No
No.62 / EE / PMU-PBVR / 2026-27/ALV/09.11.2026Tender Authority
Kerala State Electricity Board ViewPurchaser Address
-Website
http://www.kseb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
RECONDUCTORING HT OH LINE FROM PANTHAKAD JN TO ORBIC AB UNDER ELECTRICAL SECTION ALUVA TOWN
RECONDUCTORING HT OH LINE FROM PANTHAKAD JN TO ORBIC AB UNDER ELECTRICAL SECTION ALUVA TOWN
BOQ Items
... More
Fitting one set (3No.) 11kV LA and giving connections excluding earthing.
3
481
1445.85
... More
Providing Cable Tie
120
3
462
... More
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
64
164
10538.88
... More
Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle).
20
762
15242.8
... More
Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
13
4089
53167.66
... More
Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.
7
1778
12448.24
... More
Dismantling one LT 2 line cross arm with clamp from existing pole and stacking.
8
70
560.4
... More
Dismantling one LT 4 line cross arm with clamp from existing pole and stacking.
11
104
1150.05
... More
Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
20
140
2801.8
... More
Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line.
11
210
2311.54
... More
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
5
1923
9618.2
... More
Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling.
3
469
1408.23
... More
Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking.
2
1589
3178.18
... More
Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil.
2
3056
6113.82
... More
Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
2
3433
6866.54
... More
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires.
10
492
4924.1
... More
Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
30
96
2885.4
... More
Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
15
149
2242.5
... More
Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification.
15
101
1521.15
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
18
868
15637.86
... More
Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete.
5
702
3512.75
... More
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges.
7
3142
21995.82
... More
Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole.
40
341
13674.4
... More
Fitting and erecting one HT PSC single pole in position without fitting cross arm, digging & back filling pit in ordinary soil (as per standards), drawing sufficient length of G I earthing leads from top of the post to the ground for earthing (excluding provision for earthing). For drawing HT ABC.
5
2642
13214.55
... More
Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil.
20
1373
27474.6
... More
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
15
434
6523.65
... More
Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles
1700
45
77554
... More
Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane
2
4999
9998.1
... More
Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.
25
1086
27155.75
... More
Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil.
15
592
8891.55
... More
Erection of suspension clamp for 11KV ABC of any size
55
164
9056.85
... More
Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.
1.7
13827
23506.21
... More
Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle).
5
906
4532.05
... More
Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole.
27
722
19505.07
... More
Insertion of one HT A type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).
2
4302
8604.1
... More
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same.
3
3129
9387.15
... More
Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store.
5
192
961.8
... More
Additional rate for excavation of Pit for A type pole in Hard Laterite.
3
1303
3911.04
... More
Additional rate for excavation of Pit for A type pole in Laterite.
2
651
1302.64
... More
Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.
5
4028
20141.45
... More
Fitting and erecting one HT ‘A ‘type single pole in position without fitting cross arm, digging & back filling pit in ordinary soil (as per standards), drawing sufficient length of G I earthing leads from top of the post to the ground for earthing (excluding provision for earthing). For drawing HT ABC.
3
3661
10983.57