Kerala Industrial Infrastructure Development Corporation Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Kerala Industrial Infrastructure Development Corporation - KINFRA Tender

Services
Eprocure
Opening Date20 Jun 2019
Closing Date4 Jul 2019
Tender Amount₹ 20,28,050 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Engaging qualified, experienced Helpers (male) – for WTP 1 each / shift (Men)- 3 shifts per day

36

-

-

... More
Sweepers for sweeping and cleaning of floors, walls, roofs etc of WTP and two raw water pump houses and yard daily (Men)

12

-

-

... More
Engaging qualified, experienced Chemist (WTP - Hi-Tech) (Men)

50

-

-

... More
PART-B

-

-

-

... More
Engaging qualified, experienced Pipeline Fitter for Intake well site & WTP (Men)

50

-

-

... More
Engaging qualified experienced Electrician for electrical repair works (Men)

50

-

-

... More
Engaging qualified, experienced Plumber - for O & M activities at Hi-Tech, WSS (Men)

50

-

-

... More
Lifting and carefully removing RCC / heavy duty CI cover slabs of manhole chambers for sluice valves, air valves, scour valves etc. of the pipelines removing the silt deposit, if any, cleaning the body of the valves chamber etc. and replacing the RCC cover slabs after the work carefully without any damage including seating the slabs in cm 1:5 to lines and levels etc.

50

-

-

... More
Earth work excavation by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm or on plan) , including dressing of sides and ramming of bottoms, lift upto 1.5m , including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of soil

250

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

250

-

-

... More
Filling with contractors own gravelly soil /sand including loading, unloading, and stacking for measurements and filling in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

25

-

-

... More
Cutting tarred surface of the road and disposal of debris as per direction of KINFRA Hi-Tech Park

60

-

-

... More
Cutting 350 mm DI pipes perpendicular to the axis of the pipe in trenches using DI pipe cutters wherever required without causing damages to the pipe

5

-

-

... More
Cutting 200 mm DI pipes perpendicular to the axis of the pipe in trenches using DI pipe cutters wherever required without causing damages to the pipe

5

-

-

... More
Cutting150 mm DI pipes perpendicular to the axis of the pipe in trenches using DI pipe cutters wherever required without causing damages to the pipe

5

-

-

... More
Dismantling the damaged 200mm D.I./ C.I pipes after taking out the pipes manually/ mechanical means breaking lead caulked joints / rubber rings as the case may be of pipes and specials at site within 50 m lead as per the direction of engineer in charge including stacking

15

-

-

... More
Dismantling the damaged 150 mm D.I./ C.I pipes after taking out the pipes manually/ mechanical means breaking lead caulked joints / rubber rings as the case may be of pipes and specials at site within 50 m lead as per the direction of engineer in charge including stacking

15

-

-

... More
Dismantling the damaged 350 mm D.I./ C.I pipes after taking out the pipes manually/ mechanical means breaking lead caulked joints / rubber rings as the case may be of pipes and specials at site within 50 m lead as per the direction of engineer in charge including stacking

10

-

-

... More
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron 200 mm pipes conforming to IS: 8329 (excluding cost of pipe) :

15

-

-

... More
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron150 mm pipes conforming to IS: 8329 (excluding cost of pipe) :

15

-

-

... More
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron 350 mm pipes conforming to IS: 8329 (excluding cost of pipe) :

10

-

-

... More
Providing joints to Centrifugally (Spun) 200 mm Cast Iron Pipes or Ductile Iron Pipes including testing of joints by Providing lead caulked joints to spun iron or C.I. pipes and specials including testing of joints but excluding the cost of pig lead and jointing materials :

1

-

-

... More
Providing joints to Centrifugally (Spun) 150 mm Cast Iron Pipes or Ductile Iron Pipes including testing of joints by Providing lead caulked joints to spun iron or C.I. pipes and specials including testing of joints but excluding the cost of pig lead and jointing materials :

1

-

-

... More
Providing joints to Centrifugally (Spun) 350 mm Cast Iron Pipes or Ductile Iron Pipes including testing of joints by Providing lead caulked joints to spun iron or C.I. pipes and specials including testing of joints but excluding the cost of pig lead and jointing materials :

1

-

-

... More
Providing flanged joints to 200 mm double flanged C.I./ D.I. pipes and specials, including testing of joints excluding cost of jointing materials:

4

-

-

... More
Providing flanged joints to 150 mm double flanged C.I./ D.I. pipes and specials, including testing of joints excluding cost of jointing materials:

4

-

-

... More
Providing flanged joints to 350 mm double flanged C.I./ D.I. pipes and specials, including testing of joints excluding cost of jointing materials:

2

-

-

... More
Providing push on joints to 200mm DI pipes including testing of joints using rubber rings

12

-

-

... More
Providing push on joints to 150 mm DI pipes including testing of joints using rubber rings

12

-

-

... More
Providing push on joints to 350 mm DI pipes including testing of joints using rubber rings

6

-

-

... More
Dismantling the existing sluice valves from the pipeline by cutting and removing the rusted nuts and bolts, disassembling the valve using necessary chain pulley block, taking out the spindle, shutter etc., cleaning the shutter, shutter groove with sharp chisel and Emrine cloth, applying grease and removing old packing etc and resetting and assembling the valve with new packing leather and gland packing rope, nuts and bolts including servicing, greasing and resetting the valve in the pipeline.

10

-

-

... More
Dismantling the existing foot valve of motor/pumps upto 49 HP, taking it out from the tank using necessary chain pulley block, and rectifing leakages including replacement of flaps and resetting the valve and relaying into the tank

5

-

-

... More
Rectification of leakages/breakage in 200 mm - 150mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.

10

-

-

... More
Rectification of leakages/breakage in 150 mm - 110 mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.

15

-

-

... More
Rectification of leakages in 110 mm - 40mm PVC pipelines by exposing the pipeline, cutting and dismantling the damaged pipe, laying and jointing new pipe bit using CID joint/coupling, solvent cement after making socket at both the ends of pipe if necessary etc, including protecting the sides of the trenches, bailing out water, controlling the valves, testing the pipe line, back filling etc as per the direction of Engineer - in - charge, excluding earthwork excavation and filling which will be paid seperately.

25

-

-

... More
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same upto 5 km distance and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.

50

-

-

... More
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same above 5 km distance upto 10km and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.

600

-

-

... More
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same above 10km distance upto 20km and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.

400

-

-

... More
Loading heavy dismantled parts of components, pipes and specials and other materials etc. carefully into lorries and transporting the same beyond 20km distance and unloading and stacking the materials at the destination including hire to lorry, wire rope, pully etc.

400

-

-

... More
Loading empty Chlorine cylinder to TCC and refilling chlorine cylinder (18 km) including loading & unloading , stacking at both ends. ( 3 cylinders in one load)

50

-

-

... More
Dismantling carefully motor of 75 HP vertical turbine pump set from the stool without damaging the motor by detaching cable connection, earthing, couplers etc… and taking out from the pump house using necessary chain pulley blocks and refixing the same after reparing (Repair Cost not Included)

3

-

-

... More
Dismantling carefully motor of 75 HP vertical turbine pump set from the stool without damaging the motor by detaching cable connection, earthing, couplers etc and Dismantling carefully the 75 HP V T pump, without damaging the same by detaching the column pipe, driving shaft, spider bushes, impellers, bearing / bushes etc... and taking out from the pump house using necessary chain pulley blocks and refixing the same after reparing.(Repair Cost not Included)

3

-

-

... More
Dismantling carefully the motor of centrifugal pump set up to 60 HP from the bed by detaching cable connections, couplers, foundation bolts etc... complete without damages to the same and taken out from pump house using necessary chain pulley blocks

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.