Kerala Electrical And Allied Engineering Company Limited Tender
... More
The KEL has issued a formal invitation for competitive bids for the Kerala Electrical And Allied Engineering Company Limited project, for Lac-ads-tirur Constituency-project No. 20705- Construction Of Buds Rehabilitation Center In Thirunnavaya Grama Panchayath, Malappuram District in Ernakulam, Kerala. The bid opening date for this tender is 26-04-2025 and the last date for bid submission is 30-04-2025. Interested bidders for Kerala Electrical And Allied Engineering Company Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KEL_761331_1Bid Award Id
ViewTender No
KRO/BDC/1970/2025Tender Authority
Kerala Electrical And Allied Engineering Company Limited ViewPurchaser Address
-Website
http://https://www.kel.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
624
-
-
... More
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
92.4
-
-
... More
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
7.58
-
-
... More
EXCLUSIVE OF GST
-
-
-
... More
8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
-
-
-
... More
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
8746.8
-
-
... More
5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
-
-
-
... More
6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
-
-
-
... More
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15sup0/sup landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
58.28
-
-
... More
CIVIL WORK
-
-
-
... More
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
45
-
-
... More
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
61.92
-
-
... More
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
-
-
-
... More
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
367.29
-
-
... More
50.6.7.1 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
72.03
-
-
... More
16.78.3 : Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20
73.62
-
-
... More
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
215.46
-
-
... More
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
276.03
-
-
... More
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
156.68
-
-
... More
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
6.07
-
-
... More
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
-
-
-
... More
GRANULAR SUB BASE: Quantity by level calculation & reporting to CTE as per norms
-
-
-
... More
7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference
-
-
-