Irrigation Department Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Irrigation Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date20 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 10,30,70,555 
Notes
Download

Costs

Summary

Renovation Of Groynes At Poonthura

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
OD39212/2023-2024:A.S.E - Groynes works- Thiruvananthapuram- Supplying and Laying toe mound layer using 500 kg to 1000kg and secondary layer using 300kg to 600 Kg blasted granite stones of specific gravity not less than 2.65 as per approved design , including supply of stones, loading from quarry to tipper by crane and conveying to site, weighing on departmental weigh bridge for measurement , unloading and dumping and packing in position at site to lines and levels to form the armour layer over the secondary layer already laid, with heavier stones on top layer, by re-handling stones, packing for forming the section with the help of crane, floating arrangement if necessary, including hire and operational charges of all tools and plants , wages of divers and all sundry expenses , providing and maintaining the top surface of runway for the movement of vehicles, crane using spalls gravel or sand etc complete as per the direction of departmental officers at site

24512.42

-

-

... More
OD39216/2023-2024:A.S.E - Groynes works- Thiruvananthapuram- Supplying and Providing Armour Layer using 1500kg 2500kg blasted granite stones of specific gravity not less than 2.65 as per approved design , including supply of stones, loading from quarry to tipper by crane and conveying to site, weighing on departmental weigh bridge for measurement , unloading and dumping and packing in position at site to lines and levels to form the armoury layer over the secondary layer already laid, with heavier stones on top layer, by re-handling stones, packing for forming the section with the help of crane, floating arrangement if necessary, including hire and operational charges of all tools and plants , wages of divers and all sundry expenses , providing and maintaining the top surface of runway for the movement of vehicles, crane using spalls gravel or sand etc complete as per the direction of departmental officers at site

5538.11

-

-

... More
OD36925/2023-2024:Moulding and supplying cement concrete 2 cum(5T) tetrapod with graded aggregate of 40% 75mm to 40mm,30% 40mm to 20mm and 30% 20mm to 5mm using 380kg cement/ m3 of concrete as perapproved mix design of mix proportion 0.5:1.46:3.22 by weight of water cement, fineaggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimumcube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimumdensity of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould,curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site .

1133

-

-

... More
OD36959/2023-2024:Conveying 2cum (5T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of groynes to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc., complete as per the direction of the departmental officers at site

1133

-

-

... More
OD37057/2023-2024:Moulding and supplying cement concrete 1 cum(2.5T) tetrapod with graded aggregate of 40% 75mm to 40mm,30% 40mm to 20mm and 30% 20mm to 5mm using 380kg cement/ m3 of concrete as per approved mix design of mix proportion 0.5:1.46:3.22 by weight of water cement, fine aggregate, coarse aggregate (specific gravity of fine aggregate and coarse aggregate should not be less than 2.73 and 2.5 respectively) and the cement shall be 43 grade or higher) minimum cube strength requirement (i) @7 day - 20 N/mm2 (ii) @ 28 day - 30 N/mm2 and minimum density of concrete 2.5 g/cc including hire and operational charges of tools and plants, mould,curing, rehandling and stacking charges etc., complete as per the instruction of departmental officers at site .

2590

-

-

... More
OD37065/2023-2024:Conveying 1cum (2.5T) tetrapod from stacking yard and placing in position in two layers according to specification and forming the armour layer of groynes to lines and levels over the secondary armour layer including hire and operational charges of tools and plants etc.,complete as per the direction of the departmental officers at site

2590

-

-

... More
OD38914/2023-2024:Conducting Bathymetric survey for 5 profiles at 50 m intervals for a depth of 10m in the sea including plotting, profiling and submitting the reports in soft and hard copy etc.as per the direction of departmental officers at site etc complete.

30

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.