Indian Navy Tender

... More
The Indian Navy has issued a formal invitation for competitive bids for CATEGORY: Repair and Overhauling Service - ELECTRICAL WORK PACKAGE ONBOARD INS KABRA MR 25; ELECTRICAL WORK PACKAGE ONBOARD INS KABRA MR 25; Yes; Buyer Premises in Ernakulam, Kerala. The bid opening date for this tender is 02-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Indian Navy tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Indian Navy Tender

Goods
Electrical and Electronics
Electrical Works
GEM
Opening Date2 May 2025
Closing Date30 May 2025
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RENEW DEFECTIVE CABLES

20

-

-

... More
MR3-CARRY OUT COMPLETE ROUTINES/ OVERHAULING OF SCB/ BUS BARS, BREAKERS, PROTECTION CIRCUIT COMPONENTS, INDICATION LAMPS, OTHER UNITS/ COMPONENTS (LIKE CTS ,PT, SWITCHES ETC.) AND REWIRING AS REQUIRED. (WHEREVER APPLICABLE). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

10

-

-

... More
OVERHAULING OF COMPILOT UNIT. IF FOUND UNSAT, REPLACE ALL DEFECTIVE COMPONENTS WITH NEW ONE, POST OVERHAULING PRESENT THE SYSTEM FOR HATS/SATS TO INSPECTING AUTHORITY.

1

-

-

... More
CHECK THE CABLE GLAND FOR PROPER FITNESS. IF REQUIRED CHANGE THE GLAND PACKING.

1

-

-

... More
REPEATER CONNECTION JB OF BRIDGE WING PORT & STBD ,BRIDGE TOP &BRIDGE BROKEN/CORRODED. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

4

-

-

... More
CARRY OUT SR AND NR ROUTINES ON ANSCHUTZ GYRO STD 22 AS PER MT 67023 AS FOLLOWS: - SR1-RENEW SUPPORTING LIQUID, DISTILLED WATER AND CARRY OUT FOLLOWING CHECKS:- (A) SWITCH 'ON' GYRO COMPASS AND CHECK ITS PERFORMANCE. (B) CHECK FOLLOW-UP SYSTEM WITH GYRO COMPASS. (C) CHECK SENSITIVITY OF FOLLOW-UP SYSTEM, IT SHOULD NOT BE LESS THAN 70 DEGREES/ SECOND. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT

2

-

-

... More
MAGNETIC COMPASS FEED NOT AVAILABLE IN COMPILOT, SUSPECT FEED NOT AVAILABLE , REPLACE THE CABLE FROM COMPASS TO COMPILOT IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
ROTATING ASSEMBLY MALFUNCTIONING. REMOVAL OF WIPER ASSEMBLY AND CARRY OUT OVERHAULING. PROCURE AND REPLACE ROTATING ASSEMBLY AND BELT. STW AND TRIAL TO BE CARRIED OUT.

5

-

-

... More
PORT DA NOT TRANSFER CONTROL SUPPLY TO ANOTHER DA IN AUTO MODE WHILE SHIFTING OF SUPPLY CHANGE OVER. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
REMOVAL OF OLD UPS (3 KVA & 1 KVA KVA) OF GYRO , COMPILOT, RADAR 1 & 2, SDR NC, EM LOG, ECHO SOUNDER, LINK II, ECDIS, TELEPHONE EXCHANGE, MB SRE, AND COMMUNICATION EQUIPMENT IN BRIDGE AND EDA COMPARTMENT.

12

-

-

... More
(A) REMOVAL FROM SHIP.

1

-

-

... More
ECHO SOUNDER FEED IS NOT INTERFACED WITH ECDIS, WSDS AND ALL OTHER ASSOCIATED DEVICES. SUSPECT CABLE DAMAGED. REPLACEMENT OF CABLE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
MAGNETIC COMPASS FEED NOT AVAILABLE IN GYRO DDU. SUSPECT CABLE DAMAGED. LAYING OF NEW CABLE. SERVICEABILITY CHECKS AND PROVING OF SYSTEM TO THR TRIAL TEAM.

1

-

-

... More
(F) TEST AFTER RE-INSTALLATION.

1

-

-

... More
MR6 - CARRY OUT STW AND FUNCTIONAL TRIAL OF THE SWITCHBOARDS POST ROUTINES / OVERHAUL. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE.

3

-

-

... More
CALIBRATION OF WIND SPEED & DIRECTION INDICATOR.

1

-

-

... More
POST REPAIR/ROUTINES,TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED.

1

-

-

... More
MOB SYSTEM ALARM NOT WORKING AT VARIOUS PLACES(04), SUSPECT WIRING OF SYSTEM PERISHED AND CORRODED. REPLACEMENT OF WIRING AND HOOTER OF SYSTEM.

2

-

-

... More
(B) STRIPPING.

9

-

-

... More
VIDEO PROCESSOR AND SIGHT PADESTIAL DSP CARD MALFUNCTIONING, REPLACE IF REQUIRED. STW AND TRIAL TO BE CARRIED OUT

1

-

-

... More
NR2-EXAMINE THE TRANSDUCER AND CASINGS.PRESERVE THE TRANSDUCER SURFACE DURING DRY-DOCKING. CARRY OUT VISUAL EXAMINATION OF THE TRANSDUCER CABLES, CHECK CONTINUITY AND INSULATION. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
POWER FACTOR METER OF ALL THREE DAS ARE SHOWING IRRATIC READING .METERS TO BE RECTIFIED . IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

3

-

-

... More
INTERMITTEN MALFUCTIONING OF OVER VOLTAGE AND UNDER VOLTAGE RELAY OF SHORE SUPPLY UNIT OBSERVED WHILE TAKING ON LOAD . CALIBRATION OF THE RELAY TO BE CARRIED OUT . IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

7

-

-

... More
(D) GAMMA ZONE MONITER, (GA720M) (QTY-1)

1

-

-

... More
CARRY OUT SR AND NR ROUTINES ON KELTRON ECHO SOUNDER AS PER MAINTOP NO. MT 67282 AS FOLLOWS: - SR1-CARRY OUT THE PRINTER AND SPEED CONTROL CHECKS AS PER INBR 2651(2), PART II, PARA 2.3.10. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE

1

-

-

... More
SR2-OVERHAUL THE EQUIPMENT (ANTENNA, OPERATER UNIT, INTERFACE UNIT). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

2

-

-

... More
CEREMONIAL LIGHTS CABLES PERSHIED AND CONNECTION BOX CORRODED AT VARIOUS PLACES, REWIRING AND REPAIR OF CONNECTION BOX AT WEATHER DECK.

8

-

-

... More
NR1-OVERHAUL STARTERS PANEL REPLACE THE DEFECTIVE COMPONENTS. CARRY OUT TRIALS ON COMPLETION OF REPAIRS.

6

-

-

... More
POST OVERHAULING SYSTEM TO BE OFFERED TO NAVAL INSPECTION AUTHORITY

1

-

-

... More
(V) TEST FOR OSCILLATOR CARD (PB 8).

1

-

-

... More
FLOOD LIGHTS OF FLAG DECK AND PORT & STBD BRIDGE WING CORRODED, REPLACEMENT OF LIGHTS AND LIGHTS BASE PLATE FITMENT.

4

-

-

... More
IR, TI AND CCD CAMERA FEED NOT AVAILABLE OR CAMERA PERFORMANCE DEGRADED. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
SERVICEABILITY CHECKS OF SART.

1

-

-

... More
CALIBRATION OF FOLLOWING METERS OF NBC EQUIPMENT (30101.01 - 30101.04) TO BE CARRIED OUT :-

5

-

-

... More
MAGNETIC COMPASS SIGHT GLASS BROKEN. REPLACE WITH NEW ONE.

1

-

-

... More
HEATING/TEMAPTURE PCB OF GYRO MASTER UNIT MALFUNCTIONING. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
POWER SUPPLY UNIT MALFUNCTIONING, IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
(I) ANTI CONDENSATION HEATER TEST.

1

-

-

... More
(B) DIGITAL GENERAL PURPOSE RADIATION SURVEY METER (QTY-01.

1

-

-

... More
ANTEENA OF AIS NOT RECEIVING ANY SATELLETIE RECEPTION, SUSPECT AIS NOT WORKING, REPLACE THE ANTEENA ALONG WITH CABLE IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT REPLACEMENT OF AC AND DC OPRATED LAMPS AND LAMP HOLDERS.

3

-

-

... More
CARRY OUT COMPLETE OVERHAULING OF THE EQUIPMENT & TEST FOR OPTIMUM PERFORMANCE. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
JOYSTICK OF SOP MALFUNCTIONING. REPLACE IF REQUIRED. STW AND TRIAL TO BE CARRIED OUT

1

-

-

... More
POST REPAIR/ROUTINES, TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED.

1

-

-

... More
(VII) TEST FOR DETECTOR CARD (PB 7).

1

-

-

... More
POST REPAIR/ROUTINES, TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED.

1

-

-

... More
(A) INSPECT LUGS/ CONNECTORS/ CT/ PT AND OTHER COMPONENTS AND UNDERTAKE REPAIR DETERIORATION/ DAMAGE OF MSB CABLES/ WIRING AS NECESSARY.

12

-

-

... More
CALIBRATION OF FOLLOWING METERS OF MAIN SWITCH BOARD (A) VOLTAGE METER (QTY-05) (B) AMMETER (QTY-05) (C) FREQUENCY METER (QTY-05) (D) KW METER (QTY-03) IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

18

-

-

... More
ERRATIC OUTPUT VOLTAGE OBSERVED FROM 415V/230V STEP DOWN TRANSFORMER AT FER AND AER . SUSPECT INSULATION OF WINDING LOW . OVERHAULING OF MAIN TRANSFORMERS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

3

-

-

... More
MR2-DOCKYARD TO SURVEY AND OVERHAUL/ RENEW IF NECESSARY. OVERHAUL INCLUDES (30008.04 - 30008.11). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. :-

10

-

-

... More
GYRO CABLE AT DIFFERENT LOCATIONS DAMAGED. RENEWAL OF CABLE (6 CORE 6 SQMM SHIELDED CABLE FROM DATA DISTRIBUTION UNIT TO PELOROUS REPETERS, JUNCTION BOX (BRIDGE TOP, BRIDGE WING PORT AND BRIDGE WING STBD).

100

-

-

... More
NR2 - CARRY OUT FUNCTIONAL CHECKS OF ALL SWITCHBOARDS BREAKERS FOR PROPER OPERATION. RAISE SPECIFIC DEFECT TO DOCKYARD IF ANY. BREAKERS TO BE CALIBRATED AS PER DUE DATE. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

5

-

-

... More
(D) CARRYOUT FUNCTIONAL CHECKS OF MSB AND PARALLELING TRIALS WITH ALL COMBINATIONS OF GENERATOR SUPPLY.

20

-

-

... More
CARRY OUT SWING CHECK AND CALIBRATE THE COMPASS AS PER NAVAL STANDARD. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT FUNCTIONAL CHECKS OF THE SYSTEM AND CHECK ALL INPUTS FROM GYRO, ECHO SOUNDER, RADAR, EM LOG, GPS AND DGPS ETC. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
NR4-CARRY OUT THE OVER ALL SYSTEM TEST IN ACCORDANCE WITH MAINTENANCE MANUAL 2650(2), CHAPTER 9. POST OVERHAULING SYSTEM TO BE OFFERED TO NAVAL INSPECTIONG AUTHORITY FOR HAT'S & HAT'S TRIAL

1

-

-

... More
SR4-SERVICE THE ECHO SOUNDER PCBS IN ACCORDANCE WITH THE INBR 2651(2), PART II, PARA 3.2. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
NR3 - CARRY OUT CALIBRATION OF PROTECTION CIRCUIT RELAYS/ GSKS AND SUBSEQUENTLY CARRYOUT PROTECTION CIRCUIT CHECKS ONBOARD (OVER VOLTAGE, UNDER VOLTAGE, REVERSE POWER AND OVER SPEED) DURING LOAD TRIALS OF DAS/ TAS/ GTGS/ DGS OF SHIPS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

5

-

-

... More
PREPARATION OF FOUNDATION FOR FITMENT OF RUGGEDISED UPS OF GYRO, COMPILOT, RADAR 1 & 2, SDR NC, EM LOG, ECHO SOUNDER, LINK II, ECDIS, TELEPHONE EXCHANGE, MB SRE AND COMMUNICATION EQUIPMENT IN BRIDGE AND EDA COMPARTMENT AS PER SAMPLE PROVIDED. MAT MS.

12

-

-

... More
MR3 - CARRY OUT COMPLETE ROUTINES/ OVERHAULING OF SWITCHBOARD/ BUSBARS, BREAKERS, PROTECTION CIRCUIT COMPONENTS, INDICATION LAMPS, OTHER UNITS/ COMPONENTS (LIKE CTS, PARALLELING UNIT, SWITCHES ETC.) AND REWIRING AS REQUIRED. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

20

-

-

... More
NR1-REMOVE MAIN RECORDER, REPEATER AND THE TRANSDUCER TO THE SHOP FOR OVERHAUL AND CALIBRATION. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
5 IN NO'S COURSE BUS PORT OF INTERFACE PCB IN DATA DISTRIBUTION UNIT (DDU) NOT WORKING. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
SUB OPTIMAL PERFORMANCE OF ECHO SOUNDER OBSERVED, SUSPECT TRANSDUCER WAS DEFECTIVE. REPLACE THE TRANSDUCER IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
LOG SHOWING ERRATIC READING IRO GPS, CALIBRATION OF LOG TO BE UNDERTAKEN. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
NR1-REMOVE THE MASTER UNIT TO SHOP FLOOR, CARRY OUT OVERHAUL AND SHOP TRIALS.PROCURE AND REPLACE IF ANY DEFECTIVE. STW AND TRIAL TO BE CARRIED OUT AS PER NAVAL STANDARD.

2

-

-

... More
(E) RE-PACKING OF GLANDS.

6

-

-

... More
NR5-EXAMINE AND REFIT THE PICK UP HEAD AND REPEATERS UNITS. Pick up head -1, Repeater - 2

3

-

-

... More
CARRY OUT PERFORMANCE CHECKS OF TRANSRECEIVER AS PER DETAILS GIVEN IN SECTION 3.3 OF TECHNICAL MANUAL

1

-

-

... More
REPAIR AND CALIBRATION OF VARIOUS SAFETY RELAY AT VARIOUS LOCATIONS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

25

-

-

... More
UPGRADATION OF ECDIS 4000 TO ECDIS 4100 AS PER OBSERVATION OF COMSAT 24. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT OVERHAULING OF ULTRASONIC WIND SENSOR. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CHECK THE DISPLAY BRILIENCY AND FUNCTIONALITY PERFORMANCE, REPLACE IF SUBOPTIMAL

1

-

-

... More
(III) TEST FOR I/O CARD (PB 4).

1

-

-

... More
OVER LOAD KNOB IN SWITCH BOARD MALFUNCTIONING, IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

18

-

-

... More
ECDIS INTERFACE UNIT MALFUNCTION, REPLACE WITH NEW ONE IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
REPLACEMENT OF RT 6222 WITH NEW RT 6222 (DEMANDED VIDE PTS). LOAD TRIALS WITH AGENCIES AND PROVING OF SYSTEM

1

-

-

... More
ROUTING OF POWER CABLES ACROSS BRIDGE FOR POWER DISTRIBUTION. TOTAL LENGTH 200 MTRS.

12

-

-

... More
MOTOROLAS MALFUNCTIONING. SERVICEABILITY CHEKS OF ALL MOTOROLAS. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

11

-

-

... More
SR3-CARRY OUT VISUAL EXAMINATION OF PCBS VIZ. PC1 TO PC11 IN ACCORDANCE WITH ANNUAL MAINTENANCE SCHEDULE OF INBR 2651(2), PART II, PARA 2.4.1. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
NR2-CARRY OUT THE TEST FOR REPEATER DISTRIBUTION UNIT (RDU) AND RE TRANSMISSION UNIT (RTU) IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 7.

2

-

-

... More
(B)REPLACE BUSBARS INSULATORS IF NECESSARY.

3

-

-

... More
(X) TEST FOR DISPLAY CONTROLLER CARD (PB 13).

1

-

-

... More
OVERHAULING OF ANNEMOMETER INTERFACE UNIT AND PROVING TO USERS INTERFACE. STW AND TRIAL TO BE CARRIED OUT

1

-

-

... More
(D) RE-PAINTING CASES.

1

-

-

... More
(C) CONTAMINATION MONITER (CM4556) (QTY-1)

1

-

-

... More
ANODE AND CATHODE JB OF ICCP SYSTEM CORRODED AT FER, JB TO BE REPLACE. STW AND TRIAL TO BE CARRIED OUT.

2

-

-

... More
SERVICEABILITY CHECKS OF MSS TRANSRECIVIER. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
FAULT IN REVERSE POWER AND FORWARD POWER OF AIS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT,

1

-

-

... More
SR3-INSPECT THE SHOCK MOUNTS FOR DAMAGE/DETERIORATION, IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT

20

-

-

... More
SR3-REPLACE MICRO SWITCHES MOUNTED TO THE NFU STEERING LEVERS, OUTPUT RELAYS AND POTENTIOMETERS. IF FOUND UNSAT, REPLACE ALL DEFECTIVE COMPONENTSWITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

9

-

-

... More
(VIII) TEST FOR CALIBRATION CARD (PB 9).

1

-

-

... More
WIPER MOTER NOT WORKING. OVERHAULING OF WINDOW WIPPER MOTORS. PROCURE AND REPLACE BEARINGS. CHECK INSULATION OF MOTORS POST OVERHAULING IT SHOULD BE MORE THAN 1 MEGA OHM. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

5

-

-

... More
(XII) TEST FOR ALPHA NUMERIC DISPLAY CARD (PB 11).

1

-

-

... More
SR2-CHECK THE CONDITION OF SHOCK/VIBRATION MOUNTS, IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT

4

-

-

... More
LOW INSULATION HOOTER OF MAIN SWITCHBOARD CONTINOUS RAISE ALARM ,INTERNAL WIRING OF HOOTER TO BE CHANGE .

1

-

-

... More
LRF FEED NOT AVAILABLE, SUSPECT EL ENC CABLE DEFECTIVE, REPLACE IF REQUIRED. STW AND TRIAL TO BE CARRIED OUT

1

-

-

... More
ERRATIC READING OBSERVED IN MAGNETIC COMPASS, SUSPECT LIQUID LEVEL LOW, REPLACE THE LIQUID. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
POST REPAIR/ROUTINES. TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED.

3

-

-

... More
(I) FU AMPILIFIER CARD

3

-

-

... More
LOG FEED IS NOT INTERFACED WITH ALL OTHER ASSOCIATED DEVICES. SUSPECT CABLE DAMAGED. REPLACEMENT OF CABLE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
SUB OPTIMAL PERFORMANCE OF LOG OBSERVED, SUSPECT TRANSDUCER WAS DEFECTIVE. REPLACE THE TRANSDUCER IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
MOB SYSTEM ALARM NEW CABLE PLACEMENT FROM BRIDGE TO QUARTERDECK ALONG WITH THE HOOTER INSTALLATION.

1

-

-

... More
VSWR FAULT IN AIS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT,

1

-

-

... More
NR2-CARRY OUT OVERHAULING OF REPEATERS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

8

-

-

... More
(A) PERSONAL DOSIMETER (PDM521N) (QTY-05)

5

-

-

... More
ERRATIC OUTPUT VOLTAGE OBSERVED IN ICCP SYSTEM, SUSPECT ICCP SYSTEM'S PCBS MALFUNCTIONING, AND VOLTAGE AND RE ROTARY SWITCH NOT WORKING IN SYSTEM. OVERHAULING OF SYSTREM TO BE CARRID OUT. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
LRF MALFUNCTIONING. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
(XI) TEST FOR NUMERIC DISPLAY CARD (PB 12).

1

-

-

... More
MR2 - REPLACE ALL DEFECTIVE SV MOUNTS.

12

-

-

... More
CARRY OUT VISUAL INSPECTION OF SHOCK MOUNTS. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT

2

-

-

... More
RENEWAL OF FOUNDATION PLATE OF ULTRASONIC SENSOR AS PER DIMENSION.

1

-

-

... More
CONTROL PANEL MALFUNCTIOING. OVERHALING OF WINDOW WIPER CONTROL PANEL, POST OVERHAULING CHECK FOR PROPER OPERATION. STW AND TRIAL TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

5

-

-

... More
NR1-LAND EQUIPMENT TO SHOP FLOOR FOR OVERHAULING AND SERVICEBILTY CHECKS.OST COMPLETION OF ROUTINES TRIALS TO BE OFFERED AS PER NAVAL STANDARDS.

1

-

-

... More
CARRY OUT CALIBRATION/SERVICIBLITY CHECKS OF FOLLOWING UNITS :-

1

-

-

... More
MR4-CARRY OUT REWIRING OF CONTROL CIRCUITS IF REQUIRED. REPLACE LUGS AS REQUIRED AND ENSURE PROPER TERMINATION. (WHEREVER APPLICABLE)

10

-

-

... More
(C) REPAIR AS NECESSARY.

1

-

-

... More
WEATHER DECK LIGHTS OF UPPER DECK ARE CORRODED, ALL LIGHTS TO BE REPLACED.

16

-

-

... More
(III) NAUTO SIGNAL ALARM UNIT

1

-

-

... More
BATTERY NOT HOLDING CHARGE. PROCURE AND REPLACE BATTERY.

1

-

-

... More
CARRY OUT12K ROUTINE ON PORT, STBD AND CENTRE MAIN ENGINE AS PER MAINTOPS NO.MT23055 AS FOLLOWS 6K H1- BEFORE STARTING MAINTENANCE WORK, PERFORMA A TEST RUN , RECORD THE ENGINE PARAMETERS, DRAIN ENGINE COOLANT, AND FLUSH COOLANT CIRCUITS WITH WATER .DR ENTAILS (i) DURING TEST RUN ALL PARAMETER TO BE RECORDED (ii) DRAIN ENGINE COOLANT FROM ENGINES (iii) BY USING COOLANT FLUSH ADDITIVE CICUTE TO BE CLEANED

22

-

-

... More
AIS FEED NOT AVAILABLE IN MDA, SUSPECT CABLE DEFECTIVE, REPLACE THE CAB LE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT SR AND NR ROUTINES ON LINK II SYSTEM AS PER MT 753033 AS FOLLOWS: - SR1-CARRY OUT SERVICEABILITY CHECKS OF ALL RF MODEM CARDS, SERIAL CARDS, POWER SUPPLY CARDS AND RAID CARD IN SERVER AND SADL.(ROUTINE OF RAID CARD NOT APPLICABLE TO LINK II MOD I VER 2.4). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
ECHO SOUNDER SHOWING ERRATIC READING , CALIBRATION OF ECHO SOUNDER TO BE UNDERTAKEN DURING DOCKING.IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT SR ROUTINES ON DGPS (02) AS PER MAINTOP NO. MT 67608 AS FOLLOWS: - SR1-CARRY OUT INSPECTION OF ALL UNITS FOR PROPER EARTHING AND BONDING, RENEW IF NECESSARY.

2

-

-

... More
ARMS AND BLADES ARE DAMAGED. PROCURE AND REPLACE ARMS AND BLADES.

10

-

-

... More
CHANGE OVER FROM AUTO TO MANUAL WAS NOT PERFRORMING , SUSPECT FEED NOT AVAILABLE TO HANDLE , REPLACE THE HANDLE IF REQUIRED. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
AUTO CHANGE OVER SWITCH FOR DDU POWER SUPPLY CHANGE OVER NOT WORKING IN AUTO MODE. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
CARRY OUT SR AND MR ROUTINES ON SHORE SUPPLY CONNECTION BOX AS PER MAINTOP NO. MT 53500 AS FOLLOWS: - SR2-CALIBRATE PANEL INSTRUMENTS/ METERS (WHEREVER APPLICABLE). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. PANEL 1 & METERS 4 QTY.

5

-

-

... More
REMOVAL AND REFITMENT OF MAGNETIC COMPASS PEDESTAL VIEW WATER SEPAGE INSIDE BRIDGE THROUGH MAGNETIC COMPASS STAND. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT SR ROUTINES ON AIS AS PER MAINTOP NO. MT 734001 AS FOLLOWS: - SR1-CHECK SENSOR FOR CONTAMINATION DUE TO EXHAUST GASES, WASH IT WITH FRESH WATER AND MILD SOAP SOLUTION AS NECESSARY. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
AUTO CHANGE OVER SWITCH FOR DATA CHANGE OVER NOT WORKING IN AUTO MODE. DEFECT TO BE RECTIFIED

1

-

-

... More
CARRY OUT NR ROUTINES ON KELTRON EM LOG AS PER MT 6724421 AS FOLLOWS: - NR1-CARRY OUT THE FOLLOWING TESTS (30029.01 - 30029.13)IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 6:-

1

-

-

... More
NR3-CARRY OUT THE TEST FOR SIMULATION CARD IN ACCORDANCE WITH MAINTENANCE MANUAL 2650(2), CHAPTER 8.

1

-

-

... More
NR5 - MEASURE AND RECORD THE INSULATION RESISTANCE OF MSB. IT SHOULD BE 2 MΩ. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

4

-

-

... More
POST REPAIR/ROUTINES, TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED.

2

-

-

... More
AIS NOT SWITCHING ON, SUSPECT AIS POWER SUPPLY PCB NOT WORKING, REPLACE THE PCB ALONG WITH ASSOCIATED COMPONENTS IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
MICROPHONE CABLE DAMAGED. REPLACE MICROPHONE CABLE.

1

-

-

... More
SR2-CHECK THE SHOCK/VIBRATION MOUNTS, RENEW IF NECESSARY. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

1

-

-

... More
(II) TEST FOR MICRO PROCESSOR CARD (PB 3).

1

-

-

... More
DIGITAL PELOURS REPEATER NOT WORKING AT VARIOUS PLACES. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.

3

-

-

... More
SR5-CARRY OUT SPM CHECKS. OVERHAULING OF MOTORS , REPLACE BEARINGS OF THE MOTORS. AND FORWARD SPM CHECKS REPORT TO SS ). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

6

-

-

... More
(VI) TEST FOR OSCILLATOR AMPLIFIER CARD (PB 10).

1

-

-

... More
SR3 - CARRY OUT IN-SITU SERVICEABILITY CHECKS OF BREAKERS AND RAISE SPECIFIC DEFECT TO DOCKYARD FOR REPAIRS. CARRY OUT SERVICEABILITY CHECKS OF GSK RELAY AND OTHER PROTECTION CIRCUITS; RAISE SPECIFIC DEFECTS TO DOCKYARD, (WHERE APPLICABLE). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

7

-

-

... More
SR1-CARRY OUT THE NO LOAD TEST IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 5, PARA 5.1.1.

1

-

-

... More
NR3-CARRY OUT COMPLETE PERFORMANCE/ FUNCTIONAL CHECKS OF THE GYRO COMPASS ALONG WITH TRANSMISSION CHAIN AND REPEATERS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

2

-

-

... More
(IV) TEST FOR VFC CARD (PB 5).

1

-

-

... More
MR4 - CARRY OUT CALIBRATION OF RELAYS AND PCBS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

10

-

-

... More
SERVICE CHARGE

-

-

-

... More
REMOVAL AND REPALCEMENT OF OLD PERISHED CABLE DUE TO WEAR AND TEAR (4-CORE CABLE SHEILDED) FROM MAIN MAST TO ANNEMOMETER INTERFACE UNIT (AIU)

40

-

-

... More
SR5 - CARRY OUT FOLLOWING ROUTINES (30006.04 - 30006.07)ON SWITCHBOARD AND BUSBARS AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED:-

1

-

-

... More
(IX) TEST FOR FD CARD (PB 16).

1

-

-

... More
TX/RX NOT RECEIVING ANY SIGNAL, SUSPECT FBB MALFUNCTIONING. DEFECT OBSERVED TO BE LIQUIDATED

2

-

-

... More
ECHO SOUNDER REPEATER NOT GETTING FEED, SUSPECT CABLE OR REPEATER DEFECTIVE, REPLACE THE CABLE AND REPEATER IF NECESSERY

1

-

-

... More
INTERFACING WITH PAE 3060, SDR NC, MSS AND IMSAS TO BE PROVEN.

1

-

-

... More
(II)REPAIR AND REPLACE CON 1 AND CON 2 MIC IN COMPILOT 20

2

-

-

... More
(C) CLEAN AND DECARBONIZE THE BUSBARS.

100

-

-

... More
CARRY OUT SR AND NR ROUTINES ON MAGNETIC COMPASS AS PER MT 67154 AS FOLLOWS: - CARRY OUT OVERHAULING OF MAGNETIC COMPASS AND RENEW SUPPORTING LIQUID. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
REPAIR AND CALIBRATION OF VARIOUS EQUIPMENT INBUILT METER AT VARIOUS LOCATIONS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

60

-

-

... More
ECHO SOUNDER MALFUCTIONING DEFECT TO BE RECTIFIED. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

1

-

-

... More
CARRY OUT SR AND NR ROUTINES ON COMPILOT 20 AS FOLLOWS: - SR1-REPLACE OF ALL INDICATING INSTRUMENTS & SAFETY DEVICES. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.

3

-

-

... More
TRAILS POST COMPLETION OF ROUTINES TO BE CARRIED OUT AS PER NAVAL STANDARDS.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.