Forest Department Tender
... More
The FD has issued a formal invitation for competitive bids for the Forest Department project, for Raising And First Year Maintenance Of 2025 Teak Plantation, Nedumpoil 10.5 Ha(final Felled Area Of 1961 Tp,bit I) At Nedumpoil Section Of Kannavam Range During 2025-26 in Kannur, Kerala, with an estimated contract value of Rs. 23,57,781. The bid opening date for this tender is 29-04-2025 and the last date for bid submission is 12-05-2025. Interested bidders for Forest Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 50,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_FD_762034_1Bid Award Id
ViewTender No
KN/13457/2025Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://www.forest.kerala.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fixing boundary PWD stones size60*20*20
30
88
-
... More
Slash felling ordinary area (including VDA @ 162 & 10 % CP)
10.5
24606
-
... More
Heaping and burning (including VDA@ 162 & 10 % CP)
10.5
29527
-
... More
Construction of Temporary shed (including VDA @ 162 & 10 % CP)
10
1071
-
... More
Collection of 60 cm stakes for allgning and staking(including VDA @ 162 & 10 % CP)
26250
2
-
... More
Transport of stakes beyond 400M(including VDA @ 162 & 10 % CP)
13125
-
-
... More
Aligning and staking by 2M*2M (including VDA @ 162 & 10 % CP)
10.5
7375
-
... More
Digging pits of size 30*30*30cm in ordinary soil after rain(including VDA @ 162 & 10 % CP)
26250
9
-
... More
Loading and unlosding charges of Teak and misc seedlings including multi tyre lorry stands for tradyers
1
14000
-
... More
Hire charges of Lorry(5 ton and above for transporting Central Nursery to planting site)
1
6000
-
... More
Transport of Root trainer seedlings to planting sites and distribution up to a lead of 200m ist 50Mtr .89 add 20% for 150m total 142.4 .(including VDA @ 162 & 10 % CP)
26250
1
-
... More
Covering pits,digging planting holes and planting seedings. (including VDA @ 162 & 10 % CP)
26250
6
-
... More
Making Platform of size 60cm*60cm With 30cm depth inwards laterite soil slops. (including VDA @ 162 & 10 % CP)
26250
12
-
... More
First year first mammatty weeding during June July. (including VDA @ 162 & 10 % CP)
10.5
29500
-
... More
Replacing casualities (including VDA @ 162 & 10 % CP)
10.5
1229
-
... More
First year second weeding during August Septhember (including VDA @ 162& 10 % CP)
10.5
14764
-
... More
Cost of Fertilizers
1
15000
-
... More
Application of Manure for plants one time. (including VDA @ 162 & 10 % CP)
26250
4
-
... More
First year Third weeding in November(including VDA @ 162 & 10 % CP)
10.5
9842
-
... More
Clearing boundary line to width of 5.2 M to facilitate fire tracing. (including VDA @ 162 & 10 % CP)
2
19916
-
... More
Fire tracing to a width of 5.2 m and scrapping 1.8 m on either sides.(including VDA @ 162 & 10 % CP)
2
19916
-
... More
Cost of fungicides
1
4000
-
... More
Cost of plantation board soil testing and other monitoring charges
1
10000
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements