Directorate General Of Lighthouses And Lightships Tender
... More
The DGLL has issued a formal invitation for competitive bids for the Directorate General Of Lighthouses And Lightships project, for Construction Of Rcc Compound Wall At Ponnani Lighthouse, Malappuram District. in Malappuram, Kerala, with an estimated contract value of Rs. 74,93,410. The bid opening date for this tender is 30-07-2019 and the last date for bid submission is 24-09-2019. Interested bidders for Directorate General Of Lighthouses And Lightships tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 1,49,868Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_DGLL_489902_1Bid Award Id
ViewTender No
IV-4/(131)/14-VOL IIITender Authority
Directorate General Of Lighthouses And Lightships ViewPurchaser Address
-Website
http://http://www.dgll.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of RCC compound wall at Ponnani Lighthouse, Malappuram District.
Construction of RCC compound wall at Ponnani Lighthouse, Malappuram District.
Construction of RCC compound wall at Ponnani Lighthouse, Malappuram District. Drawings
Construction of RCC compound wall at Ponnani Lighthouse, Malappuram District.
BOQ Items
... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge including cost of all materials, labour, scaffolding, tools & plants etc complete - Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
15
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) including preparation of surface, supply of all materials, labour, tools & plants etc complete as directed.
1071.5
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :including cost of all materials, labour, tools & plants etc complete.CC 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size).
23.6
-
-
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
9
-
-
... More
Providing and fixing Broken glass pieces over coping of compound wall in cement mortar for security purpose including cost of all materials, labour, tools & plants etc complete as directed by Engineer -in- charge.
210
-
-
... More
Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular, as per design and shape for floors and roofs in M 25 grade design mix of cement concrete, including flush or deep ruled pointing at joints with Cement mortar 1:2 (1 Cement : 2 Fine sand)making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but, excluding the cost of reinforcement including cost of all materials, labour, tools & plants etc complete.
27.5
-
-
... More
Painting two coats with Synthetic enamel paint (Asian / Berger) to the Gate.Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade as directed including preparation of surface, cost of all materials, labour, tools & plants etc., complete.Two or more coats on new work
6.5
-
-
... More
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :including cost of all materials, labour, scaffolding, tools & plants etc complete. -In cement mortar.
149.8
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : including cost of all materials, labour, scaffolding, tools & plants etc complete with Cement mortar 1:4 (1 cement : 4 coarse sand).
13.5
-
-
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge including cost of all materials, labour, tools & plants etc complete.- All works above plinth level upto floor V level.
93.5
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc including cost of all materials, labour, scaffolding, tools & plants etc complete.
429.6
-
-
... More
Dismantling and removing the existing gate from the gate pillers as directed with gas cutting machine etc with out damaging the gate pillers etc, stacking of materials as directed, refixing the gate in position, in line and level with suitable clamps, anchors, concreting etc complete as directed at site including supply of all materials, labour, tools & plants etc complete as directed - Main gate (3.60 x 1.80m)
1
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m including cost of all materials, labour, tools & plants etc complete- All kinds of soil.
63
-
-
... More
Structural steel work for MS liner of 6mm thick and 12mm thick stiffner plate @ 3.00m intervel of pile 600mm dia in single section, fixed with or without connecting plate, including cutting, welding, hoisting, fixing in position and applying a priming coat of approved steel primer all including cost of all materials, labour, tools & plants etc complete.
30819
-
-
... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge including cost of all materials, labour, tools & plants etc complete.
5.85
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements