Defence Research And Development Organisation Tender

... More
The DRDO has issued a formal invitation for competitive bids for the Defence Research And Development Organisation project, for Provision Of Survey Bollards For Load Testing At Berthing Bank For Project Space Under Npol Kochi in Ernakulam, Kerala, with an estimated contract value of Rs. 71,00,000. The bid opening date for this tender is 21-11-2024 and the last date for bid submission is 03-12-2024. Interested bidders for Defence Research And Development Organisation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Defence Research And Development Organisation - DRDO Tender

Works
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date21 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 71,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Centering and Shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.

35

504

17640

... More
TERMS & CONDITIONS i) The area including Site of work is Security Restricted and the tenderer is bond to obtain all necessary clearance from the State Govt, Forest Department and Reservoir Dam Site Authority well in advance. ii) No blasting or conventional drilling methods are allowed. The tenderer should cater for specialized equipment for the same. The duration contain in the tender documents is Sacro Sanct with technically sacrosanct And no further extension of time is feasible. Iii) This tender document contains all works commencing from design of Bollards including sub structures, preparation of detailed architectural, structural and services drawings. Including soil investigation, survey of area, site inspection, proof check by third party from reputed govt institutes like IIT's, NIT's, or any Govt Institutes.

-

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)

10

10120

101200

... More
Disposal of moorum/building rubbish/malba/similar/un serviceable, dismantled or wast material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10km for all lifts, complete as per directions of Engineer-In-Charge.

100

635

63500

... More
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ±2%), Zinc+ 10% Al alloy+PVC coated, Mesh wire diameter 2.7/3.7mm (ID/OD),mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer- in charge.

60

5366

321960

... More
Supplying fabricating and fixing in position Reinforcement Steel for RCC work at all levels and locations including the cost of steel, straightening, cutting,bending,binding and placing in position etc.,as per drawings and specifications including the cost of binding wire labour etc., complete for reinforced concrete. Thermos-Mechanically Treated bars of grade Fe-500D or more upto plinth level.

4000

139

556000

... More
Excavation work by manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and remaining of bottom, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.

50

335

16750

... More
Designing of Bollards including sub structures, detailed engineering including preparation of detailed architectural, structural and services drawings. Including site inspection, soil investigation, survey of the area, proof check of the design by third party from reputed govt institutes like IIT's, NIT's, or any Govt Institutes.

1

200000

200000

... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and manufactured sand (i.e. Robo sand) as fine aggregate, Ordinary Portland cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and work ability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level. Concrete of M30 grade with minimum cement content of 350 kg /cum

30

12400

372000

... More
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1000

151

151000

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)

10

8880

88800

... More
Excavation work by manual means in surface trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and remaining of bottom, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m.

300

167

50100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.