South Western Railway Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

South Western Railway - SWR Tender

Works
Civil And Construction
Building Construction
Ireps
Opening Date12 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 8,69,73,023.21 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable 8 span as per RDSO design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.

1

14427

14427

... More
Providing speed breakers as per type plan No CE/LC/SK-5 and CE/LC/SK-6 including 8 painting white and yellow bands, diagonals etc. Complete with contractors labour, men, materials, machinery, consumables, approved paint, T&P, crew, fuel etc., complete including all lead and lifts and directed by the Engineer-in-charge

4

2398

9592

... More
Extra for the flooring items for using modern equipments for floor finish such as vaccum dewatering tremix system in lieu of manual/conventional method of concrete finishing etc., complete as per specification and as directed by the Engineer - in -charge.

700

118

83160

... More
Supplying, providing, laying and fixing 5 mm thick concrete canvas (flexible concrete impregnated fabric that hardens when hydrated to form a thin, durable water proof and fire resistance concrete layer within 24 hours) in limited height subway and other required work of 8 Hubballi division, South western Railway. Note: Contractor shall submit all relevant test certificates of the materials. (2) The adopted rates are deemed to include to all taxes (Direct or indirect), royalty, octroi, etc., of central Govt./State Govr/Local body, etc., and all incidental charges. (3) Mass of unset concrete canvas should be 7kg/m2 (4) The rate includes all the cost of lead, lift, loading, unloading, all type of transportation, ascent, descent, crossing of railway track, road, nullah wherever required, all contractor's labour, material to complete in all respects.

110

4061

446710

... More
Sealing the joints of precast RCC box units after placing it into the correct position with cement mortar 1:2 mix with contractor's cement of approved quality including labour, tools & plants, loading, unloading, lead & lift, etc., complete as per the direction of Engineer - in - charge.

160

101

16160

... More
Earthwork in excavation in hard rock with diamond wire saw including cutting the rock 8 to correct alignment and dimensions and breaking into pieces under traffic conditions without affecting the train movement and adjecent tracks, etc., and removing the stone pieces under traffic line block conditions and dispose the stone pieces 50m away from the site including all lift, machineries, tools & plant, labour, etc., complete as per the directions of Engineer-in-charge

500

4500

2250000

... More
Fixing reference pegs: Striking out of centre line of railway alignment using total station or any other latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with 8 contractor's surveyor, equipment, all consumables, labour etc. NOTES: (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of track throughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case of shifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.

30

154

4629

... More
Plotting initial levels: Computer Plotting of the theoretical cross section profile based on the initial levels of ground, recorded in the level books for cuttings/embankments at intervals of 16 25m or less including computation of theoretical profile/quantities duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in- charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. (ii) One cross section in one A4 size sheet is required.

0.5

-

2350

... More
Plotting final levels: Computer plotting of the theoretical & actual final finished cross section profile, duly indicating different type of strata available/ excavated in the x-section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including computation of theoretical/actual quantities done as per classification of different types of 16 soil/blanketing material as certified by Engineer-incharge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in-charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. ii)One cross section in one A4 sheet is required. iii) For embankments, computation of different soils viz., cut spoils, contractor's own earth, blanketing material are to be shown separately as per measurement recorded.

0.5

-

2350

... More
Fixing reference pegs: Striking out of centre line of railway alignment using total station or any other latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with 16 contractor's surveyor, equipment, all consumables, labour etc. NOTES: (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of track throughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case of shifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.

30

154

4629

... More
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing the same without any damage, and excavating the new trench along the railway alignment 16 or along the alignment as specified by the railway Engineer-in-charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plants etc., as directed by the Engineer-in-charge. NOTE: 1. In case the cable is damaged cost of restoration and the cost of cable will be recovered from the contractor. The decision of the railways with regard the cost to be recovered will be final.

150

207

31050

... More
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable span as per RDSO design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.

-

-

16

... More
Extra for the flooring items for using modern equipments for floor finish such as vaccum dewatering tremix system in lieu of manual/conventional method of concrete finishing etc., complete as per specification and as directed by the Engineer - in -charge.

530

118

62964

... More
Providing speed breakers as per type plan No CE/LC/SK-5 and CE/LC/SK-6 including 16 painting white and yellow bands, diagonals etc. Complete with contractors labour, men, materials, machinery, consumables, approved paint, T&P, crew, fuel etc., complete including all lead and lifts and directed by the Engineer-in-charge.

4

2398

9592

... More
Supply, fabrication, painting and erection of road traffic warning boards for various purposes such as No parking, No Entry, HIV prohibited area, etc., made of 50x50x5mm MS angle and 16 3mm thick MS plate of total height 2m painting 2 coats of appropriate enamel paint and pasted with reflective stickers/reflective paint on the board erected into the ground with cement concrete 1:3:6 mix for 0.30x0.30x0.60m including earth work excavation, cement, etc., as directed by the Engineer- in-charge.

5

4000

20000

... More
Fabrication and erection of height gauge with contractor's materials such as angles, MS plates, fish plates, bolts, nuts, etc., complete as per the drawing No. Dy CE/HQ/CN/BNC/6 - 2004 resting on vertical posts made of rail cluster including cutting, drilling, fabrication of rail cluster, etc.,

12

65000

780000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.