South Western Railway Tender
... More
The SWR has issued a formal invitation for competitive bids for the South Western Railway project, for Hubballi Division- Hubballi-ballari Section: 1) Construction Of Subway At Km 117/000-100 In Lieu Of Lc No.66 At Km.117/600-700 Between Koppal And Ginigera Stations (balance Works). 2) Construction Of Subway In Lieu Of Lc No.62 At Km 116/100-200 Between Koppal And Ginigera Stations (balance Works) in Koppal, Karnataka, with an estimated contract value of Rs. 8,69,73,023. The bid opening date for this tender is 12-02-2025 and the last date for bid submission is 07-03-2025. Interested bidders for South Western Railway tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
South Western Railway - SWR Tender
Opening Date12 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 8,69,73,023.21
Costs
EMD
₹ 5,84,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KBL-LC-66-62-BAL-R-SWR-CONST-HQ-ENGG/SOUTH WESTERN RLYTender No
KBL-LC-66-62-BAL-RTender Authority
South Western Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Fabrication and erection of height gauge with contractor's materials such as angles, MS plates, fish plates, bolts, nuts, etc., complete as per the drawing No. Dy CE/HQ/CN/BNC/6 - 2004 resting on vertical posts made of rail cluster including cutting, drilling, fabrication of rail cluster, etc.,
12
65000
780000
... More
Extra for the flooring items for using modern equipments for floor finish such as vaccum dewatering tremix system in lieu of manual/conventional method of concrete finishing etc., complete as per specification and as directed by the Engineer - in -charge.
700
118
83160
... More
Plotting final levels: Computer plotting of the theoretical & actual final finished cross section profile, duly indicating different type of strata available/ excavated in the x-section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including computation of theoretical/actual quantities done as per classification of different types of 8 soil/blanketing material as certified by Engineer-incharge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in-charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. ii)One cross section in one A4 sheet is required. iii) For embankments, computation of different soils viz., cut spoils, contractor's own earth, blanketing material are to be shown separately as per measurement recorded.
0.5
-
2350
... More
Plotting initial levels: Computer Plotting of the theoretical cross section profile based on the initial levels of ground, recorded in the level books for cuttings/embankments at intervals of 8 25m or less including computation of theoretical profile/quantities duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in- charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. (ii) One cross section in one A4 size sheet is required.
0.5
-
2350
... More
Extra for the flooring items for using modern equipments for floor finish such as vaccum dewatering tremix system in lieu of manual/conventional method of concrete finishing etc., complete as per specification and as directed by the Engineer - in -charge.
530
118
62964
... More
Supply, fabrication, painting and erection of road traffic warning boards for various purposes such as No parking, No Entry, HIV prohibited area, etc., made of 50x50x5mm MS angle and 16 3mm thick MS plate of total height 2m painting 2 coats of appropriate enamel paint and pasted with reflective stickers/reflective paint on the board erected into the ground with cement concrete 1:3:6 mix for 0.30x0.30x0.60m including earth work excavation, cement, etc., as directed by the Engineer- in-charge.
5
4000
20000
... More
Providing speed breakers as per type plan No CE/LC/SK-5 and CE/LC/SK-6 including 8 painting white and yellow bands, diagonals etc. Complete with contractors labour, men, materials, machinery, consumables, approved paint, T&P, crew, fuel etc., complete including all lead and lifts and directed by the Engineer-in-charge
4
2398
9592
... More
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable span as per RDSO design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.
-
-
16
... More
Earthwork in excavation in hard rock with diamond wire saw including cutting the rock 8 to correct alignment and dimensions and breaking into pieces under traffic conditions without affecting the train movement and adjecent tracks, etc., and removing the stone pieces under traffic line block conditions and dispose the stone pieces 50m away from the site including all lift, machineries, tools & plant, labour, etc., complete as per the directions of Engineer-in-charge
500
4500
2250000
... More
Fixing reference pegs: Striking out of centre line of railway alignment using total station or any other latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with 16 contractor's surveyor, equipment, all consumables, labour etc. NOTES: (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of track throughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case of shifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.
30
154
4629
... More
Plotting initial levels: Computer Plotting of the theoretical cross section profile based on the initial levels of ground, recorded in the level books for cuttings/embankments at intervals of 16 25m or less including computation of theoretical profile/quantities duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc., and as directed by Engineer-in- charge. NOTES: i) Plottings and calculations are to be submitted to Railway in 3 sets. (ii) One cross section in one A4 size sheet is required.
0.5
-
2350
... More
Sealing the joints of precast RCC box units after placing it into the correct position with cement mortar 1:2 mix with contractor's cement of approved quality including labour, tools & plants, loading, unloading, lead & lift, etc., complete as per the direction of Engineer - in - charge.
160
101
16160
... More
Fixing reference pegs: Striking out of centre line of railway alignment using total station or any other latest survey equipment and fixing centre line pegs of adequate size with Railway's tie bars/cut rails at every 100m on straight and 25m in curves, at bridges etc., with 8 contractor's surveyor, equipment, all consumables, labour etc. NOTES: (i) The reference pegs shall be fixed along the alignment at appropriate locations to provide information for execution of formation, bridges, ballasting and linking of track throughout the period of construction. (ii) Contractor is responsible for maintaining the reference pegs including shifting in case of shifting of alignment or to facilitate construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required.
30
154
4629
... More
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing the same without any damage, and excavating the new trench along the railway alignment 16 or along the alignment as specified by the railway Engineer-in-charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plants etc., as directed by the Engineer-in-charge. NOTE: 1. In case the cable is damaged cost of restoration and the cost of cable will be recovered from the contractor. The decision of the railways with regard the cost to be recovered will be final.
150
207
31050
... More
Supplying, providing, laying and fixing 5 mm thick concrete canvas (flexible concrete impregnated fabric that hardens when hydrated to form a thin, durable water proof and fire resistance concrete layer within 24 hours) in limited height subway and other required work of 8 Hubballi division, South western Railway. Note: Contractor shall submit all relevant test certificates of the materials. (2) The adopted rates are deemed to include to all taxes (Direct or indirect), royalty, octroi, etc., of central Govt./State Govr/Local body, etc., and all incidental charges. (3) Mass of unset concrete canvas should be 7kg/m2 (4) The rate includes all the cost of lead, lift, loading, unloading, all type of transportation, ascent, descent, crossing of railway track, road, nullah wherever required, all contractor's labour, material to complete in all respects.
110
4061
446710
... More
COMPLETION DRAWING: Preparation and submission of GAD/Completion drawing for the Major bridges/ROBS/RUBs based on soil exploration and water way calculation for fixing suitable 8 span as per RDSO design and drawing in AutoCAD on 100micon film double mat finish as per Railway standard approved by the Engineer-in-charge to specified scales including submission of check print for proof check to incorporate suggested corrections and modifications and supply final copy in compact disk and 6 copies in ammonia print in A0 size with all contractor's materials, labours, tools, plants etc., complete.
1
14427
14427
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements