Sericulture Department Tender

... More
The Sericulture Department has issued a formal invitation for competitive bids for Construction Of A New Toilet And Building Repair And Electrification Works At The Government Cocoon Market, Chikkaballapur. in Bengaluru, Karnataka, with an estimated contract value of Rs. 23,20,000. The bid opening date for this tender is 06-11-2026 and the last date for bid submission is 18-11-2026. Interested bidders for Sericulture Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Sericulture Department Tender - Karnataka Tender

Opening Date6 Nov 2026
Closing Soon18 Nov 2026
Tender Amount₹ 23,20,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Construction Of A New Toilet And Building Repair And Electrification Works At The Government Cocoon Market, Chikkaballapur.

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
14.1.1 - Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

1

5030

5030.52

... More
11.5.1 - Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

3.78

4612

17434.6452

... More
5.4 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

6.26

6554

41033.7992

... More
20.50 - Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

1949.16

13

26099.2524

... More
11.16.3 - Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

175

125

21990.5

... More
Item No.13 - Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 (Part-III item No.3.6.10 Page No-9 SR 2023-24) 6/16A Universal Socket ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2

243

486.16

... More
8.17.1 - Providing Flush / Ruled/ Struck or weathered pointing Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

8.91

176

1569.3183

... More
20.59 - Removing the old paint from steel and / or other metal surface with hand scraping and making surface even including cost of labour, complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

254.81

124

31756.9703

... More
13.33.2 - Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work - 20 mm nominal dia Pipes ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

45

223

10057.95

... More
12.92 - Providing& fixing of Openable door made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 102mm and GI reinforcement of 2mm thickness. Coextruded Glazing bead for fixing of Glass shall be of size 20mm x 34 mm. Windows shall be provided with 6mm plain float Glass, Standard hardware with 2D/3D hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size – 900mm x 2400mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

4.72

6432

30360.692

... More
10.10.1 - Supply and delivery at site special moulded variety PVC tee as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments - 25 mm dia PVC Tee ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

4

21

86.52

... More
13.34 - Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

1000

9

9270

... More
Item No.8 - Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. (Part-III item No.3.3.6 Page No-8 SR 2023-24) 10-12 Way ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

10

268

2688.3

... More
Item No.12 - Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 (Part-III item No.3.6.9 Page No-9 SR 2022-23) 32A DP Switch ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

5

335

1678.9

... More
16.15.6 - Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Providing and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Providing and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, de-watering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm dia: Constructing Brick Masonry Circular Machinehole 1.2 m internal dia.,1.5M depth & SFRC cover & frame ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2

39532

79064.86

... More
Item No.15 - Fixing a ceiling/ Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5A. ceiling rose, necessary length of 23/0.0076 inch PVC insulated twin twisted copper wire and wiring.(P-57, Itm:13.10, CSR-2023-24 Electrical) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

12

176

2113.56

... More
20.57 - Removing the old paint or polish from wood and / or wood based surface with caustic soda solution and making surface even including cost of materials, labour, complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

51.84

74

3844.4544

... More
1.4.1 - Manual Means - Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

108.73

249

27102.0398

... More
6.32 - Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

75.78

1347

102093.8472

... More
Item No.02 - Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely ( Part-III item No.1.9.5 Page No-3 SR 2023-24) 50 mm ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

50

48

2420.5

... More
9.9 - Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

15.72

1104

17357.3952

... More
4.1 - Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

17.48

121

2124.5192

... More
Item No.10 - Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Part-III item No.3.6.1 Page No-9 SR 2023-24) 6A One Way Switch ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

30

105

3151.8

... More
Item No.5 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (item No.2.3.1,2.3.2, 2.3.3,2.3.4 Page No-3 SR 2023-24) 1.5 mm2 ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

500

26

13390

... More
13.3.2 - Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

6

314

1884.9

... More
Item No.06 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (item No.2.3.1,2.3.2, 2.3.3,2.3.4 Page No-3 SR 2023-24) 2.5 mm2 ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

800

43

34608

... More
Item No.14 - Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model(P-30, Itm:6.3.1, CSR-2023-24 Electrical) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

12

3073

36882.24

... More
11.25.2 - Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

1500

140

210120

... More
7.39.1 - Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete : Ridges plain (500 - 600mm) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

3.5

464

1625.855

... More
13.53 - Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc. complete as per standard design: Inside dimensions 455x610 mm and 45 cm deep for single pipe line : With common burnt clay (non modular) bricks of class designation 3.5 ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

3

5811

17433.78

... More
14.7.1 - Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2

3174

6348.92

... More
Item No.16 - Supply of LED floodlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/clear glass material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100 V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with . W System Power consumption. LED Efficiency Greate rthan 1301m/w, nominal CRI greater thank 75. Luminaire manufacturer should have in- house facility accredited by NABL /CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark / name shall be Engraved / Embossing on the die cast housing / Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED Manufacturer & Cree/Nichia /Lumileds/Osram make LED Source. (Part-III item No.11.9.3 Page No-46 SR 2023-24)LED Floodlight 120W ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

6

11079

66478.26

... More
7.67.1 - Providing,fabricating and fixing Profiled Poly Urethane insulated Roof(PUF Sheet) having modular density 40kg/m2 and size 1.06m width and 7.60m length sheets roof having external sheet of 0.5mm steel, bottom sheet of 0.40mm steel with powder coated finish. The precoated sheet shall be of minimum 240MPa steel conforming to IS 14246 : 1995 and shal have zinc coating with minimum 120gsm as per IS 277:1992,.The roofing system shall have suitable water proof over lapping arrangments and GRIHA ceritifed.The fasting shall be of self tapping screws of required length with PVC head along with washer pre-painted aluminium cap unit with build in seal arrangments. The entire roof shall be firmly fastened to the existng frame including all lead and lifts, loading & unloading ,usage charges of machinery and equipments, transportation charges,labour charges and all other incidental charges etc.,complete as per standard technical detailed specifications and as directed by the Engineer in charge of the work. 30 mm thickness ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

22.04

2263

49897.2376

... More
Item No.9 - Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Part-III item No.3.5.6 Page No-8 SR 2022-23)18 Module ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

50

354

17716

... More
Item No.11 - Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 (Part-III item No.3.6.3 Page No-9 SR 2023-24) 6A Three Way socket ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

25

176

4403.25

... More
Item No.7 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (item No.2.3.1,2.3.2, 2.3.3,2.3.4 Page No-3 SR 2023-24) 4 mm2 ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

450

64

29200.5

... More
2.2.1 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. - M 20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

1.05

6369

6687.996

... More
2.1.2 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. - Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

5.24

5775

30262.1004

... More
10.2.4 - Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for: Pipes of SN4, 160mm dia. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

65

593

38563.2

... More
Item No.1 - Supplying heavy gauge PVC conduit pipe.dia.mm thick confirming to IS2509 with suitable size bends, junction boxes, adhesive paste etc, and fixing using inverted wood plugs in case of RCC ceiling and RCC wall /stone structure or raw l plugs in case of brick wall sand cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. mm dia 2.5 mm thick (Page No.2 item No.1.1.4 PWD Ele SR 2023-24) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

200

153

30694

... More
Item No.4 - Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. (item No.2.3.1,2.3.2, 2.3.3,2.3.4 Page No-3 SR 2023-24) 1 mm2 ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

250

19

4892.5

... More
13.33.3 - Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work - 25 mm nominal dia Pipes ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

45

304

13719.6

... More
1.10 - Manual Means - Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

65.38

164

10774.624

... More
Item No.03 - Supplying And Fixing M.S. Rafter Clamp Set made out of M.S. Flat & 14 mm M.S. rod. (Part-III item No.1.12 Page No-4 SR 2023-24) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

20

164

3296

... More
8.33.2 - Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

51.84

142

7368.5376

... More
8.5.2 - Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

189.7

357

67800.677

... More
14.40.1 - Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 450 mm long towel rail with total length of 495 mm, 78 mm wide and effective height of 88 mm, weighing not less than 170 g. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2

492

984.68

... More
10.9.1 - Supply and delivery at site special moulded variety PVC elbows as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments - 25 mm dia PVC Elbows ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

10

16

164.8

... More
8.8 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

239.4

380

90988.758

... More
14.4.1 - Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

3

4587

13762.86

... More
8.33.1 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2138.86

162

348078.0764

... More
9.38 - Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

77.7

1430

111163.059

... More
10.15.9 - Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning (Contractor will make his own arrangements for procuring water for testing) etc. complete for: 160mm ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

65

129

8435.7

... More
14.32.1 - Providing and fixing mirror of superior Glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Circular shape 450 mm dia ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2

1120

2241.28

... More
20.38 - Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 m² and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. (For Roof and Water Tanks) ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

145.8

533

77790.132

... More
11.37.1 - Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float Glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

2.16

1017

2198.1024

... More
14.55a - Providing and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete- class - Economy ---- All the work as maintained in the Bill of Quantity (BOQ) includes lead and lift charges, loading and unloading charges, labour charges, all incidental charges, hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per the standard technical specification and directions of the Engineer in charge of the work

4

1150

4602.04



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.