Rail Wheel Factory Tender
... More
The RWF has issued a formal invitation for competitive bids for the Rail Wheel Factory project, for Replacement Of Transformer And Associated Lt Switchgear Units In Pump House Substation
of Rail Wheel Factory, Yelehanka, Bengaluru-64. in Bengaluru, Karnataka, with an estimated contract value of Rs. 2,16,49,508. The bid opening date for this tender is 20-12-2023 and the last date for bid submission is 25-01-2024. Interested bidders for Rail Wheel Factory tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,58,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Replacement Of Transformer And Associated Lt Switchgear Units In Pump House Substation of Rail Wheel Factory, Yelehanka, Bengaluru-64.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
RWFPCEEELTD2023-2407-RWF HQ-ELECTRICAL/RWFTender No
RWFPCEEELTD2023-2407Tender Authority
Rail Wheel Factory ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection, testing and commissioning of 150KVAR, 415V AC, 50Hz capacitor panel (supplied as per 12 Sl. No. 11 of tender schedule above). Refer Sl. No. 8 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
10472
20945
... More
Supply of end termination kit suitable for 3.5 core 95/70/50sq.mm aluminium armoured LT cable: 26 Supply of end termination kit consisting of 04 Nos. Aluminium lugs & 01 metal gland suitable for 3.5 core 95/70/50 sq.mm LT UG Aluminium armoured cable. Refer Sl. No. 16 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
60
731
43896
... More
Erection/ making end termination using 3.5 core 300/240sq.mm aluminium armoured LT cable and 25 making end termination: Making of end termination of 3.5 core 300/240sq.mm aluminium armoured LT cable using end termination kit (supplied as per Sl.No. 24 of tender schedule above) & connecting the cable to LT switchgear panel. Refer Sl. No. 15 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
8
1309
10478.4
... More
Erection/ making end termination using 3.5 core 95/70/50sq.mm aluminium armoured LT cable and making end termination: Making of end termination of 3.5 95/70/50 sq.mm aluminium armoured LT cable 27 using end termination kit (supplied as per Sl.No. 26 of tender schedule above) & connecting the cable to LT switchgear panel. Refer Sl. No. 16 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
60
578
34692
... More
Supply of 150KVAR, 415V AC, 50Hz, capacitor panel completely wired with 400A incomer MCCB, 3 pole, 415V with microprocessor based trip release, APFC Relay, 6 Nos. 25 KVAR, 3 phases, 415 Volts, 11 capacitors, 6 Nos. 63A capacitor duty contactors & 06 Nos. 125A SDFUs and associated accessories. Refer Sl. No. 8 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
361847
723694
... More
Erection/making end termination using Heat Shrinkable end termination kit for 11kV 3 core 400sq.mm UG cable: Making of end termination of 11kV 3 core 400sq.mm UG cable using Heat Shrinkable End 23 Termination kit (supplied as per Sl. No.22 of tender schedule above) & connecting the cable to HT terminals of 1600KVA Transformer & testing. Refer Sl. No. 14 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
2629
5258.08
... More
Laying and connecting of 50mm x 6mm GI flat earth bus (supplied as per Sl. No. 16 of tender 17 schedule above): Refer Sl. No. 11 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
100
80
8024
... More
Construction of GI Pipe Earth Stations as per IS: 3043 latest. Refer Sl. No. 10 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
6
10207
61242
... More
Supply of 50mm x 6mm GI flat earth bus: Refer Sl. No. 11 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
100
358
35872
... More
Supply of LT Switchgear Panel: Design, manufacturing & supply of new LT switchgear panel consisting of items under Sl. No. 7, 7(a) to 7(f) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document as integral part of the 9 LT switchgear panel. Note: The total cost of items under Sl. No. 7, 7(a) to 7(f) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document shall be quoted in Sl. No.9. of tender schedule. Refer Sl. No. 7, 7(a) to 7(f) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, quantity, explanatory note & specification.
1
8665330
8665330
... More
Dismantling and shifting of existing transformer: Disconnection of HT & LT cables, earthing 1 connections and control cables from existing 750kVA, 11kV/433V transformer, removing the existing fencing & Shelter roof, lifting and shifting of the transformer to earmarked location within 500Mtrs. Refer Sl. No.1 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note.
2
110448
220896
... More
Demolition of existing transformer foundation/bed: Demolition of existing transformer bed (cement construction) of approx. size: 1.5 mtr. length x 1 mtr. width x 0.9 mtr. height from ground level and shifting the 2 debris to earmarked location within 100 mtrs. (for clearing the area for the construction of new bed for the installation of new 1600kVA transformer). Refer Sl. No. 2 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note.
2
78529
157058
... More
Erection of M.S Chequered plate: Erection of M.S. chequered plate of 8mm thickness for cable 21 trench covering. The chequered plate shall be given reinforcement with 50mm x 50mm x 6mm MS angle (supplied as per Sl. No. 20 of tender schedule above). Refer Sl. No. 13 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
25
204
5103.5
... More
Supply of new LT bus duct: Design, fabrication & supply of outdoor type LT bus duct, 500V, 3 7 phase & neutral with Aluminium electrolytic bus bars. Refer Sl. No. 6 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
16
61493
983893.44
... More
Erection, testing & commissioning of new 1600kVA, 11kV/433V outdoor type distribution Transformer: Erection, testing & commissioning of new outdoor type of 1600KVA, 11kV/433Volts, 3 phase, 50 Hz, 6 Level-3 energy efficient/BEE Star rated 3 or above as per IS: 1180 with latest amendment No. 4 MARCH 2021 & IS: 2026 latest (supplied as per tender schedule Sl. No. 5 above) Refer Sl. No.5 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
34957
69915
... More
Supply of 1600kVA, 11kV/433V new outdoor type distribution Transformer: Design, manufacture & supply of new outdoor type of 1600KVA, 11kV/433Volts, 3 phase, 50 Hz, Level-3 energy efficient / BEE Star rated 5 3 or above as per IS: 1180 with latest amendment No. 4 MARCH 2021 & IS: 2026 latest. Refer Sl. No. 5 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
4698465
9396930
... More
Dismantling and shifting of existing LT Switchgear Panels: Disconnection of LT power cables to various loads, bus bars, control cables from existing LT switchgear panel, dismantling & shifting of LT switchgear 3 panel of approx. size: 12.6 mtr. length x 2.3 mtr. height x 0.4 mtr. depth (consisting of 3 Nos. ACBs, star delta starters, auto transformer starters, DOL starters, etc.) Including 02 Nos. 150kVAR LT capacitor panels to earmarked location within 500 mtrs. Refer Sl. No. 3 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note.
1
144874
144874.5
... More
Installation of fire retardant synthetic insulating mat, 1mtr. Width ± 10mm, 2mm thick ± 10% 14 suitable for voltage up to 3.3 KV as per IS: 15652 latest (supplied as per Sl. No. 13 of tender schedule above). Refer Sl. No. 9 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
50
354
17700
... More
LT Synthetic insulating mat: Supply of fire retardant synthetic insulating mat, 1mtr. Width ± 10mm, 13 2mm thick ± 10% suitable for voltage up to 3.3 KV as per IS: 15652 latest. Refer Sl. No. 9 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
50
2168
108442
... More
Supply of end termination kit suitable for 3.5 core 300/240sq.mm aluminium armoured LT cable: 24 Supply of end termination kit consisting of 04 Nos. Aluminium lugs & 01 metal gland suitable for 3.5 core 300/240sq.mm LT UG aluminium armoured cable. Refer Sl. No. 15 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
8
2906
23250.72
... More
Laying and connecting of 25mm x 3mm GI flat earth bus (supplied as per Sl. No. 18 of tender 19 schedule above): Refer Sl. No. 12 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
100
56
5664
... More
Supply of Heat Shrinkable end termination kit for 11kV 3 core 400sq.mm UG cable: Supply of Heat 22 Shrinkable End Termination kit, indoor type suitable for 3 core 400sq.mm 11KV aluminium conductor, XLPE insulated armoured earthed cable. Refer Sl. No. 14 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
2
7593
15186.6
... More
Installation, testing & commissioning of outdoor type LT bus duct, 500V, 3 phase & neutral with 8 Aluminium electrolytic bus bars (supplied as per Sl. No. 7 of tender schedule above) Refer Sl. No. 6 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
16
6442
103084.8
... More
Supply of 25mm x 3mm GI flat earth bus: Refer Sl. No. 12 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/PUMP HOUSE SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification.
100
158
15812