Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of Samudaaya Bhavana At Baiyalmarchad , Kambalanetti And Kurdi Village,in Manvi Taluka Of Raichur District( Rch2418213887)).under Kkrdb Micro For The Year 2024-25 Work Reserved For Category Ii(a). in Raichur, Karnataka, with an estimated contract value of Rs. 58,40,528. The bid opening date for this tender is 10-06-2025 and the last date for bid submission is 20-06-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Opening Date10 Jun 2025
Closing Soon20 Jun 2025
Tender Amount₹ 58,40,528.91 
Notes
Download

Costs

Summary

Construction Of Samudaaya Bhavana At Baiyalmarchad , Kambalanetti And Kurdi Village,in Manvi Taluka Of Raichur District( Rch2418213887)).under Kkrdb Micro For The Year 2024-25 Work Reserved For Category Ii(a).

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    PWD/2025-26/BD/WORK_INDENT21258
  • Tender No

    PWD/2025-26/BD/WORK_INDENT21258
  • Tender Authority

    Public Works Department View
  • Purchaser Address

    -
Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PWD CSR VOL I for the year 2023-24. I. No. 2.2.3 P - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

2.83

6652

18827.424

... More
PWD SR VOL II 2023-24. sno 8.33.3 pno 47 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

31.5

145

4597.425

... More
PWD SR VOL II 2023-24. slno 11.26.1 pno 84 - Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge.

129.96

144

18831.204

... More
PWD CSR VOL I for the year 2023-24. I. No. 2.2.3 P - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

9.34

6652

62137.152

... More
PWD CSR VOL I 2023-24. I. No. 2.11.a PNO 18 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a.Buildings

3.26

93929

306211.311

... More
PWD CSR VOL I for 2023-24. Sl. No. 9 P.No 111 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%

4.56

5029

22935.0216

... More
PWD CSR VOL I for2023-24. I. No. 2.5.2 PNo.16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

5.77

7185

41458.3155

... More
PWD CSR VOL I for the 2023-24. Sl. No. 2 PNo.111 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings 50%

2.83

3326

9413.712

... More
PWD CSR VOL I for the year 2023-24. I. No. 1.14.1 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work

56.05

107

6002.955

... More
PWD CSR VOL I for 2023-24. Sl. No. 15 P.No112 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Roof Slabs 50%

12.98

4311

55957.9482

... More
PWD CSRs VOL II for r 2023-24.Sno.8.1.2 Pno 41 - Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

175.5

253

44410.275

... More
PWD CSR VOL I for the year 2023-24. I. No. 1.12 P. - Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.

90

99

8977.5

... More
PWD CSR VOL I for 2023-24. I. No. 2.5.2 PNo.16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

1.08

7185

7759.962

... More
PWD SR VOL II for 2023-24. Sno.8.2.2 Pno 41 - Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

174

292

50973.3

... More
PWD CSR VOL I for 2023-24. I. No. 2.5.2 PNo.16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

1.64

7185

11783.646

... More
PWD SR VOL II for the year 2023-24. 5.1.1 PNo.9 - Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)

10.09

5891

59445.7395

... More
PWD SRVOL II for the year 2023-24. 5.2 pNo.9 - Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)

8.44

6948

58648.716

... More
PWD SR OL II 2023-24. sno 8.33.1 pno 46 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

175.5

165

29115.45

... More
PWD CSR VOL I for the year 2023-24. I. No. 1.11 P - Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

82.64

454

37572.276

... More
PWD CSR VOL I for 2023-24. Sl. No. 14 P.No112 - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%

1.64

4311

7070.1876

... More
PWD CSR VOL I for the year 2023-24. Sl. No. 1(a) P - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for isolated footings 8%

9.34

532

4970.9348

... More
PWD CSR VOL I for the year 2023-24. I. No. 1.4.1 P - Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m

16.17

254

4108.797

... More
PWD SR VOL II r 2023-24. sl no 9.22.2 P.No. 62 - Providing and laying Polished Glazed Vitrified tiles with thickness 10 mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately)

91.05

1392

126768.915

... More
PWD SR VOL II 2023-24. SNO 8.30 PNO 46 - Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including riming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

174

182

31789.8

... More
PWD SR VOL II for2023-24. I. No. 11.5.2 P.No. 77 - Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge

10.08

4454

44897.328

... More
PWD CSR VOL I for 2023-24. I. No. 2.5.2 P.No.16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

4.56

7185

32764.284

... More
PWD CSR VOL I for the year 2023-24. I. No. 2.1.4 P - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates

1.41

6527

9204.2685

... More
PWD CSR VOL I 2023-24. Sl. No.14 P.No. 112 - Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60 PERCENT

5.77

4311

24874.9893

... More
PWD CSR VOL II for 2023-24.Sno.6.23 Pno15 - Providing Brick work with common burnt clay Non Modular bricks ofclass designation 3.5 in superstructure above plinth level in all shapes andsizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & otherincidental charges complete as per the direction of engineer incharge of work.

33.14

8158

270372.69

... More
PWD CSR VOL I for 2023-24. I. No. 2.5.2 PNo. 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

12.98

7185

93263.247

... More
PWD CSR VOL II for 2023-24. I. No.11.11.1 P.No. 79 - Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.

372.78

155

57930.012

... More
PWD CSR VOL I for the year 2023-24. Sl. No. 9 P.No - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) 70%

1.62

4656

7544.2752

... More
PWD CSR VOL I for the year 2023-24. I. No. 2.1.3 P - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates

15.49

6288

97408.0905

... More
PWD CSR VOL I for the year 2023-24. I. No. 2.2.3 P - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

1.62

6652

10777.536

... More
PWD CSR VOL I for the year 2023-24. Sl. No. 14 P.N - Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Beams, Lintels & Troughs of Aqueducts 60%

1.41

3916

5522.5611

... More
PWD SR VOL II 2023-24. SNO 8.33.1 PNO 46 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.

78.5

165

13023.15

... More
VOL I for the year 2023-24. I. No. 1.8 P.No. 7 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications,includingcostoflabour ,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.

4.8

497

2388.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.