Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Improvement And Asphalting Work To Kolar Venkatagiri Kote Road From Chainage 0.00 To 2.81 Km At Selected Reaches In Kgf Taluk Kolar District in Kolar, Karnataka, with an estimated contract value of Rs. 3,19,58,210. The bid opening date for this tender is 05-02-2025 and the last date for bid submission is 19-02-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 4,80,000Document Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT17892Bid Award Id
ViewTender No
PWD/2024-25/RD/WORK_INDENT17892Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
5.16.B.C - Bituminous Concrete Grading II for traffic <20 MSA - Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. Ref to MoRT&H : IRC - 507 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
502.73
10954
5506904.42
... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
67.44
393
26503.92
... More
8.25.i - Metal Beam Crash Barrier - Type - A, W : Metal Beam Crash Barrier - Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811. Ref to MoRT&H : IRC - 811 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
514
3640
1870960
... More
10.15.i - Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
179.2
263
47129.6
... More
5.4.ii - Tack coat on Granular surface treated with primer - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. Ref to MoRT&H : IRC - 503 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
16757.5
14
234605
... More
6.2.1 - Pavement Quality Concrete using paver - M40 Grade - Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
315
9061
2854215
... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
67.44
393
26503.92
... More
6.1 - Dry Lean Cement Concrete Sub-base - Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. Ref to MoRT&H : IRC - IRC SP 49:2014 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
140
4920
688800
... More
10.15.i - Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
268.8
263
70694.4
... More
8.43 - Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Ref to MoRT&H : IRC - MoRTH 806 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
400
365
146000
... More
1.8 - Manual Means -
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
546.07
474
258837.18
... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
337.2
97
32708.4
... More
4.1.A.v - Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 - For Grading -V Material. Ref to MoRT&H : IRC - 401 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
821.4
2487
2042821.8
... More
10.15.i - Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
89.6
263
23564.8
... More
3.5 - Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 305.4.3 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
15180
6
91080
... More
8.7 - Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
1.8
9010
16218
... More
8.15 - Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Ref to MoRT&H : IRC - 803 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
618.3
530
327699
... More
5.12.C - Dense Graded Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Ref to MoRT&H : IRC - 505 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
837.87
9449
7917033.63
... More
1.14.1 - Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
3704.62
102
377871.24
... More
8.48 - Chevron Boards - Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
10
3586
35860
... More
4.17 - Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory rollerto achieve the desireddensity. Ref to MoRT&H : IRC - 406 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
3123.75
2559
7993676.25
... More
3.7 - Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. Ref to MoRT&H : IRC - 305.3.4 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
3616.88
105
379772.4
... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
562
97
54514
... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
67.44
393
26503.92
... More
2.5.ii.a - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer - In area of light jungle ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
67.44
393
26503.92
... More
10.2 - Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Ref to MoRT&H : IRC - 3003 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipment, transportation charges, loading and unloading charges(Inclusive of GST) and all other incidental charges complete as per standard technical detailed specification and directions of the Engineer in charge of the work
786.8
97
76319.6