Public Works Department Tender
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.
Costs
EMD
₹ 19,100Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT14035Bid Award Id
ViewTender No
PWD/2024-25/RD/WORK_INDENT14035Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
6.02 - Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps - Ordinary Soil (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 46 Item No 6.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
4884
39074.56
5.11 - Turn Buckle-GI (Dwg No. BESCOM/GM/QS&S/07 Dtd 24.11.2018) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 5.11) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
22
269
5938.24
1.6.1 - Digging of Pit for providing GI Pipe type Earthing - Ordinary Soil (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 43 - Item No 1.6.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
850
6800.64
6.08 - No. 15 Strain Insulater (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No.05 - Item No 6.08) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
16
66
1057.28
51.01 - GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 22- Item No 51.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
832
6657.28
7.02 - Rabbit ACSR Conductor (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM) (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No.05 - Item No 7.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
51782
414256.64
5.13 - Anchor Rod using 12mm rounds/Guy Rod-GI (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 5.13) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
20
368
7369.6
51.03 - Good Quality Salt for grounding purposes packed in 50 Kg gunny bag. (Vol-06, ESCOM's SR. 2023-24 Part- II, Page No. 22- Item No 51.03) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
347
2777.6
5.10 - Guy Clamp-GI (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 05 - Item No 5.10) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
20
128
2576
5.04 - Releasing and Refixing of V-Shape/ Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 45 Item No 5.04) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
34
340
11576.32
3.01 - Releasing and Refixing of Double Pole TC Sets for 25/ 63 KVA Transformers GI using 9 Mtr RCC (145kg WL) Pole including fixing of Structure Materials, Erections of Pole etc. complete (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 3.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
2
12182
24365.6
2.07 - Releasing and Refixing -Erection of 2 Pole Structure using RCC/PSCC Pole 7.5/8 Mtr long (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 I.No 2.07) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
2
8797
17594.3
1.2.1 - Releasing and Refixing Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.2.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
10
1070
10703.8
6.01 - Releasing and Refixing- Weasel ACSR conductor, Stringing of conductor, binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 6.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
3
6767
20301.12
2.02 - Releasing and Refixing of 9 Mtr RCC (145kg WL) Poles -Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
2368
18947.68
2.09 - Releasing and Refixing of H Frame Erection (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 2.09) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
2
687
1374.68
2.01 - Releasing and Refixing 8 Mtr PSCC (200kg WL) Poles -Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
6
1962
11772.12
5.02 - Releasing and Refixing of 4 Pin cross arm with insulator and Braces fixing - Ordinary Soil (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 45 Item No 5.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
34
340
11576.32
1.1.1 - Releasing and Refixing of Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.1.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
8
1338
10708.08
6.02 - Releasing and Refixing of Rabbit ACSR conductor, Stringing of conductor, binding of conductor on each insulator and dead ending on strain or disc /strain insulator by means of clamps (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 6.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
5
9280
46401.05
2.02 - Releasing and Refixing of 9 Mtr PSCC (200kg WL) Poles -Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 43 Item No 2.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
16
2368
37895.36
13.02 - Releasing and Refixing of GOS including wiring (11 kV Single Break 200 Amps) (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 48 Item No 13.02) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
4
2349
9397.24
1.1.1 - Releasing and Refixing of Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 44 Item No 1.1.1) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
16
1338
21416.16
8.01 - Releasing and Refixing of Distribution Transformer 63kVA on Transformer Structure (Vol-06, ESCOM's SR. 2023-24 Part- II, P.No. 46 Item No 8.01) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work.
2
2538
5077.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements