Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Daily Maintenance Of Karkala Ib And Hebri Ib And Karkala Court Building For The Year 2024-2025 in Udupi, Karnataka, with an estimated contract value of Rs. 7,23,500. The bid opening date for this tender is 30-10-2024 and the last date for bid submission is 08-11-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date30 Oct 2024
Closing Date8 Nov 2024
Tender Amount₹ 7,23,500.36
Costs
EMD
₹ 18,100Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/BD/WORK_INDENT15817Bid Award Id
ViewTender No
PWD/2024-25/BD/WORK_INDENT15817Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
8.33.1 - Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (Page No:- 46 Item No:-8.33.1 PWD Common SR Volume-2 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work
1075.8
176
190373.568
... More
20.91 - External sweeping and terrace cleaning - Cleaning of outer periphery like roads footpaths curb stones terrace including removing grass dust etc., to the nearest garbage pit using suitable coconut broomstic,bombay broomstick, squezers /wipers /rubberbru (I.No. 20.91 P.206, Vol-2 SR 2023-24 continued to 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work
57000
1
63840
... More
9.25 - Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of
Engineer-in-charge." (Page No:-63 Item No:-9.25 PWD Common SR Volume-2 for the year 2024-25) ---- including cost and conveyance of all materials with all lead and lift, loading and unloading, usage of Machinery and equipments, transportation charges, labour charges, and all other incidental charges etc., complete as per standard technical specification, and directions of the Engineer in charge of work
23.2
896
20787.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements