Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of Compound Wall And Fencing Work Of Office Of The Senior Assistant Director Of Horticulture. (ss) Horticulture Training Center,malavi,hagaribommanahalli Taluk(reserve For Sc Catogery) in Ballari, Karnataka, with an estimated contract value of Rs. 2,09,768. The bid opening date for this tender is 06-02-2025 and the last date for bid submission is 15-02-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,700Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/OW/WORK_INDENT18279Tender No
PWD/2024-25/OW/WORK_INDENT18279Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P.W.D DSR 2023-24 Vol-2 Page No-A29. Sl.No-ii.564 - Nuts and bolts
30
44
1323
... More
P.W.D CSR 2023-24 VOL-1 Page No-16 Sl.No-2.5.1 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.
5.52
6961
38427.48
... More
P.W.D CSR 2023-24 Vol-2 Page No-45. Sl.No-8.28 - Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charg
30.6
93
2859.57
... More
P.W.D DSR 2023-24 Vol-2 Page No-95. Sl.No-11.57.2 - Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete
292.5
118
34705.125
... More
P.W.D CSR 2023-24 Vol-1 Page No-15. Sl.No-2.1.1 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.
1.53
5604
8575.497
... More
P.W.D CSR 2023-24 Vol-2 Page.No-187.SI.No-19.7.1 - Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge
0.91
506
460.551
... More
P.W.D CSR 2023-24 Volume-1 Page No-11. Sl.No-1.23 - Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labor with all lead and lift complete as per specifications.
0.76
2816
2140.236
... More
P.W.D CSR 2023-24 Vol-2 Page No-17.Sl.No-6.36 - Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste including cost of all materials, labour, scaffolding and usage charges of machineries & other incidental charges complete as per the direction of engineer incharge of work
2.93
6624
19409.6385
... More
P.W.D DSR 2023-24 Vol-2 Page No-A33 Sl.No-ii.705 - RBT reinforced barbed wire 9 rounds
140
8
1176
... More
P.W.D CSR 2023-24 Vol-2 Page No-42. Sl.No-8.9 - Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labor, curing complete as per specifications and as per directions of Engineer-in-charge.
30.6
404
12370.05
... More
P.W.D CSR 2023-24 Vol-2 Page No-96. Sl.No-11.6 - Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 m openable length ( total length 90 m), having 50 nos rounds per 6 m length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/mm2 with tape (0.52 mm thick) and weight 43.478 g/m (cost of M.S. angle, C.C. blocks shall be paid separately
140
331
46452
... More
P.W.D CSR 2023-24 Vol-2 Page No-9. Sl.No-5.4 - Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
3.06
6708
20527.857
... More
P.W.D CSR 2023-24 Vol-1 Page No -112 Sl.No A1-19 - Providing & Removing Centering & Centering for Chejjas, Canopy & Other Architectural projections of minor sections 45%. Vide DSR 2023-24, Volume-I, Page No 111 & 112.and Addendum I
5.52
3132
17292.3936
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements