The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of C.c Drain & Widening Of Road From Cmc Shorapur To Rangampeth Auto Stand At Shorapur Town District Yadgir. (under Kkrdb (macro) (sdp) (non Social) For The Year 2022-23). (yad2215104425) in Yadgir, Karnataka, with an estimated contract value of Rs. 83,81,939. The bid opening date for this tender is 31-12-2024 and the last date for bid submission is 07-01-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 1,67,700Document Cost
Refer DocumentsTender Fee
₹ 2,100
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT16082Bid Award Id
ViewTender No
PWD/2024-25/RD/WORK_INDENT16082Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Vol-I I No. 2.11 b Page No 18 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification Foundations of Bridges
7.5
90516
678872.25
... More
Vol-III I No. 6.1 Page No 49 - Construction of dry lean cement concrete Sub- base over a
prepared sub-grade with coarse and fine aggregate conforming
to IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 14:1, aggregate gradation
after blending to be as per table 600-1, cement content not to be
less than 140 kg/ m3 , optimum moisture content to be determined
during trial length construction, concrete strength not to be less
than 7 Mpa at 7 days, mixed in a batching plant, transported to
site, laid with a paver with electronic sensor, compacting with
8-10 t vibratory roller, finishing and curing
247.5
5166
1278585
... More
Vol-I I No. 1.7 Page No. 7 - Construction of Embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3)
792
124
98960.4
... More
Vol-III I no. 3.6 Page No. 17 - Construction of sub-grade and earthen shoulders with approved
material obtained from borrow pits with all lifts & leads,
transporting to site, spreading, grading to required slope and
compacted to meet requirement of table No. 300-2
198
517
102494.7
... More
Vol-III I no 2.5 (ii) a Page No 9 - Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer In area of light jungle
33
412
13617.45
... More
Vol-I I No. 1.15.1 Page No. 8 - Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting
& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenaces
required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth
2640
381
1006236
... More
Vol-III I No. 3.7 Page No 17 - Loosening, leveling and Compacting original ground supporting
embankment to facilitate placement of first layer of embankment,
scarified to a depth of 150 mm, mixed with water at OMC and then
compacted by rolling so as to achieve minimum dry density as
given in Table 300-2 for embankment construction.
330
110
36382.5