The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Improvements For Damaged Road Portion In Ch 8.50 Km To 9.50 Km At Panja-kadaba In Sullia Taluk Under The Head Of Account- 5054-04-337-0-1-154 District Roads Improvements in Dakshina Kannada, Karnataka, with an estimated contract value of Rs. 79,98,649. The bid opening date for this tender is 12-02-2025 and the last date for bid submission is 19-02-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date12 Feb 2025
Closing Date19 Feb 2025
Tender Amount₹ 79,98,649.95
Costs
EMD
₹ 1,60,000Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/RD/WORK_INDENT18227Bid Award Id
ViewTender No
PWD/2024-25/RD/WORK_INDENT18227Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
16.19 - Maintenance of Drains : The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
800
6
5376
... More
5.31 - 1 IRC-37: Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
109.24
11370
1242085.0176
... More
4.17 - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
118.8
2866
340490.304
... More
5.32 - Ref. MORT&H 503 Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
4369.75
13
58729.44
... More
10.15(i) - Patching of Shallow Potholes using SDBC Gr II 25 mm thick- Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/ m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
110
294
32401.6
... More
10.15(ii) - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
165
556
91845.6
... More
1.7 - Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
381.45
133
50839.656
... More
5.9(ii)C - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-40 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
218.49
8836
1930752.432
... More
6.6 - Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008 ,Coarse aggregates and Fine aggregate confirming to IS:383-2016,transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. (Groove cutting shall be paid seperately) ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
255.99
7586
1942165.4112
... More
2.5(ii) - Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.By Mechanical Means using Dozer- In area of light jungle ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
13.5
440
5942.16
... More
8.24.2 - Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete.In slussy condition. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
3.6
398
1435.392
... More
8.15 - Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
195
593
115752
... More
8.7 - Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25
grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing" ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
3
10091
30273.6
... More
4.2 (ii) - Granular Sub-Base - A Plant Mix Method- Construction of Granular Sub-Base of required grading as
per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 V.For Grading -V Material" ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
357.3
2785
995237.712
... More
1.12 - Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
587.25
106
62483.4
... More
5.1A(i) - Prime Coat over WMM/WBM (i) Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
750
45
34440
... More
3.5 - Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- including cost and conveyance of all materials all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and as per approved design and drawing and directions of the Engineer in charge of the work.
874.5
6
5876.64