Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Package-1: Construction Of C.c.road And Drain In S.c. Colonies At Nayakanahatty Town Limit In Challakere Taluk. 2)improvements To Road From Nayakanahatty S.c. Colony To Thipperudraswamy Temple In Molakalmuru Constituency Of Challakere Taluk in Chitradurga, Karnataka, with an estimated contract value of Rs. 2,79,28,264. The bid opening date for this tender is 24-01-2022 and the last date for bid submission is 02-02-2022. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Opening Date24 Jan 2022
Closing Date2 Feb 2022
Tender Amount₹ 2,79,28,264
Costs
EMD
₹ 4,01,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KPWD/2021-22/RD/WORK_INDENT146636Bid Award Id
ViewTender No
KPWD/2021-22/RD/WORK_INDENT146636Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://kpwd.karnataka.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
KSRRB M300-14. Excavation for roadwork in all types of soil by mechanical means including cutting and loading to tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportation with a lead of 1.00 km and complete as per specifications. MORTH Specification No.301 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
429.6
-
17613.6
... More
PVC Pipes 10KG/Sqm 90mm outerdia (P:XXXIV, Sl.885, Code No.3001) Shivamoga Circle SR 2018-19 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
368
-
109152.48
... More
KSRRB M400- Wet Mix Macadam KSRRB M400-17. Providing, laying, spreading and compacting crushed stone aggregates of granite / trap / basalt to wet mix macadam specifications including pre mixing the material with water at OMC in mechanical mix plant carriage of mixed method of tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per specifications. MORTH Specification No. 406 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
585
-
1210365
... More
Providing and laying plain/reinforced cement concrete for side drains using M20 nominal mix concrete with OPC cement at 300 kgs. with 20mm anddown size granite metal coarse aggregates at 0.69 cum and fine aggregates at 0.43 cummachine mixed, wellcompacted for walls and bottom including centering, shuttering, cost of materials, HOM of machinery, curing etc.,complete excluding cost of steel as per MORTH specification No. 1500,1700, 2200.Wall & bottom thickness 10cm ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
128.88
-
1006037.28
... More
KSRRB M300-14. Excavation for roadwork in all types of soil by mechanical means including cutting and loading to tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportation with a lead of 1.00 km and complete as per specifications. MORTH Specification No.301 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
975
-
39975
... More
KSRRB M300-14. Excavation for roadwork in all types of soil by mechanical means including cutting and loading to tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportation with a lead of 1.00 km and complete as per specifications. MORTH Specification No.301 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
198.72
-
8147.52
... More
Dismantling cement concrete flooring or plain cement concrete work including removing and conveying the debris to distance upto 200m (within average thickness of 15 cms). including cost of materials, labour, HOM complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
55.04
-
4733.44
... More
KSRRB M2900- PCC M10 in Foundation KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 408 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
71.6
-
360219.6
... More
KSRRB 300-Compaction KSRRB 300-58. Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. MORTH / Chapter 3 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
3900
-
24570
... More
Construction of granular sub-base Grading-Vas Sub-base and drainage layer by providing coarse graded crushed stone aggregates of granite/ trap/basalt material, mixing in a mechanical mix plant at OMC, Carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98% proctor density, complete as per specifications. Clause 401 of MORTH V Revision ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
390
-
780780
... More
Dismantling size stone masonry in clay mortar and stacking the size stone within a radius of 50m and removing the debris to a distance upto 200m. including cost of materials, labour, HOM complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
24.32
-
6590.72
... More
KSRRB M300- Construction of Embankment with Material Gravel/ Murrum. KSRRB M300-53. Construction of embankment with approved material Gravel/Murrum with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement Table 300- 2 complete as per specifications.(Including cost of gravel / murrum, watering charges & compaction by vibratory roller to 95% of proctors density) MORTH Specification No. 305 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
865.8
-
358441.2
... More
KSRRB M2200-6. Providing T. M.T. steel reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per disign (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per specification. MORTH Specification No.1600 & 2200 TMT Bars Fe 500 ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
5.728
-
456865.22
... More
Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends, and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing complete as per specifications. Specifications. No. KSRB 1000, 2300 MOST Specification No.1000 / 2300 - - 300mm. dia ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
84
-
128856
... More
Dismantling burnt brick masonry in clay mortar/lime mortar/cement mortar and stacking the bricks within a radius of 50m and removing the debris to a distance upto 200m. including cost of materials, labour, HOM complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
25.0746
-
6193.43
... More
KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto 50m. and lift upto 1.5 m. including cost of all labour complete as per specifications. ---- Including cost and conveyance of all materials, labour, HOM of machineries, equipment, lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete, the work shall be carried out as per standard technical detailed specifications and as per the directions of the Engineer in charge of the work.
198.72
-
24045.12
Evaluation Notes How It Works ?