Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Government Higher Primary School In Boodihal, Sindanoor Taluk, Raichur District. Under- 4202-01-201-1-06-133 /for The Year 2023-24. in Raichur, Karnataka, with an estimated contract value of Rs. 1,49,47,292. The bid opening date for this tender is 31-01-2025 and the last date for bid submission is 10-02-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,24,500Document Cost
Refer DocumentsTender Fee
₹ 3,740
Summary
Government Higher Primary School In Boodihal, Sindanoor Taluk, Raichur District. Under- 4202-01-201-1-06-133 /for The Year 2023-24.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
PWD/2024-25/BD/WORK_INDENT16161Bid Award Id
ViewTender No
PWD/2024-25/BD/WORK_INDENT16161Tender Authority
Public Works Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Others - Arbitration withdrawn letter
BOQ Items
... More
P No.8 Item No. 1.14.1 KPWD. Volumn -1 DSR 2023-24 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
255.26
107
27338.346
... More
P No. 110 Item No. 12.90 KPWD. V-2 DSR 2023-24 - Providing & fixing of 3 track 2 panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at
6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having
isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with
reinforcement of 1mm thickness and Sash with overall size of 39mm 75mm with GI
reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided
with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size2419mm 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) Page No. 112 Item no. 12.90 KPWD. Volumn -2 DSR 2023-24
32.4
7070
229090.68
... More
P No. 46 Item No. 8.31 KPWD. Volumn -2 DSR 2023-24 - Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of
required shade: New work (Two coats applied @ 1.43 ltr/10 m² over and including
priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved
quality to give an even shade, after thoroughly brooming the surface to remove all
dirt, dust, mortar drops and foreign matter including preparing the surface even and
sand paper smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge. Page No.46 Item no 8.31 KPWD. Volumn -2 DSR
2023-24
388.95
186
72694.755
... More
Page No.15 Item No. 2.1.4 KPWD. Volumn -1 DSR 2023 - Providing and laying in position plain cement concrete for levelling course for all works
in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine
aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150
mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of
all materials of quality, labour, Usage charges of machineries, curing, and all the other
appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20
mm nominal size graded crushed coarse aggregates Page No.15 Item No. 2.1.4
KPWD. Volumn -1 DSR 2023-24
48.86
6527
318950.751
... More
P No. 47 Item No. 8.33.3 KPWD. V-2 DSR 2023-24 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per Page No.47 Item no 8.33.3 KPWD. Volumn -2 DSR 2023-24
47.06
145
6868.407
... More
P No. 41 Item No. 8.4.1 KPWD. V -2 DSR 2023-24 - Providing12mmcementplasterfinishedwithafloatingcoatofneatcementofmix:1:3(1cement:3finesand)tobrickmasonryincludingroundingoffcornerswhereverrequiredsmoothrendering,providingandremovingscaffolding,includingcostofmaterials,labour,curingcompleteasperspecificationsandasperdirectionsofEngineer-in-charge. Page No.41 Item no.8.4.1 KPWD. Volumn -2 DSR 2023-24
599.85
339
203439.1275
... More
P No. 18 Item No. 2.11 KPWD. Volumn -2 DSR 2023-24 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of
all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking,
laping/welding joints, tying with binding wire / soft annealed steel wire and other
ancilary operations complete as per drawing and technical specification.Page No.18
Item no. 2.11 KPWD. Volumn -2 DSR 2023-24
15.44
93929
1450276.884
... More
P No. 115 Item No. 1 KPWD. Volumn -1 DSR 2023 - FOOTING CENTERING Appendix I Additionalities for Formwork, Centering & Scaffolding
43.92
524
23050.5336
... More
P No. 50 Item No. 8.51 KPWD. Volumn -2 DSR 2023-24 - Providing and applying white cement based putty of average thickness 1 mm, of
approved brand and manufacturer, over the plastered wall surface to prepare the
surface even and smooth complete as per specifications and as per directions of
Engineer in charge. Page No.50 Item no.8.51 KPWD. Volumn -2 DSR 2023-24
975.04
105
102379.2
... More
P No. 75 Item No. 11.3 KPWD. Volumn -2 DSR 2023-24 - Providing and fixing in position collapsible steel shutters with vertical channels 20 10 2 mm and braced with flat iron diagonals 20 5 mm size, with top and bottom rail of T-iron 40 40 6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per .Page No. 75 Item no. 11.3 KPWD. Volumn -2 DSR 2023-24
7.08
8689
61523.784
... More
P No. 9 Item No. 5.4 KPWD. Volumn -2 DSR 2023-24 - CRS STONE MASONRY(BASEMENT Providing Size Stone masonry with hard stone in foundation & plinth with Cement
mortar 1:6 (1 cement : 6 coarse sand Page No.9 Item No. 5.4 KPWD. Volumn -2 DSR
2023-24
32.74
6708
219634.653
... More
P No. 99 Item No. 12.2 KPWD. Volumn -2 DSR 2023-24 - Providing Honne wood wrought and putup for purlins, common rafters and similar work including cost of materials, labour, usage charges complete as per specifications.
0.68
143083
97296.78
... More
P No. 7 Item No. 1.8 KPWD. Volumn -1 DSR 2023-24 - ConstructionofEmbankmentbyexcavatingtheavailableapprovedGravel/Murrumdepositedataplaceorborrowpitsduringorpriorexcavationwithallliftsandlead,transportationtosite,spreading,gradingtorequiredslopeandcompactingtomeettherequirementcompleteasperspecifications,includingcostoflabour,rolling,water,allmaterials,usage&allotherappurtenacesrequiredtocompletethe work. Page No. 7 Item No. 1.8 KPWD. Volumn -1 DSR 2023-24
602.67
497
299948.859
... More
PNo.8 Item No. 1.14.1 KPWD. Volumn -1 DSR 2023-24 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
191.59
107
20519.289
... More
P No. 46 Item No. 8.32 KPWD. Volumn -2 DSR 2023-24 - Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50
gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt
resistance exterior paint of required shade (Company Depot Tinted) with silicon
additives, New work (Two coats applied @ 1.43 litre/ 10 m². Over and including
priming coat of exterior primer applied @ 0.90 litre/10 m² with paint of approved
quality to give an even shade, after thoroughly brooming the surface to remove all
dirt, dust, mortar drops and foreign matter including preparing the surface even and
sand paper smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge. Page No.46 Item no 8.32 KPWD. Volumn -2 DSR
2023-24
599.84
163
98253.792
... More
P No. 47 Item No. 8.34.3 KPWD. V-2 DSR 2023-24 - Applying priming coat: With ready mixed red oxide zinc chromate primer of approved
brand and manufacture on steel galvanised iron/ steel works including preparing the
surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials,
labour complete as per specifications and as per directions of Engineer-in-charge.Page No.47 Item no 8.34.3 KPWD. Volumn -2 DSR 2023-24
47.06
52
2470.65
... More
P No. 13 Item No. 6.5 KPWD. Volumn -2 DSR 2023-24 - Providing Brick work with common burnt clay machine moulded perforated bricks of
class designation 5.0 conforming to IS: 2222 in superstructure above plinth level in
cement mortar 1:6 (1 cement : 6 coarse sand) With Non modular bricks including cost
of all materials, labour, scaffolding and usage charges of machinery & other incidental
charges complete as per the direction of engineer incharge of work. Page No. 13
Item.no 6.5 KPWD. Volumn -2 DSR 2023-24
129.32
11525
1490522.922
... More
P No. 42 Item No. 8.7 KPWD. Volumn -2 DSR 2023-24 - Providing 15 mm cement plaster with cement mortar 1:3 (1 cement:3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including
cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
388.97
384
149481.171
... More
P No. 54 Item No. 8.82 KPWD. Volumn -2 DSR 2023-24 - Polishing in high gloss/matt finish melamine clear polish on wood work in required
color/wooden shade texture with following process in the sequence as detailed
below: 1. The surface to be polished is rubbed with sand paper 80/120 no. and then
with sand = paper of 160/180 nos. 2. Applying two coats of sealer with spray gun and
allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12
hrs . The final melamine polish is applied with compressor pressure spray gun using
melamine clear polish and melamine thinner mixed in required proportion complete
as per direction of Engineer-in Charge. (Final coat to be done in 1 or 2 layers without
gap of time.) Page No.54 Item no 8.82 KPWD. Volumn -2 DSR 2023-24
138.6
710
98523.81
... More
P No. 100 Item No. 12.15 KPWD. V -2 DSR 2023-24 - Providing and fixing in position fully panelled Honne wood shutters for
doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm
wide top rail and stiles 100mm wide as per drawing and panels of 25mm
thick including cost of materials, labour, usage charges complete as per
specifications. ( excluding cost of fixtures )
14.49
7816
113256.738
... More
P No.105 Item No.12.51 KPWD. Volumn -2 DSR 2023-24 - Fixing of door frame in an existing opening including embedding frame in floor and
walls after cutting masonry for holdfasts for embedding holdfast in cement concrete
1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of
frame, making good the damages to walls and floor as required and disposal of the
debris with lead upto 50 m. including cost of materials, labour charges, complete as
per specifications Page No.105 Item no. 12.51 KPWD. Volumn -2 DSR 2023-24
5
1066
5334
... More
P No.15 Item No. 2.2.2.1 KPWD. V-1 DSR 2023-24 - Providing and laying in position Reinforced cement concrete for all Foundation works.
The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per
relevant IS Codes machine mixed with super plasticizers laid in finished layers, well
compacted using needle vibrators, including all lead & lifts, cost of all materials,
quality confirming to the requirements of relevant IS codes , labour, Usage charges of
machinery, curing and all the other appurtenances required to complete the work as
per technical specifications. (The cost of steel reinforcement & formwork to be paid
separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse
aggregates Page No.15 Item No. 2.2.2.1 KPWD. Volumn -1 DSR 2023-24
71.71
6560
470446.284
... More
P No. 9 Item No. 5.1 KPWD. Volumn -2 DSR 2023-24 - Providing Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement :
6 coarse sand) Page No.9 Item No. 5.1 KPWD. Volumn -2 DSR 2023-24
46.72
5944
277706.016
... More
P No. 115 Item No. 12 KPWD. Volumn -1 DSR 2023-2 - BEAMS CENTERING Appendix I Additionalities for Formwork, Centering & Scaffolding
50.9
1330
67725.504
... More
P No. 115 Item No. 20KPWD. Volumn -1 DSR 2023-2204 - CHAJJA CENTRING Appendix I Additionalities for Formwork, Centering & ScaffoldingPage No.115-116 KPWD. Volumn -1 DSR 2023-24
1.3
2993
3891.888
... More
PageNo.8ItemNo.1.12KPWD.Volumn -1 DSR 2023-24 - Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthanfoundationinallkindsofsoils&uptodepthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&otherappurtenancesrequiredtocompletetheworkPageNo.8ItemNo.1.12KPWD.Volumn -1 DSR 2023-24
82.32
99
8211.42
... More
P No. 115 Item No. 8 KPWD. Volumn -1 DSR 2023-24 - COLUMNS CENTERING Appendix I Additionalities for Formwork, Centering &
Scaffolding
21.94
4656
102173.7024
... More
P No. 9.34 Item No. 9.34 KPWD. V -2 DSR 2023-24 - Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and
jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour, curing, polishing complete as per specifications. Page No.64 Item no.9.34 KPWD. Volumn -2 DSR 2023-24
482.62
1622
782930.295
... More
P No. 5 Item No. 4.1 KPWD. Volumn -2 DSR 2023-24 - KSRB-3.2: Providing and injecting chemical emulsion for Pre- constructional AntiTermite Treatment, creating continuous chemical barrier under and around the
column pits, walls, trenches, basement excavation, top surface of the plinth filling,
junction of wall and floor, along the external perimeter of building, expansion joints,
over the top surface of consolidated earth on which apron is to be laid, surrounding of
pipes and conduits, with chloropyriphos emulsifiable concentrates of 20%
concentration, including cost of chemical, diluting in water to one percent
concentration, labour, HOM of equipments, complete as per specifications. (Plinth
area of the building at ground floor only shall be measured ) Page No.5 Item No. 4.1
KPWD. Volumn -2 DSR 2023-24
438.4
123
54317.76
... More
P No. 85 Item No. 11.34A KPWD. V-2 DSR 2023-24 - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S.
flats, square or round bars etc. including priming coat with approved steel primer all
complete. Fixed to steel windows by welding Page No. 85 Item no. 11.34A KPWD.
Volumn -2 DSR 2023-24
36.44
176
6428.016
... More
P No. 115 Item No. 19 KPWD. Volumn -1 DSR 2023-2 - STAIRCASE CENTERING Appendix I Additionalities for Formwork, Centering & NScaffolding Page No.115 116 KPWD. Volumn 1 DSR 2023-24
8.4
2993
25147.584
... More
P No. 115 Item No. 13 KPWD. Volumn -1 DSR 2023-24 - ROOF SLAB CENTERING Appendix I Additionalities for Formwork, Centering &
Scaffolding Page No.115-116 KPWD. Volumn -1 DSR 2023-24
57.52
1330
76533.8112
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements