Nuclear Power Corporation Of India Limited Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Nuclear Power Corporation Of India Limited - NPCIL Tender

Services
GEM
Opening Date7 Feb 2025
Closing Date28 Feb 2025
Tender Amount₹ 1,17,30,858 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Preventive Maintenance on MVs, job involves isolation of air MV instrumentation, cleaning & normalization of MV, MV Stroke checking & GS Setting.

20

-

-

... More
Preventive Maintenance on PRV, job involves either servicing & testing of PRV, or replacement of PRV. Note: PRVs will PRVs with I/L and O/L port size ¼” & port size ½”, replacement of PRV may require mounting bracket modification.

20

-

-

... More
Preventive Maintenance on SVs, job involves either servicing and testing of SV, or replacement of SV. Note: SVs will include - 3-way, 5-way SV, replacement of SV may require mounting bracket modification  SV Coil supply may be 24V DC,48V DC or 220V DC.

36

-

-

... More
Preventive Maintenance of Pressure gages, job involves either removal from field, servicing, calibration and installation of PG or replacement of PG in field after shop calibration of new PG. Note : Pressure Gages range - From vacuum to any range subject to maximum of 400 Kg/cm2.

45

-

-

... More
Preventive Maintenance of Temperature gage(TG), job involves either removal from field, servicing , calibration and installation of TG, or replacement of TG in field after shop calibration of new TG. Note: Temp Gages range - From 0 °C to any range subject to maximum of 400 Deg C.

25

-

-

... More
Preventive Maintenance of Junction Box. The job involves checking and rectification of locking arrangement, check and rectification of cables dressing and glanding, JB sealing rubber liner inspection and replacement on requirement, cleaning inside the JB and closing the holes of the JB, checking and provision JB grounding if not provided .Note: The no. of terminals of the JB shall be 50/100/200 Terminal JB.

30

-

-

... More
Preventive Maintenance of Damper instrumentation. Job involves isolation & normalization of instrumentation tubing , limit switches, solenoid valve, quick exhausts ,GS setting of damper.

20

-

-

... More
Preventive Maintenance of Pump Instrumentation-job involves isolation and normalization of pump tubing arrangements, RTDs, control cables from pull boxes.

10

-

-

... More
Preventive maintenance of flow gauges job involves either removal from field, servicing, calibration and installation of new FG, replacement of FG in field after shop checking of new FG.

9

-

-

... More
Shifting of faulty instruments from CMU shop to salvaging room.

200

-

-

... More
Maintenance on RTDs and Thermocouples with integral MI cables. Job involves Replacement of RTD or Thermocouple with complete routing of new integral MI cable, de routing of integral MI cable and removal of old RTD or Thermocouple.

20

-

-

... More
Cable glanding and termination – Job involves Glanding and termination at instrument end or JB end /gland, Making of new glanding holes by knockout punch in JB, cable routing. Note cable gland size shall be from UN 01 to UN-06.

10

-

-

... More
Laying of PVC tubes-Jobs involves laying of PVC tubes as per requirement, Arrangement for air supply connection, swaging of end points.

200

-

-

... More
Assistance for carrying out Preventive maintenance on any one of the following.         i.      Electronic pressure Transmitter       ii.      Control Valves(CVs)     iii.      Motorized air operated valves (MVs)/     iv.      Servicing/replacement of Pressure regulating valves       v.      SV replacement/testing/servicing     vi.      Calibration /replacement/servicing of Temperature gage   vii.      JB maintenance viii.      Damper instrumentation     ix.      Removal of cables       x.      Replacement of lamps     xi.      Replacement of Limit switches   xii.      H2 Leak detector /Fire detector testing xiii.      Field Multiplexing units maintenance xiv.      Beetles maintenance   xv.      Condition monitoring of systems xvi.      RTD replacement job xvii.      Cylinder sampling xviii.      EP testing/Damper Testing The job involves assistance during any one of the sub activities. i.     In-situ/Shop Calibration of Electronic pressure transmitter as per checklist /Replacement with a Calibrated pressure transmitter as per checklist. Note: Electronic pressure transmitter will be of one of the following types: pressure transmitter & differential pressure transmitter, temperature transmitter& differential temperature transmitter. ii.     Isolation of CV Instrumentation, CV Diaphragm replacement & positive seating, cleaning & normalization of CV instrumentation & scale fixing , calibration of CV . iii.     Isolation of air MV Instrumentation, cleaning & normalization of MV, MV stroke checking & GS Setting.      iv.     Servicing and Testing of PRV, replacement of PRV, replacement of PRV may require mounting bracket modification Note: PRVs will PRVs with I/L and O/L port size ¼” & port size ½”.        v.     Servicing and testing of SV, replacement of SV.      vi.     Removal from field, servicing, calibration and installation of TG, replacement of TG in field after shop calibration of new TG.    vii.     Checking and rectification of locking arrangements , check and rectification of cables dressing and glandings, JB sealing rubber liner inspection and replacement on requirement , cleaning inside the JB and closing the holes of the JB , checking and provision JB grounding if not provided. viii.     Damper, Job involves isolation & normalization of Instrumentation tubing, Limit switches, Solenoid valve, Quick exhausts, GS setting.      ix.     Disconnection of MI or PVC cable glands from both the ends of cable (Instrument and JB end) and removal of MI or PVC cable from the cable tray for an identified instrument, keeping other cables intact in the tray.        x.     Field Lamp replacement.      xi.     GS replacement & setting.    xii.     H2 Leak detector & CO2 fire detector testing with sample gas, cleaning of detectors, or replacement of faulty detectors or loop problem rectification. xiii.     Trouble shooting of Beetle FMU and its card maintenance. xiv.     Beetle cleaning and clearing deficiencies related to beetle like chattering, ME resistance checking and replacement as required.    xv.     Condition monitoring of various system. xvi.     RTD replacement. xvii.     Cylinder sampling with chemical Lab per visit to steel yard. xviii.     Leak test job related to CMU for EP and Damper.

2424

-

-

... More
Assistance for carrying out Preventive maintenance on Process switches, Pressure gages, Level Gages. The job involves assistance during in-situ/Shop Calibration of pressure switch /replacement with a Calibrated pressure switch ,removal from field, servicing, calibration and installation of PG/replacement of PG in field after shop calibration of PG, replacement of LG Glass, replacement of gasket, and replacement of LG Top & bottom isolation valve gland packing and Air hold leak check after replacement of Glass.

323

-

-

... More
Assistance for carrying out one of following Preventive maintenance /on one of the day to day maintenance.         i.      Junction boxes       ii.    Pump Instrumentation     iii.      Control cable removal     iv.      Segregation of drawings       v.      System spare arrangement     vi.      Lab instruments up keeping   vii.      Cable glanding viii.      Relay wiring assistance     ix.      CDF/BTC/Panel internal wiring assistance       x.      SWAS panel HX flushing     xi.      Rotameter cleaning   xii.      Physical protection system , BARCIS, PRESAM activities xiii.      Instrumentation assistance jobs during BSD xiv.      Arrangement of electronic items   xv.      Impulse line flushing xvi.      Turn style gate maintenance xvii.      Access control door mechanism maintenance xviii.      Installation of SS needle valve xix.      Replacement of SS tubing   xx.      SS valve replacement /SS tube rerouting assistance xxi.      DNM SV checking xxii.      DNM SV/Filter / Sample header replacement xxiii.      EP/Damper leak test The job involves assistance during any one of the sub activities,         i.            Maintenance of any of the following for Junction boxes a. Checking and rectification of locking arrangement b. Check and rectification of cables dressing and glanding c. JB sealing rubber liner inspection and replacement on requirement, d. Cleaning inside the JB and closing the holes of the JB, e. Checking and provision JB grounding if not provided       ii.    Isolation and Normalization of Pump tubing arrangements, RTDs, control cables from pull boxes.     iii.      Disconnection of MI or PVC cable glands from both the ends of cable (Instrument and JB end) and removal of MI or PVC cable from the cable tray for an identified instrument, keeping other cables intact in the tray. Note: The size of the MI cable shall be single pair to seven core and PVC cable shall be single pair to three pair     iv.      Ensuring availability of latest drawing, Listing of Missing drawing, Deposit of requisition at planning & Collection of drawings from Planning section as per requisition       v.      System spare arrangement     vi.      Glanding and termination at instrument end or JB end /gland.   vii.      Issue of Lab Instruments, Up keeping of store & Lab viii.      Drawing of material from stores     ix.      Relay wiring assistance       x.      CDF/BTC/Panel internal wiring assistance     xi.      Cleaning of SWAS HX NAPW line tubes/Hosea) Cleaning of Sensor/Cleaning of HX coil & if required replacement of coil/Ensuring the cleanness of the panel.   xii.      Removal of rotameter /Cleaning of rotameter / Normalisation in field xiii.      CCTV Cameras maintenance - Cleaning of Glasses, Alignment of Cameras, Replacement/Installation of Cameras; PIDS maintenance - regular alignment checking, Maintenance of detectors; Maintenance of DAS, GTMS units, Assistance during BARCIS & PRESAM System maintenance. xiv.      Instrumentation assistance jobs during BSD   xv.      Arrangement of capacitors, Resistors, Fuses etc in Lab xvi.      Isolation of manifold valves, Flushing of impulse line, Normalization of manifold valves, arresting of leak if any arises, Filling of condensing pot as per requirement. xvii.      Turn style gate maintenance xviii.      Access control door mechanism maintenance xix.      Installation of SS needle valve - Valve size may be 1/4",1/2",10mm,12mm tube end etc & assistance during tubing modification.   xx.      Replacement with new SS tubes, Laying & proper routing along with support arrangement, swaging of end connections, Work may involve in air, water or oil system. Size of tubes may be ,10mm,10mm,18mm,20mm etc. xxi.      SS isolation valve replacement jobs/ SS tube rerouting. SS tube/valve may be in air/water/oil system. xxii.      DNM SV checking xxiii.      DNM SV/Filter / Sample header replacemen Preparation of PRV and PG setup with internal tubing/ Carrying PVC tubes and test setup to leak test location, connection and removal for testing of EP/Damper .

3712

-

-

... More
Assistance for carrying out one of following Preventive maintenance /on one of the day to day maintenance.         i.    Maintenance on RTDs and Thermocouples       ii.    Spare arrangement in C&I job shack     iii.      Shifting of scrap     iv.      Field instruments housekeeping      v.     Water supply and filtration plant The job involves assistance during any one of the sub activities,         i.    One to one Replacement of RTD or Thermocouple with complete routing of new integral MI cable, de routing of integral MI cable and removal of old RTD or Thermocouple       ii.    Spare arrangement in C&I job shack, listing and housekeeping of material C&I shack     iii.      Shifting of scrap from Salvaging room/C&I job shack to Scrap yard     iv.      Cleaning of dust from field instruments, Ensuring the availability of Valid calibration sticker in good shape, Ensuring the availability of Instruments Tags, Ensuring the proper mounting & glanding (as applicable).       v.      Water supply and filtration plant Instrument maintenance

1055

-

-

... More
Assistance for carrying out one of following Preventive maintenance on any one of the day to day maintenance.         i.    Maintenance & Replacement of Pull boxes       ii.    Maintenance on Identification related issues and provision of Instrumentation supports.     iii.      Drawing of material from store for inspection/ C&I job shack     iv.      Depositing of material from store for inspection/ C&I job shack       v.      Arrangement of N2 Cylinder for calibration arrangement in shop     vi.      LG leak attending   vii.      Installation of Brass Needle valves viii.      Replacement of existing Copper tubing with new copper tubes     ix.      Flow gauges maintenance The job involves assistance during any one of the sub activities,         i.    Preparation of new pull box in shop, fixing in field, glanding the cables and termination of wires, Checking and rectification of Pull box holes, cover, cable glands; dressing and clamping of cables connected to pull box       ii.    Identification, Letter & number punching on metal tags and Provision of tag on instrument/Instrumentation Supports fixing & rectification     iii.    Identification, depositing/ drawing of material from CMM stores/C&I job shack by battery operated truck     iv.    Identification, depositing of inspected material to CMM stores/C&I job shack by battery operated truck       v.    Arrangement of N2 Cylinder for calibration arrangement in shop     vi.    Replacement of LG Glass/Replacement of Gasket/ Replacement of LG Top & bottom isolation valve gland packing / Air hold leak check after replacement of Glass.   vii.    Installation of Brass Needle valves -Valve size may be 1/4",1/2",10mm,12mm tube end etc. & required tubing modification if required. viii.    Replacement with new tubes, laying & proper routing along with support arrangement, Swaging of end connections, Work may involve in air, water or oil system.     ix.     Removal from field, servicing, calibration and installation of new FG/ Replacement of FG in field after shop checking of new FG.

1306

-

-

... More
(Signature of Contractor or their Authorised Representative with Company Seal)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.