New Mangalore Port Trust Tender

... More
The NMPT has issued a formal invitation for competitive bids for the New Mangalore Port Trust project, for Post Monsoon Maintenance Dredging At New Mangalore Port For The Years 2024-25 And 2025-26 (2 Years) Under T in Dakshina Kannada, Karnataka, with an estimated contract value of Rs. 1,44,60,86,737. The bid opening date for this tender is 25-11-2024 and the last date for bid submission is 16-06-2025. Interested bidders for New Mangalore Port Trust tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

New Mangalore Port Trust - NMPT Tender

Works
Excavation
Eprocure
Opening Date25 Nov 2024
Closing Date16 Jun 2025
Tender Amount₹ 1,44,60,86,737 
Notes
Download

Costs

  • EMD

    ₹ 3,41,27,700
  • Document Cost

    ₹ 1,680
  • Tender Fee

    ₹ 1,680

Summary

Post Monsoon Maintenance Dredging At New Mangalore Port For The Years 2024-25 And 2025-26 (2 Years) Under T

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance Dredging on in-situ basis by deploying the Trailer Suction Hopper Dredger in the areas of Outer Approach Channel, Lagoon (drawing of the Dredging area enclosed), including Oil Dock Arm, Turning Circle and in front of K.I.O. Berth (Extension Lagoon). The areas required to be dredged from the existing levels to their minimum designed depths of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 up to Centre Line of O.A.C, (-)12.00 mCD at B.No. 2, ( -) 11.00 mCD at B.Nos.3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No.8 & 12 (-)12.50 mCD at Be rth No.9, (-)15.10 mCD at Berth Nos.14 (W),15,16,10, 11, & 13. The outer approach channel is of total length 7500 mts. (towards sea which depends upon the shifting of the (-) 15.40 m contour due to siltation). Maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand, clay etc. The dredged material is to be taken away by the dredging Contractor for reuse / recycling of dredged material generated out of SI.No.1, 2 & 4 of Part I of BOQ for beneficial use subject to conditions in the Environmental Clearance for disposal of dredged material after taking due permissions from the competent State Authorities, as required, by the dredging Contractor. The bidders shall make their own arrangement for dumping area outside the Port limits for temporary storage of dredged material since NMP doesn’t have on shore dumping area in its premises. The responsibility of dumping of dredged material, storing at yard, treatment of the dredged material and subsequent disposal to prospective users will be the responsibility of the Dredging Contractor, cost including Mobilisation and De-mobilisation charges for TSHD including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc., complete for the satisfactory completion of the Dredging work.

14570568.47

-

-

... More
Dredging all types of soil including sand, silt and clay below the deck structure area of pump house No.1,2 &3 from the existing level to (-) 6.00 mCD for 1&2 and (-) 10.00 mCD for Pump house No.3 with a tolerance of +0.5 mts including slope and to discharge dredged material to the dock arm areas uniformly beyond a lead of 150 m as directed by the Engineer-in-charge by deploying a Circle pump Dredger 250 cum per hour output or a suction pump dredger or any other suitable method including cost of labour, mobilisation and de-mobilisation etc., complete for successful completion of work.

13156.91

-

-

... More
Dredging on In-situ Basis by using any special dredging equipment viz., Grab/ Cutter/ Bucket/ Plough etc. with allied equipment’s to dredge/clear the area within 0 to 7 mts. from the berth face whenever the berth is vacant without affecting the port operations from the existing levels in all types of soils comprising of sand, silt deposits of spillage of iron ore / mines, fallen wooden logs, tyres, fenders, boulders, rock /concrete pieces, debries, steel plates, chains, wire ropes, cement bags, tarpaulins, etc. upto a depth of (-) 8.00 mCD at B.No. 1, and in front of B.No.1 upto Centre Line of O.A. C, (-)12.00 mCD at B.No. 2, ( -) 11.00 mCD at B.Nos. 3, (-) 10.50 mCD at B. No. 4 to 7 in the ODA, & 14 (E), (-) 14.00 mCD at B. No. 8 & 12 (-) 12.50 mCD at Berth No. 9, (-) 15.10 mCD at Berth Nos.14(W), 15,16,10,11 and 13 without damaging the existing structures, fenders etc., and dumping the dredged material at deeper areas away from berth face and the same shall be dredged/cleared simultaneously by TSHD and to be taken away by the dredging Contractor for reuse / recycling of dredged material generated out of SI.No.1, 2 & 4 of Part I of BOQ for beneficial use subject to conditions in the Environmental Clearance for disposal of dredged material after taking due permissions from the competent State Authorities, as required, by the dredging Contractor. The bidders shall make their own arrangement for dumping area outside the Port limits for temporary storage of dredged material since NMP doesn’t have on shore dumping area in its premises. The responsibility of dumping of dredged material, storing at yard, treatment of the dredged material and subsequent disposal to prospective users will be the responsibility of the Dredging Contractor, cost including Mobilisation and De-mobilisation charges for Dredgers including Survey launch, routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc., and transporting and dumping the dredged material in the designated dumping ground complete for the satisfactory completion of the Dredging work.

132637.85

-

-

... More
PART-II:

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.