Minor Irrigation Department Tender

... More
The Minor Irrigation Department has issued a formal invitation for competitive bids for Package :- Restoration Of Tank Near Hiriyuru Mallenahalli In Holalkere Taluk Chitradurga District, Restoration Of Kereyagalahalli Tank In Holalkere Taluk Chitradurga Districtand Restoration Of Kakabalu Tank At R Sy No.6 In Chitradurga Taluk And Dist in Chitradurga, Karnataka, with an estimated contract value of Rs. 2,60,78,830. The bid opening date for this tender is 23-05-2022 and the last date for bid submission is 03-06-2022. Interested bidders for Minor Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Minor Irrigation Department Tender

Opening Date23 May 2022
Closing Date3 Jun 2022
Tender Amount₹ 2,60,78,830 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
De-silting tank bed/Feeder Channel/ Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

18929.38

-

813963.34

... More
Excavation for foundation in all kinds of soil by mechanical means including boulders upto 0.60 m dia ( 0.113 cum ) for foundation of canal cross drainage and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

42.5

-

2295

... More
Providing casing embankment using semi-pervious soil from approved borrow areas in layers of 250 to 300 mm before compaction including cost of all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using power roller etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

5513.39

-

1432378.72

... More
Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

2406.08

-

1161655.42

... More
Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 250 to 300 mm before compaction including cost of all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using power roller etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

7810.63

-

2029201.67

... More
Clearing thick jungle growth (less than 50 percent open space) including bushes upto 300 mm / parthenium and other weeds including burning or disposing off the same as directed etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

7840

-

23520

... More
Providing, fabricating and placing in position reinforcement steel for RCC structures including cleaning, straightening, cutting, bending, hooking, lapping, welding joints wherever required, tying with 1.25 mm dia. soft annealed steel wire, including cost of all materials, machinery, labour etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

2.01

-

159147.3

... More
Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen he existing bund including disposing off the excavated soil in specified dump area or as directed Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

1100.53

-

243217.13

... More
Removing dry stone rivetment and stacking the released materials as directed with all lead lifts etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

2940.76

-

638144.92

... More
Excavation in all kinds of soil by mechanical means including boulder upto 0.6 m diameter ( 0.113 cum ) field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

4200

-

214200

... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centring,scaffolding,cleaning, batching, mixing, placing in position, levelling,vibrating, finishing, curing etc., complete for plain concrete works with all lead and lifts.( Cement content: 240 kg /cum with use of super plasticiser) Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

30

-

166526.7

... More
Providing rubble stone / boulder filling behind abutment / below apron including cost of all materials, labor, hand packing, finishing top surface etc., Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

100

-

70552

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centring,scaffolding,cleaning, batching, mixing, placing in position, levelling,vibrating, finishing, curing etc., complete for plain concrete works with all lead and lifts.( Cement content: 330 kg /cum with use of super plasticiser)Complete with all lead & lift, loading & unloading charges, labour equipment & hire charges of machineries cost & conveyance of all materials, including shoring & strutting including dewatering and diversion of water etc., complete as per detailed specification & as directed by Engineer-in-charge.

67

-

419951.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.