Minor Irrigation Department Tender
... More
The Minor Irrigation Department has issued a formal invitation for competitive bids for Construction Of Bandhara Near Village Talwada (m) Taluka Bhalki Dist Bidar in Bidar, Karnataka, with an estimated contract value of Rs. 2,20,82,418. The bid opening date for this tender is 21-01-2025 and the last date for bid submission is 03-02-2025. Interested bidders for Minor Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Minor Irrigation Department Tender
Opening Date21 Jan 2025
Closing DateCancelled
Tender Amount₹ 2,20,82,418.5
Costs
EMD
₹ 3,32,000Document Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
MI/2024-25/AB/WORK_INDENT3477Tender No
MI/2024-25/AB/WORK_INDENT3477Tender Authority
Minor Irrigation Department ViewPurchaser Address
-Website
http://eproc.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Others - Exemption of machinery
Others - Detailed specification
Others - General specification
BOQ Items
... More
KPWD Common Uni SR Vol-1 Item No.1.15.2 Page 9 - Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting
& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenaces
required to complete the work.
a)In ordinary/soft rock without blasting depth exceeding 1.5m but not exceeding 3m with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
898.57
446
400986.8625
... More
KPWD Common Uni SR Vol-1 Item No.2.5.2 Page 16 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
294.45
8047
2369548.0965
... More
KPWD Common Uni SR Vol-1 Item No.1.14.1 Page 8 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
2695.72
107
288711.612
... More
KPWD Common Uni SR Vol-1 Item No.2.2.1 Page 15 - Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
491.31
6799
3340608.3009
... More
Common SR Vol.1 It.No. 2.1.3 P.No.15 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specification mix 1:3:6 using 40mm nominal size graded crused coarse aggregates with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
289.09
6288
1817928.0105
... More
WRD MI Common uni SR Vol-4 Item No.8.2.1 Page 101 - Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
200
26
5356
... More
WRD MI Common Uni SR Vol-4 Item No.3.41.2 Page 54 - Providing and constructing 300mm thick dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
1890
477
902947.5
... More
WRD MI Common Uni SR Vol-4 Item No.1.1 Page 129 - Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work
186.2
353
65886.87
... More
WRD MI Common uni SR Vol-4 Item No.8.3 Page 101 - Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete with all leads and lifts including loading & unloading as per the directions of the Engineer-incharge of the work.
2000
9
19740
... More
WRD MI Common Uni SR Vol-4 Item No.3.4 Page 47 - Providing hearting casing embankment using homogeneous approved soil from borrow areas in layers of 250 to 300 mm before compaction including cost of all materials machinery labour all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations cmplete with all leads and lifts including loading & unloading as per the directions of the Engineerincharge of the work
810
642
520506
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements