Ministry Of Road Transport And Highways Tender

... More
The MORTH has issued a formal invitation for competitive bids for the Ministry Of Road Transport And Highways project, for Short Term Maintenance Contract Stmc For The Stretch From Km 35.00 To Km 71.60 Of Nh 275 Jalsuru Sampaje Section Pertaining To National Highway Division Mangaluru In The State Of Karnataka in Dakshina Kannada, Karnataka, with an estimated contract value of Rs. 3,42,52,000. The bid opening date for this tender is 21-05-2025 and the last date for bid submission is 05-06-2025. Interested bidders for Ministry Of Road Transport And Highways tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date21 May 2025
Closing Date5 Jun 2025
Tender Amount₹ 3,42,52,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Km 35.00 to Km 71.60 (As per Detailed Estimate)

42000

60

-

... More
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials by (Tractor) and stacking of serviceable material to be used or auctioned, up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete (For new road) - In area of light jungle by Mechanical means.

-

-

-

... More
Km 35.00 to Km 71.60 (As per Detailed Estimate)

5.104

35860

-

... More
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811, including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., complete. Type - A, "W" : Metal Beam Crash Barrier

-

-

-

... More
Km 35.00 to Km 71.60 (As per Detailed Estimate)

2800

3908

-

... More
BILL NO.2: MAINTENANCE IN EMERGENCY

-

-

-

... More
Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side, including all labour, lead, lifts, loading, unloading,transporting etc., complete. Note : Landslide Clearance involves pushing of loose earth slided on the road surface from hill side face on the valley side. Since no cutting of original ground is involved, the output of dozer has been taken as 60 cum per hour for soil, ordinary rock and blasted hard rock. However if there are objections to disposing of earth on valley side, additional resources for its disposal shall be considered as per site conditions.

-

-

-

... More
Km 35.00 to Km 71.60 (As per Detailed Estimate)

17500

92

-

... More
BILL NO -3 : PERFORMANCE BASED PAVEMENT REPAIR & ROAD MAINTENANCE

-

-

-

... More
Routine Maintenance of road assets and pavement as given below: (i) Clearing and grubbing road land (ii) Repair of potholes/edge cuts/ruts/ patches (iii) Carrying out cleaning, removing of dust/silt/thrash from carriageway. (iv) Cleaning, clearing and repairing roadside open/unlined/lined/covered drains and cross drainage works maintenance of road signs and delineators

-

-

-

... More
For 36.600 Km (2 lane without paved shoudler)

402.6

38475

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.