Karnataka Urban Water Supply And Drainage Board Tender

... More
The KUWSDB has issued a formal invitation for competitive bids for the Karnataka Urban Water Supply And Drainage Board project, for Providing Water Supply Distribution System To Kaup Town Including O & M For A Period Of 5 Years Under Amrut 2.0 (through Design, Build, Operate And Transfer (dbot) Mode) in Mysuru, Karnataka, with an estimated contract value of Rs. 24,34,43,889. The bid opening date for this tender is 28-12-2022 and the last date for bid submission is 30-01-2023. Interested bidders for Karnataka Urban Water Supply And Drainage Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Karnataka Urban Water Supply And Drainage Board - KUWSDB Tender

Opening Date28 Dec 2022
Closing Date30 Jan 2023
Tender Amount₹ 24,34,43,889 
Notes
Download

Costs

Summary

Providing Water Supply Distribution System To Kaup Town Including O & M For A Period Of 5 Years Under Amrut 2.0 (through Design, Build, Operate And Transfer (dbot) Mode)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
O&M excluding power charges for 5th year of Distribution, service reservoirs (Including Defect Liability Period) including HSC etc., complete, and all the assets created with minimum staff as per the requirement specified in CPHEEO manual. The material cost in case of breakdown & repairs within the defect liability period shall be borne by the contractor. The rate includes Internet charges & office stationeries for the office established by the contractor at Kaup town, with all lead and lift as directed by the Engineer-in-charge. Also includes Cost of chemicals, consumables & service charges after DLP The rent and House keeping & security arrangements for the offices established by the contractor borne by the contractor. (Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items).

1

-

5211858

... More
O&M excluding power charges for 3rd year of Distribution, service reservoirs (Including Defect Liability Period) including HSC etc., complete, and all the assets created with minimum staff as per the requirement specified in CPHEEO manual. The material cost in case of breakdown & repairs within the defect liability period shall be borne by the contractor. The rate includes Internet charges & office stationeries for the office established by the contractor at Kaup town, with all lead and lift as directed by the Engineer-in-charge. Also includes Cost of chemicals, consumables & service charges after DLP The rent and House keeping & security arrangements for the offices established by the contractor borne by the contractor. (Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items).

1

-

4307321

... More
Survey, Design & Construction of 5.00 LL capcity 1 No 15 mtr Staging RCC Over Head Tank in DMA 4 (Muloor Area) including all accessories etc., complete with all lead and lift and any other components required for technically completing the works as specifications and system design criteria and any other components required for technically completing the works as per specifications and system design criteria .(Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items)

1

-

13220245

... More
Survey, design, Providing, laying, jointing, testing and commissioning of 75mm/90mm/110mm/160mm/200mm dia HDPE PE-100, PN-10 and 250 mm & 300 mm DI K-7 distribution pipeline of 71.70 Kms length, including Online Monitoring system for four zones, Restoration of Macadam and Asphalt and Concrete Road, Construction of RCC Valve Chambers, Construction of RCC Anchor blocks as per tender requirements, design criteria and specifications etc, complete, as directed by Engineer in charge with all lead and lifts and any other components required for technically completing the works as per specifications and system design criteria complete with all lead and lift as directed by the Engineer Incharge (Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items)

1

-

174826949

... More
Part A : Survey, Design,Providing ,laying, jointing, testing and commissioning of DI K9 Pure water rising main from pure water rising main from Kaup Beach road junction to Proposed tank in Muloor area, DMA 4 of Kaup Town along with fixing of valves, construction of support pillar, valve chambers & Thrust blocks, Trenchless crossings, all kinds of road restoration etc. wherever necessary complete with all lead and lift and any other components required for technically completing the works as per specifications and system design criteria .(Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items)

1

-

11964172

... More
Part-B: O & M excluding power charges for 1st year of Distribution, service reservoirs (Including Defect Liability Period) including HSC etc., complete and all the assets created with minimum staff as per the requirement specified in CPHEEO manual. The material cost in case of breakdown & repairs within the defect liability period shall be borne by the contractor. The rate includes Internet charges & office stationeries for the office established by the contractor at Kaup town, with all lead and lift as directed by the Engineer-in-charge. Also includes Cost of chemicals, consumables & service charges after DLP The rent and House keeping & security arrangements for the offices established by the contractor borne by the contractor. (Shall be read in conjunction with Section 7:Specifications, Special specifications for all the items)

1

-

3559769



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.