Karnataka Urban Infrastructure Development And Finance Corporation Tender

... More
The KUIDFC has issued a formal invitation for competitive bids for the Karnataka Urban Infrastructure Development And Finance Corporation project, for Construction/upgradation Of Sewerage System In Nanjangudu Town in Bengaluru, Karnataka, with an estimated contract value of Rs. 18,44,66,802. The bid opening date for this tender is 11-06-2025 and the last date for bid submission is 30-06-2025. Interested bidders for Karnataka Urban Infrastructure Development And Finance Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Karnataka Urban Infrastructure Development And Finance Corporation - KUIDFC Tender

Opening Date11 Jun 2025
Closing Date30 Jun 2025
Tender Amount₹ 18,44,66,802 
Notes
Download

Costs

Summary

Construction/upgradation Of Sewerage System In Nanjangudu Town

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
NANJ 009 - Part C - O&M for 5 years. O & M for proposed 0.25 MLD STP & wet wells for 4th Year. Operation and maintenance of the proposed 0.25 MLD STP & wet wells which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of Sewage Treatment Plant & wet wells works 1. Regular maintenance of all civil structures inside the Sewage Treatment Plant & wet well premises. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Operation and maintenance of Sewage Treatment Plant including dosing of required quantity of media, materials and other chemicals including replacement of any component as required as per standard of established norms from time to time. Maintaining the quality of treated sewage as per the guidelines set forth by the NGT, KSPCB and CPHEEO manual including cost of testing of treated sewage at a regular interval. 3. Operation and maintenance of all kinds of pumping machinery, and other mechanical components including electrical maintenance covering all repairs/replacement of transformers / electrical cable/switchboards/replacement of burnt parts of machinery all the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the STP & wet wells. Note: Helpers / Watchman / Technical staff made available round the clock for maintenance period at Sewage Treatment Plant. The contractor should maintain a Logbook on the working of pumping machinery at the Sewage Treatment Plant.

1

4679818

4679818.63

... More
NANJ 008 - Part C - O&M for 5 years. O & M for proposed 0.25 MLD STP & wet wells for 3rd Year. Operation and maintenance of the proposed 0.25 MLD STP & wet wells which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of Sewage Treatment Plant & wet wells works 1. Regular maintenance of all civil structures inside the Sewage Treatment Plant & wet well premises. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Operation and maintenance of Sewage Treatment Plant including dosing of required quantity of media, materials and other chemicals including replacement of any component as required as per standard of established norms from time to time. Maintaining the quality of treated sewage as per the guidelines set forth by the NGT, KSPCB and CPHEEO manual including cost of testing of treated sewage at a regular interval. 3. Operation and maintenance of all kinds of pumping machinery, and other mechanical components including electrical maintenance covering all repairs/replacement of transformers / electrical cable/switchboards/replacement of burnt parts of machinery all the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the STP & wet wells. Note: Helpers / Watchman / Technical staff made available round the clock for maintenance period at Sewage Treatment Plant. The contractor should maintain a Logbook on the working of pumping machinery at the Sewage Treatment Plant.

1

4456970

4456970.33

... More
NANJ 003 - Part A - Laying of sewer network & other allied works. Construction of Wet well. Construction of 5 mtr dia & 7.7 mtr depth Wet Well with PTU, including Electrification works. a) Site cleaning, excavation in all kind of soils and rocks, etc. b) Construction of Primary Treatment Unit (PTU) at Proposed Wet Well. c) Electrification of Wet Well. d) Providing and laying rising main pipeline with 200 mm dia DI K9 pipes conforming to IS 8329-2000, Length - 300 m. e) Providing 3 Nos of 5 HP or suitable HP. Discharge 20 to 100 M3/hour Nonclog Submersible Sewage Pumping machineries. f) Construction of compound wall. g) Construction of Guard room. Note. 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract. 2) Work shall be carried out as per the instructions of the engineer in charge. 3) Drawings are enclosed only for tender purpose.

1

12360830

12360830.5

... More
NANJ 004 - Part A - Laying of sewer network & other allied works. Construction of Wet well. Arranging for 11 KV power supply to the proposed Wet Well, including Transformer yard. Note. 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract. 2) Work shall be carried out as per the instructions of the engineer in charge. 3) Drawings are enclosed only for tender purpose.

1

3556605

3556605.65

... More
NANJ 001 - Part A - Laying of sewer network & other allied works. Providing sewer pipeline and machineholes, including restoration of roads. It includes the following works. a) Site cleaning, excavation in all kinds of strata, including cutting and excavation & Restoration of Asphalt Road,Concrete Road, etc. b) Providing and laying pipeline with 160, 250 mm dia u-PVC SN-8 pipes conforming to IS 16098 2013, including specials and all other appurtenances, length - 11570 m. c) Providing and laying pipeline with 200, 250 mm dia DI K9 pipes conforming to IS 8329-2000, Length - 150 m. d) Providing and construction of cast-in-situ / pre-cast RCC machineholes of 1.2 m dia with heavy duty SFRC covers, depth varies from 1.4 m to 2.3 m e) Providing and construction of cast-in-situ / pre-cast RCC machineholes of 1.5 m dia with heavy duty SFRC covers, depth varies from 2.4 m to 4.3 m f) Providing and construction of cast-in-situ / pre-cast RCC machineholes of 1.8 m dia with heavy duty SFRC covers, depth varies from 4.4 m to 5.7 m g) Restoration of roads to original condition. h) Refilling available earth around trenches, pipelines or machineholes. i) Any other appurtenance/Allied works applicable as per the site conditions and design requirement. j) Other allied works to complete the work. Note. 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract. 2) Work shall be carried out as per the instructions of the engineer in charge. 3) Drawings are enclosed only for tender purpose.

1

77725936

77725936

... More
NANJ 002 - Part A - Laying of sewer network & other allied works. Providing individual UGD House Service Connections (HSC). Providing 4531 nos. 110 mm dia pvc-u individual UGD house service connections (which shall be laid inside the customer property), which includes the following. a) Providing and laying 110 mm dia PVC-U pipe dia SN 8 grade conforming to IS 16098: 2013. b) Providing and fixing 315 mm dia PE inspection chamber with lid and inlet and outlet arrangments. c) Necessary Civil works, concrete works and pipe fittings. Note. 1) All works and items shall be executed as per the IS, MoRTH specifications, CPHEEO guidelines and specifications mentioned in the contract. 2) Work shall be carried out as per the instructions of the engineer in charge. 3) Drawings are enclosed only for tender purpose.

1

37960809

37960809

... More
NANJ 007 - Part C - O&M for 5 years. O & M for proposed 0.25 MLD STP & wet wells for for 2nd Year. Operation and maintenance of the proposed 0.25 MLD STP & wet wells which includes, providing technical staff, operators, and others who are required to run the system in a complete manner and providing all materials & chemicals required, for the operation of Sewage Treatment Plant & wet wells works 1. Regular maintenance of all civil structures inside the Sewage Treatment Plant & wet well premises. The maintenance consists of all kinds of repairs to damaged structures, cleaning and washing, and painting for civil structures once in two years 2. Operation and maintenance of Sewage Treatment Plant including dosing of required quantity of media, materials and other chemicals including replacement of any component as required as per standard of established norms from time to time. Maintaining the quality of treated sewage as per the guidelines set forth by the NGT, KSPCB and CPHEEO manual including cost of testing of treated sewage at a regular interval. 3. Operation and maintenance of all kinds of pumping machinery, and other mechanical components including electrical maintenance covering all repairs/replacement of transformers / electrical cable/switchboards/replacement of burnt parts of machinery all the above repairs & maintenance will be carried out as per the direction of the Engineer-in-charge for the satisfactory functioning of the STP & wet wells. Note: Helpers / Watchman / Technical staff made available round the clock for maintenance period at Sewage Treatment Plant. The contractor should maintain a Logbook on the working of pumping machinery at the Sewage Treatment Plant.

1

4244733

4244733.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.