Karnataka Neeravari Nigam Limited Tender

... More
The KNNL has issued a formal invitation for competitive bids for the Karnataka Neeravari Nigam Limited project, for Arranging Power Supply To 42.50 Hp Water Supply Installation In The Name Of Shri Assistant Executive Engineer Knnl Saundatti Site At Near Jogalbhavi At Saundatti, In O & M Hescom Urban Section in Belagavi, Karnataka, with an estimated contract value of Rs. 9,00,000. The bid opening date for this tender is 02-04-2025 and the last date for bid submission is 15-04-2025. Interested bidders for Karnataka Neeravari Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Karnataka Neeravari Nigam Limited - KNNL Tender

Opening Date2 Apr 2025
Closing Date15 Apr 2025
Tender Amount₹ 9,00,000 
Notes
Download

Costs

Summary

Arranging Power Supply To 42.50 Hp Water Supply Installation In The Name Of Shri Assistant Executive Engineer Knnl Saundatti Site At Near Jogalbhavi At Saundatti, In O & M Hescom Urban Section

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Rabbit ACSR Conductor with @1.5% Sag , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

0.1218

64814

7894.3452

... More
As per HESCOM rates - ESCOM Establishment cost @ 20% on Total Labour charges as applicable

1

7381

7381.04

... More
As per HESCOM rates - Transformer inspection test bench + GST

1

296

296

... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

6228

6228

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Guy concreting with Boulders, Mud & Sand as per Drawing No BESCOM/GM/CP/7 Dt : 24.10.2007 (with out Cement ) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

200

200

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Spiral Earth Electrode , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

318

318

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 2 No's of fish plate, bolts, nuts and washers-MS( Using for Studd oly) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

331

662

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: GI Wire 8 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

5

77

389.25

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Base concreting CC 1:4:8 For11/9.5/9/8 Mtr pole (500X650X150 MM), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

273

546

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Guy Wire 7/10 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

10

80

801.2

... More
As per HESCOM rates - Goverment electrical inspectorate charges as per actuals.

1

3600

3600

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 11kV Horizontal cross arms with H.T.Single top support, clamp, bolts, RCC Pole , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

790

1580

... More
As per HESCOM rates - Supervision charges shall be collected at 10% on all items from 1 to 4

1

55286

55286.96

... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : a) LT Protection Kit for 63 kVA , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

2175

2175

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-5 Star Rated with Oil , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

377120

377120

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,5KN, composite / Polymeric pin insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

3

221

663

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers without braces-MS (for 8 Mtr PSC/PCC Pole), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

557

1114

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Spiral Earth Electrode, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

318

636

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,45KN, Polymer insulator / silicon rubber composite insulator, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

3

202

606

... More
As per HESCOM rates - PART-A For EXTENSION OF HT 11KV LINE MATERIALS, supplying and fixing RCC Poles for 9Mtr Long. 145kg WL , , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

8494

8494

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : 1.1KV Ceramic Pin Insulator With GI pin, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

4

65

260

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers 8 Mtr RCC Pole, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

561

561

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : No. 8KV Strain Insulator, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

8

25

200

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: PSC Poles for 8 Mtr. Long, 140kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

4650

9300

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : PSC Poles for 11 Mtr. Long, 365 kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

9838

19676

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Weasel ACSR Conductor With @ 1.5% sag, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

0.325

39438

12817.35

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV Lightning Arester, Metal Oxide 9kV, 5kA Polymetic Type with ground disconnector , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

1826

1826

... More
As per HESCOM rates - Supervisor charges as applicable

1

34666

34666

... More
As per HESCOM rates - Contingencies @ 2% on Total material & labour (1+2)

1

10719

10719.97

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Earthing materials pipe type for grounding with accessories as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

3

2458

7374

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Guy set with No.15KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07 , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

1657

1657

... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 11KV, 5KN composite / Polymeric Pin Insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

6

221

1326

... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

4110

4110

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: CAUTION /DANGER BOARD , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

207

207

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: DP Transformer structure using RCC Pole- 9 Mtr Long, 145 Kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

37758

37758

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Guy set with No.8KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

1627

1627

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Guy concreting in marshy area (providing cement concret 1;2:4 for anchor rod in marshy/black cotton soil 600*600450 mm), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

881

881

... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Anticlimbing device (12 mtr GI Barbed Wire)

2

125

250

... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

1

8305

8305

... More
As per HESCOM rates - Special locality Allowance @ 20% on labour charges

1

6150

6150.86

... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Pole concreting CC 1:2:4 (without coping) for 11 mtr PSCC POLE (650X500X2000), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge

2

3349

6698

... More
As per HESCOM rates - Security deposit

1

52920

52920



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.