Karnataka Neeravari Nigam Limited Tender
... More
The KNNL has issued a formal invitation for competitive bids for the Karnataka Neeravari Nigam Limited project, for Arranging Power Supply To 42.50 Hp Water Supply Installation In The Name Of Shri Assistant Executive Engineer Knnl Saundatti Site At Near Jogalbhavi At Saundatti, In O & M Hescom Urban Section in Belagavi, Karnataka, with an estimated contract value of Rs. 9,00,000. The bid opening date for this tender is 02-04-2025 and the last date for bid submission is 15-04-2025. Interested bidders for Karnataka Neeravari Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 22,500Document Cost
Refer DocumentsTender Fee
₹ 500
Summary
Arranging Power Supply To 42.50 Hp Water Supply Installation In The Name Of Shri Assistant Executive Engineer Knnl Saundatti Site At Near Jogalbhavi At Saundatti, In O & M Hescom Urban Section
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KNNL/2023-24/EL/WORK_INDENT840/CALL-2Bid Award Id
ViewTender No
KNNL/2023-24/EL/WORK_INDENT840/CALL-2Tender Authority
Karnataka Neeravari Nigam Limited ViewPurchaser Address
-Website
http://http://knnlindia.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Others - SPECIFICATIONS OF ELECT
Others - Tender notification
BOQ Items
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Rabbit ACSR Conductor with @1.5% Sag , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
0.1218
64814
7894.3452
... More
As per HESCOM rates - ESCOM Establishment cost @ 20% on Total Labour charges as applicable
1
7381
7381.04
... More
As per HESCOM rates - Transformer inspection test bench + GST
1
296
296
... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : c) LT Metering box with CTs and necessary wiring for housing ETV Meter (Please see CDS-42) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
6228
6228
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Guy concreting with Boulders, Mud & Sand as per Drawing No BESCOM/GM/CP/7 Dt : 24.10.2007 (with out Cement ) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
200
200
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Spiral Earth Electrode , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
318
318
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 2 No's of fish plate, bolts, nuts and washers-MS( Using for Studd oly) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
331
662
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: GI Wire 8 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
5
77
389.25
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Base concreting CC 1:4:8 For11/9.5/9/8 Mtr pole (500X650X150 MM), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
273
546
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Guy Wire 7/10 SWG , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
10
80
801.2
... More
As per HESCOM rates - Goverment electrical inspectorate charges as per actuals.
1
3600
3600
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 11kV Horizontal cross arms with H.T.Single top support, clamp, bolts, RCC Pole , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
790
1580
... More
As per HESCOM rates - Supervision charges shall be collected at 10% on all items from 1 to 4
1
55286
55286.96
... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : a) LT Protection Kit for 63 kVA , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
2175
2175
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV/433V, 63kVA, 3 Phase, 50 Cys Distribution Transformer BEE-5 Star Rated with Oil , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
377120
377120
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,5KN, composite / Polymeric pin insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
3
221
663
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers without braces-MS (for 8 Mtr PSC/PCC Pole), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
557
1114
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Spiral Earth Electrode, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
318
636
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV,45KN, Polymer insulator / silicon rubber composite insulator, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
3
202
606
... More
As per HESCOM rates - PART-A For EXTENSION OF HT 11KV LINE MATERIALS, supplying and fixing RCC Poles for 9Mtr Long. 145kg WL , , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
8494
8494
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : 1.1KV Ceramic Pin Insulator With GI pin, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
4
65
260
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : L.T. 4-Pin "X" arm with pole clamp, bolts, nuts and washers 8 Mtr RCC Pole, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
561
561
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : No. 8KV Strain Insulator, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
8
25
200
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: PSC Poles for 8 Mtr. Long, 140kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
4650
9300
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : PSC Poles for 11 Mtr. Long, 365 kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
9838
19676
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Weasel ACSR Conductor With @ 1.5% sag, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
0.325
39438
12817.35
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: 11kV Lightning Arester, Metal Oxide 9kV, 5kA Polymetic Type with ground disconnector , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
1826
1826
... More
As per HESCOM rates - Supervisor charges as applicable
1
34666
34666
... More
As per HESCOM rates - Contingencies @ 2% on Total material & labour (1+2)
1
10719
10719.97
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Earthing materials pipe type for grounding with accessories as per Drawing No. BESCOM/GM/CP/15 & 34/ Dt: 24.10.07 , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
3
2458
7374
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: Guy set with No.15KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07 , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
1657
1657
... More
As per HESCOM rates - PART-A Erection of HT 11KV LINE MATERIALS: 11KV, 5KN composite / Polymeric Pin Insulator (24mm dia FP rod) , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
6
221
1326
... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : d) LT Electronic Tri-Vector Meter 5A, Class-0.5/1.0 accuracy , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
4110
4110
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: CAUTION /DANGER BOARD , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
207
207
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: DP Transformer structure using RCC Pole- 9 Mtr Long, 145 Kg WL , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
37758
37758
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Guy set with No.8KV strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07, including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
1627
1627
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Guy concreting in marshy area (providing cement concret 1;2:4 for anchor rod in marshy/black cotton soil 600*600450 mm), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
881
881
... More
As per HESCOM rates - PART-B Double pole distribution TRANSFORMER Structure MATERIALS: Anticlimbing device (12 mtr GI Barbed Wire)
2
125
250
... More
As per HESCOM rates - PART-b (i) SWITCH GEAR MATERIALS : b) LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT , including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
1
8305
8305
... More
As per HESCOM rates - Special locality Allowance @ 20% on labour charges
1
6150
6150.86
... More
As per HESCOM rates - PART-C erection of LT LINE MATERIALS : Pole concreting CC 1:2:4 (without coping) for 11 mtr PSCC POLE (650X500X2000), including Materials & Labour cost ,Complete with all lead & lifts as per direction of Engineer - in - Charge
2
3349
6698
... More
As per HESCOM rates - Security deposit
1
52920
52920
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements