Karnataka Neeravari Nigam Limited Tender

... More
The KNNL has issued a formal invitation for competitive bids for the Karnataka Neeravari Nigam Limited project, for Silt Removal From Km. 20.00 To 28.00 & Improvements To Old Acqueduct At Ch 4.551 Of Rbc Under Bnt Project in Dharwad, Karnataka, with an estimated contract value of Rs. 11,85,978. The bid opening date for this tender is 25-11-2024 and the last date for bid submission is 02-12-2024. Interested bidders for Karnataka Neeravari Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Karnataka Neeravari Nigam Limited - KNNL Tender

Works
Civil And Construction
Excavation
Opening Date25 Nov 2024
Closing DateCancelled
Tender Amount₹ 11,85,978.74 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
003 - Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from borrow area including cost of all materials, labour, machinery, spreading soil in layers of thickness not more than 150 mm, breaking clods, levelling, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile and all other ancillary operations complete. (CSR 2023-24 Vol-4 Part-1 I.No.3.20 Page No.50)

23.52

761

17904.6

... More
009 - Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete. (CSR 2023-24 Vol-4 I.No.8.24.2 Page No.104)

27.6

373

10316.88

... More
005 - Providing and laying insitu vibrated M-20 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, supports, placing in position, levelling, vibrating, finishing junction of bed and sidesto required curvature, finishing side slopes, curing with all other ancillary operations complete. (CSR 2023-24 Vol-4 Part-1 I.No.3.26.2 Page No.51)

2.66

9509

25296.201

... More
004 - Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. (CSR 2023-24 Vol-4 Part-1 I.No.3.27 Page No.51)

3.45

6369

21974.085

... More
010 - Providing and constructing 300 mm thick rubble stone pitching set in CM 1: 5 proportion by volume with pin headers at 2 per m2 including cost of all materials from approved source, labour, packing stone chips and mortar into joints, finishing, curing and all other ancillary operations complete. (CSR 2023-24 Vol-4 I.No.3.43 Page No.54)

37.8

1000

37824.57

... More
001 - De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification (WRD CSR 2023-24 Vol-4 Part-2 I.No.3.13 Page No.140)

8637

98

852471.9

... More
006 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (CSR 2023-24 Vol-1 I.No.1.14.1 Page No.8)

75

107

8032.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.