Hindustan Aeronautics Limited Tender
... More
The HAL has issued a formal invitation for competitive bids for the Hindustan Aeronautics Limited project, for Civil Works Pertaining To Maintenance Contract Of Etb At Iaf Bidar in Bidar, Karnataka, with an estimated contract value of Rs. 14,13,000. The bid opening date for this tender is 23-03-2019 and the last date for bid submission is 24-04-2019. Interested bidders for Hindustan Aeronautics Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 14,130Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
AE1830151008/9/18-19-AE1830151008Tender No
AE1830151008/9/18-19-AE1830151008Tender Authority
Hindustan Aeronautics Limited ViewPurchaser Address
-Website
http://https://hal-india.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Painting New / old plaster external surfaces of walls and chajjas at all levels with two coats of Pidilite Rain coat / Asian APEX Weather Proof Exterior emulsion / approved equivalent exterior emulsion paint of coat of approved colour with water base. The paint shall have anti algal, anti fungal UV resistant, Low VOC qualities with acrylic emulsion with silicon or elastromeric additives over a coat of approved primer including preparing the surface and filling the cracks with rich mortar of cement etc including scaffolding, tools all complete as directed by Engineer-in Charge and as per Manufacturers specifications.
1550
-
-
... More
CIVIL WORKS
-
-
-
... More
Painting the surface of walls with two coats of water proof cement paint and one coat of primer of approved colour and manufacture at all levels confirming to IS 5410 including preparation of surface, curing and mixing cement paint to water as per manufacturers specification applying with in an hour of mixing washing down the surface with water before painting, scaffolding curing for two days after application of final coat etc., all complete as directed by Engineer-in-charge.
2000
-
-
... More
For Ceiling
1000
-
-
... More
EARTH WORK EXCAVATION: Excavation over areas (hard/dense soil) not exceeding 1.5mts depth for foundation / roads etc., and getting out upto a distance of 50mts outside the periphery of the area cleared, etc., complete as directed by the Engineer-in-charge.
5
-
-
... More
Painting two coats of oil bound washable distemper of approved manufacture and shade to newly plastered interior surface of walls and ceiling as directed conforming to IS 428 applied evenly to give a uniform finish over and with a coat of approved primer including cleaning the dirt and other impurities, rubbing with sand paper of zero size, scrapping smooth and filling crevices, necessary scaffolding, drying each coat and finishing as per specification, etc., as specified complete at all levels.
2000
-
-
... More
For walls
-
-
-
... More
DEMOLITION: Demolition of concrete of any description and in any position not otherwise specifically provided for and conveying debris away from the site as directed by the Engineer-in-charge.
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements