The GAIL Gas Limited has issued a formal invitation for competitive bids for Hiring Contract For Rerouting Of Mdpe Pipeline As Per The Requirement Of Various Onm Bases Of Gail Gas Bengaluru Ga On Arc Basis in Bengaluru Urban, Karnataka. The bid opening date for this tender is 02-05-2025 and the last date for bid submission is 29-05-2025. Interested bidders for GAIL Gas Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

GAIL Gas Limited Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date2 May 2025
Closing Date29 May 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Hiring Contract For Rerouting Of Mdpe Pipeline As Per The Requirement Of Various Onm Bases Of Gail Gas Bengaluru Ga On Arc Basis

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Inspection of chambers, preparation of joint report as per the instruction of EIC/ GAIL Gas representative.

-

-

-

... More
Preparation of action plan for rerouting. Preparation of application for applying for permission for rerouting.

-

-

-

... More
Carrying out Liasioning & coordination for getting the inspection of the Sewer/ Sanitary Chamber etc. Job to be carried out as per detailed SCC & SOW. Payment shall be done per chamber basis. Job to be executed only after clearance of GAIL Gas Limited.

1500

-

-

... More
Inspection of Sewer chamber/ Sanitary chambers. Job to be carried out as per detailed SCC & SOW. Job to be executed only after clearance of GAIL Gas Limited.

1500

-

-

... More
Providing Supervisory Services of Highly Skilled Resource, Resource shall be equiped with two wheeler along with fuel (CNG Bike/Scooter) for day to day cordination with GAIL Gas's Representative and for Liasoning with State Authorities/Utilities and other Departments.

12

-

-

... More
MDPE PIPELINE FOR REROUTING: Laying/ rerouting of MDPE Pipeline of PE100 grade with SDR 11 of sizes 20mm, 32mm, 63mm, 90mm & 125 mm upto a length of 10m in Bengaluru Geographical Area (GA) for MDPE pipeline rerouting. Each rerouting from one end to other shall be considered for certification of connectivity payment under this SOR item. The following works are also included in the scope of this item, but not limited to:

-

-

-

... More
Loading, Shifting, Unloading of MDPE pipes issued by GGL as free issue material from GGL designated storeyard within Bengaluru GA limit but upto maximum 100 Km radius and stacking as per requirement at working site/contractor's stock yard.

-

-

-

... More
The depth of trench should meet to ensure minimum 1000 mm cover from top of the pipeline to natural ground level at that location.

-

-

-

... More
Trenching of the required width and depth in all kinds of soil, asphalt roads, concrete pavements/roads, all kind of pathways or laying of PE pipes of sizes 20 mm, 32mm, 63mm, 90mm, 125mm for maximum length upto 10m from start point of rerouting to end point of rerouting including crossing of MDPE pipes below the drains as required depending on the drain depth but not less than 1000 mm cover from drain bottom slab.

-

-

-

... More
Alternatively, as per site conditions, if drain crossing from bolttom of the drain is not feasible with cover of 1000mm from drain bottom, then drain crossing can be carried out by supplying and provding GI sleeve (40 mm GI sleeve for 20 mm PE pipe, 50 mm GI sleeve for 32 mm PE Pipe, 100mm GI sleeve for 63mm PE pipe) across the drain width. Further, as per site condition crossing of MDPE pipeline below drain not feasible then, MDPE pipeline will be crossed as per the drawing No. MEC/23VT/01/31/T4/PE/LY/024/R0/A2.

-

-

-

... More
Supply and fixing all kind of fittings/accessories as required on new PE pipeline, charged, uncharged existing pipeline network, or any other fittings required to make compelete pipeline work

-

-

-

... More
Item also includes dewatering from the trench before/after laying of the pipes if required without creating any problems to the surrounding areas.

-

-

-

... More
Preparation of the route and connectivity planning drgs for individual rerouting.

-

-

-

... More
During the execution of the work, construction area need to be barricaded to ensure proper safety. Proper hard barricades / tapes/ reflectors as required to be installed at site as per Instruction of EIC/ site Engineer/ authorities.

-

-

-

... More
After laying of Pipeline, back filling with available soft soil upto depth of minimum 300mm, dressing the backfilled and compacted soil and backfilling & compaction of remaining trench depth with available soil.

-

-

-

... More
Carrying out all works required to make the PE pipeline ready for commissioning /Gas-In as per specification. Commissioning the pipeline as per specification & approved procedure , providing tools & tackles, instruments, manpower and other accessories as per instructions of Engineer - In -Charge.

-

-

-

... More
Final clean-up of construction area used for laying of pipeline works including disposal of debris and surplus material to designated disposal areas.(which is to be identified by the contractor)

-

-

-

... More
Handing over the completed connectivity to GAIL Gas Ltd. and submisssion of As-built Drgs/ report and other related documents as per contract.

-

-

-

... More
Restoration of the pits and all kind of surfaces (RCC/PCC Concrete/Asphalted/Tiled/Paver) upto 10 m length to the original condition. Payment of restoraton shall be done saperately in SOR No. 4.0

-

-

-

... More
charges for Hookup with charged network shall be paid extra as per SOR#2.3

-

-

-

... More
Cutting of Asphalt/concrete Road top for trenching: Top layer of asphalt/ Concrete shall be cut open by employing mechanized saw/cutters for maintaining straight line for excavting Entry and Exit pits.

-

-

-

... More
The above item includes liaisoning with concerned land owning authorities- state authorities / owners / (i.e BBMP/ BDA/ KIADB/BMRCL/KHB/GRAMPANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA (Resident Welfare Association)/society/individual land owners etc.) & also all other associated liaisoning work as required for smooth execution of pipeline laying and making the last mile connectivity works complete from the nearest available mainline works with any authorities such as BBMP / BDA / BWSSB, local area representatives, traffic police, police, BESCOM, BSNL, BWSSB, BMRCL etc. and any other utility companies / agencies such OFC operator etc . Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by Builder/RWA/Owner/other utility agencies) is in scope of the contractor. Assisting BWSSB for restoring its damaged network network (due to GAIL Gas pipeline) and taking NOC from them. However, liasioning works for making rerouting shall be paid separately under SOR 2.3) After completion job contractor has to arrange joint site survey with concerned department (BWSSB etc.) and shall take NOC.

-

-

-

... More
Note: 1) Road crossing width is excluded in the 10 m laying length limit for the item 2.1 by mechanical excavator /Manual moiling/machine moling /HDD or mannually depending upon the site condition.

-

-

-

... More
MDPE PIPELINE REROUTING UPTO 10M LENGTH

-

-

-

... More
20/32 mm PE 100 pipe

100

-

-

... More
63 mm PE 100 pipe

100

-

-

... More
90 mm PE 100 pipe

60

-

-

... More
125 mm PE 100 pipe

40

-

-

... More
Liasioning works for carrying out rerouting for SOR item 2.1 Liaisoning with concerned land owning authorities- state authorities / owners / ( i,e BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA (resident welfare association)/society/individual land owners etc..) & also all other associated liaisoning work as required for smooth execution of pipeline laying and making the last mile connectivity works complete from the nearest available mainline works with any authorities such as BBMP / BDA / BWSSB, local area representatives, traffic police, police, BESCOM, BSNL, BWSSB, BMRCL etc. and any other utility companies / agencies such OFC operator etc . Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by Builder/RWA/Owner/other utility agencies) is in scope of the contractor. Note: 1)This item is payable only for laying of PE pipeline outside only. The item is not applicable for laying inside apartments, Gated communities, societies etc., 2) In principle permission for laying of the pipeline from the concerned land owning authority ( i,e BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/BUILDER/ RWA etc.) shall be obtained by GGL.

300

-

-

... More
HOOK UP of rerouted pipeline with charged network. Each connection with charged/ existing network shall be counted as one hookup.

-

-

-

... More
20/32 mm PE 100 pipe

200

-

-

... More
63 mm PE 100 pipe

200

-

-

... More
90 mm PE 100 pipe

120

-

-

... More
125 mm PE 100 pipe

80

-

-

... More
Rerouting above 10m (SOR 2.1) using mechanical excavator /Moling machine/HDD or mannually depending upon the site condition:Rerouting of MDPE Pipeline over and above item 2.1 for carrying out MDPE rerouting as per item 2.1 20 mm /32 mm/63 mm/ 90mm/ 125mm PE 100 pipe

-

-

-

... More
Note: 1). Restoration of Molling/HDD pits on Asphalt road shall be carried out as per requirement of Local authoritity/BBMP/BDA/KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS etc. Also Refer Drg. No. MEC/23VT/01/11/D2/ST/LY/0211A/R00/A3 for pit restoration. 2). Cutting of Asphalt/concrete Road top For pits: Top layer of asphalt/ Concrete shall be cut open by employing mechanized saw/cutters for maintaining straight line for excavating Entry and Exit pits. 3) Restoration of entry/exit pit shall be carried out by filling the bottom layer with stone grit, followed by 200mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. BM & 25mm thk. Premix carpeting matching with the existing road top level. Payment for restoration shall be paid separately under SOR No.4.0

-

-

-

... More
20/32 mm PE 100 pipe

250

-

-

... More
63 mm PE 100 pipe

375

-

-

... More
90 mm PE 100 pipe

375

-

-

... More
125 mm PE 100 pipe

250

-

-

... More
Liasioning works for carrying out rerouting for SOR item 2.3 Liaisoning with concerned land owning authorities- state authorities / owners / ( i,e BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA (resident welfare association)/society/individual land owners etc..) & also all other associated liaisoning work as required for smooth execution of pipeline laying and making the last mile connectivity works complete from the nearest available mainline works with any authorities such as BBMP / BDA / BWSSB, local area representatives, traffic police, police, BESCOM, BSNL, BWSSB, BMRCL etc. and any other utility companies / agencies such OFC operator etc . Repairing/replacement of all damaged utilities if any, and payment of any compensation (if claimed by Builder/RWA/Owner/other utility agencies) is in scope of the contractor. Note: 1)This item is payable only for laying of PE pipeline outside only. The item is not applicable for laying inside apartments, Gated communities, societies etc., 2) In principle permission for laying of the pipeline from the concerned land owning authority ( i,e BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/BUILDER/ RWA etc.) shall be obtained by GGL.

1250

-

-

... More
Excavation of pit beyond 1.5 m depth for carrying out item 2.0 for rerouting.

12.5

-

-

... More
Restoration of asphalted roads / concrete roads / pavements / foot paths

-

-

-

... More
Asphalt road: Restoration of bitumen Asphalt road after laying of pipeline as per the drawing no. MEC/23VT/01/11/D2/ST/LY/0211/R00/A3 , specifications and instruction of Engineer-In-Charge. Restoration of roads shall be done as per requirement of BBMP/ BDA/ KIADB/BMRCL/KHB/GRAM PANCHAYAT/PWD/LOCAL ASSOCIATIONS & BODIES, BUILDER, RWA and to get NOC from the concerned authorities. Restoration of the asphalt road cut portion for pipeline trench width shall be carried out by filling the bottom layer with good earth/Soil filling followed by 225mm thk. GSB & 250mm thk. WMM with top bituminous layers comprising of 50mm thk. DBM & 40mm thk. BC matching with the existing road top level. This item also includes disposal of surplus soil /debris with all lift & leads, cutting of Top layer of asphalt road by mechanized saw/cutters for maintaining straight line.

500

-

-

... More
Restroration of the all kind of pathway: Restoration by using excavated material such as tiles/pavers/granite/red stone etc by providing PCC 1:4:8 of 50mm thickness below after compaction of the filled soil, fixing the Tiles/Paver blocks/Granite etc and matching it to the existing surface. Item includes providing of extra finished material if required.such as Tiles/Paver blocks/Granite etc matching to original pathways. The area restored shall be measured in Sqm.

250

-

-

... More
Reinforced Concrete road/ Reinforced Concrete pavement: Restroration of reinforced concrete road and pavements shall be done by providing PCC 1:4:8 of 75 mm thick and RCC 1:2:4 of 100 mm thickness and providing 8 mm dia rod at 200 mm C/C. The cost of Shuttering, compacting the base surface etc.. are in the scope of this item. The area restored shall be measured in Sqm.

250

-

-

... More
Supply and installation of PE Isolation Valves: Supply of isolation valves (As per data sheet/Approved make) and installation of valves in the valve pits as per drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately.

-

-

-

... More
PE Valve, 32 mm dia

7

-

-

... More
PE Valve, 63 mm dia

5

-

-

... More
PE Valve, 90 mm dia

5

-

-

... More
PE Valve, 125 mm dia

5

-

-

... More
Construction of RCC valve pit having Internal size of Min. 600 x 600 mm Note: 1) The decision regarding type of valve pit i.e. Pre cast RCC Valve pit or CC Brick valve pit to be constructed at various locations shall be made by Engineer In Charge. 2) The top cover of Valve pit shall be matched with existing road top level. 3) RCC cover of valve chamber should be engraved with “GAIL GAS “. Metallic cover of Valve chamber valve chamber should be painted with “GAIL GAS. Also, Refer clause 21 of Particular Job specification for details. Pre-cast RCC valve pit: Construction of pre -cast RCC Valve pit as per the enclosed drawing nos. MEC/23RT/01/31/D4/PE/LY/325/R00/A3. The item includes supply of all the material including Pre-cast RCC valve chamber, Pre cast cover, excavation, PCC, cement grouting, backfilling, compaction, erection & installation of valve chamber etc. including all machinery, equipment & labour etc. as per the drg., specification and instruction of EIC.

22

-

-

... More
RCC Route Markers: Supply, fabrication and installation of RCC route markers as per the attached drawing no. MEC/23VT/01/31/T4/PE/LY/020/R0/A3, along the route including transportations of Markers. Item also includes excavation of pit in all type of soil, Concrete Grouting of Marker as per drawing and removing of debris from site all compelete. The location of RCC route markers shall be decided near electrical poles, trees etc, and RCC markers will not create hinderance to public & vehicular movements

250

-

-

... More
REPAIR OF DAMAGED SEWER/ SANITARY CHAMBER, LINES ETC.

-

-

-

... More
REPAIR OF DAMAGED CHAMBERS, LINES, ETC. BY PLAIN CEMENT CONCRETE (1:2:4): Supplying and carryingout plain cement concrete (1:2:4) with stone aggregate 20mm down grade (including shuttering if required) for repair of damaged Sewer chambers, lines etc. by PCC as per BWSSB or concerned department standards.

12

-

-

... More
Demolation/ Construction of RCC Chamber as per BWSSB/ other concerned department standards.

-

-

-

... More
Demolition of existing Sewer Chamber

13

-

-

... More
Construction of RCC Sewer chamber/ Supply & installation of Pre-cast sewer chamber with cover as per BWSSB/ other concerned department standards. (Inner Dia from 1000mm to 1500mm, wall thickness 125mm to 200mm) sample drawing attached.

-

-

-

... More
Height upto 1mt

5

-

-

... More
Height from 1mts to 2 mts

5

-

-

... More
Height From 2 mts to 3 mts

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.