Forest Department Tender
... More
The Forest Department has issued a formal invitation for competitive bids for Construction Of Barbedwire Fencing With Rcc Pillars 720 Mtr At Nagaravan Badami Range Badami in Bagalkot, Karnataka, with an estimated contract value of Rs. 6,48,000. The bid opening date for this tender is 21-12-2024 and the last date for bid submission is 05-01-2025. Interested bidders for Forest Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 16,200Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KFD/2024-25/OW/WORK_INDENT15716Tender No
KFD/2024-25/OW/WORK_INDENT15716Tender Authority
Forest Department ViewPurchaser Address
-Website
http://www.mstcindia.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Technical Information / Worksheet
BOQ Items
... More
Pwd - Miscellaneous & rounding off
1
217
217.28
... More
008 - Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. [PWD-CSR-2023-24, VOL-2, Page No:95 , It.No:11.57.1 ]
3600
20
72576
... More
001 - Clearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness By Manual Means In area of light jungle [PWD-CSR-2023-24, VOL-3, Page No: 9, It.No: 2.4 (i) a ]
1728
12
21720.96
... More
003 - PCC M-7.5 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates [PWD CSR 2023- 24, Vol-1, Pg.No.-15, It.No.-2.1.1]
2.81
6343
17825.7408
... More
002 - Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.In all kinds of soils Depth upto 1.5 m [PWD CSR 2023-24, Vol-1, Pg.No.-5 , It.No.-1.4.1]
16.85
271
4567.024
... More
PWD - Technically Scrutiny charges
1
2710
2710.06
... More
PWD - Estimate Preparation & Consulting Charges
1
5420
5420.11
... More
004 - RCC M-20 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates [PWD-CSR-2023-24, VOL-1, Page No:15 , It.No:2.2.1]
14.4
7041
101396.736
... More
006 - TMT Supplying, fitting and placing TMT FE 550 / 550 D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings [PWD-CSR-2023-24, VOL-1, Page No:18 , It.No:2.11.a]
2.006
100191
200984.83104
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements