Rural Water Supply And Sanitation Department Tender

Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Rural Water Supply And Sanitation Department - RWSS Tender

Civil And Construction
Building Construction
Opening Date17 Jun 2022
Closing Date27 Jun 2022
Tender Amount₹ 1,79,25,271 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the following classification. Cutting Macadam Road Surface etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

5.1

-

1852.83

... More
Supplying, laying, jointing , testing and commissioning of G.I. Pipes conforming to IS 1239:1990 with latest amendments, including fixing Collars, Elbows, Tees, bends, Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot, including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

40

-

19992

... More
Provinding and laying in reinforced cement concrete pipe NP2 for culverts including pointing ends , and fixing collars with cement mortor 1:2 including cost of all materials, labour, curing complete as per specification. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

15

-

6158.25

... More
Supplying HDPE pipes PE100 PN 6.0 / 6 Kg/cm2 conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used. 63 mm etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1039

-

141823.5

... More
Supplying HDPE pipes PE100 PN 6.0 / 6 Kg/cm2 conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used. 75 mm etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

960

-

163296

... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) Same as Earth Excavation Quantity etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

256.75

-

27780.35

... More
Restoration Of Road :- Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

17.29

-

98597.09

... More
Supply and delivery of Resilient seated soft sealing Sluice Valves PE-10 with body, bonnet of Ductile Iron of grade GGG50, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163-89/IS 14846-2000/ DIN 3202 F4/F5. The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings). All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage. The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work 80 mm

4

-

34208

... More
Supplying and fixing of fixed height surface box H-4057 MD-KU with PP 40% GF Lid, Housing of PA+, Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2-70 for service connection valves, design derived from DIN 4057, Should be supplied with support tile I (FSL, FSS, SI) should be able to recieve class AA traffic loads. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

4

-

11487.2

... More
New FHTC Connection :- Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the following classification. Cutting in Cement Concrete Road Surface etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

4.47

-

5191.01

... More
Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2.00 mtrs. Including shoring and strutting, danger lighting and using sight rails and boning rods at every 100 mtrs. Wherever necessary as directed in the following strata. (Manual Means) Ordinary Soil etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

19.93

-

5482.74

... More
Providing house Sevice Connection (single service connection) from distribution main including supply and fixing of Electro fusio Tapping Tee (saddle) of PE 100,SDR 11 of approved make (kimplast / grorg fischer / equivalent) along with fittings namely pin terminal of diameter compaitable to the diameter of HDPE distribution main , 120 mm along with 15 m dia outlets matching with the diameter of distribution main.The Electro Fusion Tappng Tee will be provided witha threaded brass flow regulator with cutting edge as shown n drawing and fusion joint in such a manner than the 15 mm dia outlet is perpendicular to the axis of pipe line from 15 mm outlet, 15 mm dia electro fusion coupler & also providing & fixing 15 mm dia Gi pipe with Compression / female jonts PN 16 & valve Hoad (PE material) for 15 mm da valve shall be provided. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

14885.64

... More
Providing and fixing to wall, ceiling and floor, medium density polyethylene pipes 6.00 kgs/sq.cm working pressure 20mm outside diameter with special flange, compression type fitings, wall clips, making good the wall, ceiling and floor including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. for internal water supply connection 20mm

92

-

10336.2

... More
Providing and fixing to wall, ceiling and floor, medium density polyethylene pipes 6.00 kgs/sq.cm working pressure 20mm outside diameter with special flange, compression type fitings, wall clips, making good the wall, ceiling and floor including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. for internal water supply connection 20mm

50

-

5617.5

... More
PP Make female Threaded Elbow with SS304/ Brass/ Plastic inserts suitable for Pressure rating PN16(FTE 90 deg) 20x15mm(1/2Inch). 20x20 mm dia elbow etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

99

-

9900

... More
Providing wrought mild steel (galvanized) 15 mm dia GI collar confirming to IS 1239-II, 1991 with latest amendments if any. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

2145

... More
Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI elbow confirming to IS 1239-II, 1991 with latest amendments if any. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

231

-

15015

... More
Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI union confirming to IS 1239-II, 1991 with latest amendments if any. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

66

-

5610

... More
Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI bend confirming to IS 1239-II, 1991 with latest amendments if any. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

66

-

5280

... More
Supplying, laying, jointing , testing and commissioning of G.I. Pipes conforming to IS 1239:1990 with latest amendments, including fixing Collars, Elbows, Tees, bends, Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot, including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) 20 mm dia etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

66

-

10256.4

... More
Providing and fixing water meter with stop cock, jam nut socket in GI pipe line including cutting and threading the pipe and making long screw includeing cost of materila, labour. Nom and Testing complete as per specification etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

45738

... More
Providing and fixing in position brass bib cock of approved quality 15mm nominal bore including cost of all materials, labour, HOM of equipments and testing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

5994.45

... More
Supply and fixing of HDPE water meter box to protect the water meter of class 'B: multijet type of size 15 to 32mm including HDPE box with base dia 300mmxlid dia 200mmxheight 250mm with openable lid and the cover is buried below GL with lid flush with GL including earthwork excavation for 600mmx600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC 1:2:4 using 12 to 20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height,disposal of excess earth with all lead and lifts etc complete as per drawing enclosed etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

17325

... More
Restoration Of Road :- Providing and laying in position plain cement concrete of mix M 20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

6.54

-

37294.68

... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) Note: Add Rs. 203.00 / cum for earth obtained from borrow pits. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

19.93

-

2155.43

... More
Providing, & fixing Flow control valve using food grade materials SS316 ball/1/2"(15 mm) including cost of all materials,labour charges,HOM and testing complete as per of following specification.The FCV nominal design is for 5Ltr/Min Discharges the range of 7 Lit/min at 1 bar or more pressure loss and should not exceed the flow the range of 7 Lit /Min at 1 bar or more pressure.MOC of valve-Food grade stainless steel SS*316.MOC of Ball:stainless steel-316.Flow direction arrow embossed on its outside surface.The Valve should act as flow control valve and non return valve. Minimum operating pressure-0.1 kgf(10 cm head).Designed pressure:1 meter to 50 meters. accuracy of valves:+20 % of average flow rate. Orifice size:not less than 12 mm.weight of FCV: not less than 12 mm.Weight of FCV:not less than 125 gms.Length:not be less than 70 mm The FCV is with internal arrangements of very simple passage in line such that the valve will pass the small floating particles if any entered in the valve to avoid choking The FCV shall be got tested from FCRI by the manufacturer as per above standards,the quantum of checking to be done from FCRI is attached here with.The FCV should be fitted on Saddle,which is fixed on distribution pipeline. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

10903.2

... More
Providing and Filling infoundation with granite/trapbroke nmetal 100mm. And down size, with approved sand including hand packing, ramming,watering,including cost of all materials and labour with all lead and lift. complete as perspecifications etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1.49

-

2889.63

... More
Supply and fixing R.C.C Demecration stones of 30cms x 15 cms, and 90 cms. Deep using 1:2:4 c.c and 6 mm dia rods for vertical and stirrups and rendered smooth,including engraving letters "KWB and Arrow" 6mm deep on the top including fixing demecration stones 45 cms below ground level and in CC 1:3:6, 15 cms.Height, with 8cms Offset around the stone and curing for 10 days including earthwork excavaton in all tyos of soil with all lead and lift. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

33

-

15246

... More
Painting two coats on new concrete surface :Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, with materials, labour complete as per specifications. MORTH etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

17.82

-

1534.3

... More
Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications. (“i) Hindi ( Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

2640

-

2772

... More
Providing and fixing RCC name board of size 1.35X0.6X0.04 Mtrs fixed in reinforced cement concrete poles of size 0.10X0.10X2.60 mtrs in cement concrete M 20 proportion using 20mm and down size graded metal machine mixed with 10mm dia main steel bars and 8mm dia stirups. The board shall be procided with 12mm thick cementplaster in cement mortar 1:3 on both the sides. The poles shall be embedded in the ground for a depth of 0.5 mtrs with cement conctete M10 proportion. The board shall be fixed as per the drawing and at the place indicated by the Engineer incharge of the work. The cost includes excavation, bare cost of all materials, cost of steel. centring, transportation charges, fixing charges, labour, HOM etc., The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1

-

5775

... More
Providing Raisin Main :-Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2.00 mtrs. Including shoring and strutting, danger lighting and using sight rails and boning rods at every 100 mtrs. Wherever necessary as directed in the following strata. (Manual Means).a) In Ordinary soil etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

39.6

-

10890

... More
Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2.00 mtrs. Including shoring and strutting, danger lighting and using sight rails and boning rods at every 100 mtrs. Wherever necessary as directed in the following strata. (Manual Means).b) In hard soli etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

79.2

-

21780

... More
Providing murrum or gravel bedding for the pipeline including watering and consolidation by punners etc. complete with all lead and lift. (in black cotton soil and rock reaches). etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

13.2

-

3590.4

... More
Supplying HDPE pipes PE80 PN 6.0 / 6 Kg/cm2 conforming to IS 4984:1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling, lowering into trenches, laying true to line and jointing of pipes and specials by electrofusion welding, as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc., complete giving hydraulic test as per relevant IS Specification with all lead and lift including , testing and commissioning. The rate is exclusive of required specials and fittings etc., complete (Contractor will make his own arrangement for procuring water for testing)Upto 110mm dia,Coils shall be used. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

220

-

41360

... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering,Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

105.6

-

11404.8

... More
Supplying,laying,jointing ,testing and commissioning of G.I. Pipes conforming to IS 1239:1990 with latest amendments, including fixing Collars, Elbows, Tees, bends, Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot, including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water :Class-C (HEAVY) for testing) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

60

-

35700

... More
Providing 80 mm dia Air valve confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any 100 mm dia etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1

-

3150

... More
Supply of bolt and nut with washers etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

5.6

-

443.46

... More
Supply of rubber insertion sheet (3 mm) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1.2

-

120

... More
Bulkflow Meter with Valve Chamber :- Earthwork in surface excavation in ordinary soil for levelling and lowering the ground manually (other than foundation of buildings, culverts, road drains and trenches of pipe lines and cables) and removing the excavated stuff to a distance not exceeding 50m and lift upto 1.5m, excavated surface levelled and neatly dressed, disposed earth to be levelled after breaking of clods and neatly dressed as per specifications.etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

5.29

-

1383.07

... More
Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 20mm and down size graded granite metal coarse aggregates @0.84cum and fine aggregtes @ 0.56cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick,well compacted, in foundation,plinth and cills, ncluding cost of all materials, labour, HOM of machinery, curing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

0.66

-

3752.76

... More
Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6, edges of stones chistle dressed in courses not less than 15 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

2.75

-

16917.86

... More
Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

0.08

-

456.2

... More
Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

4

-

875.08

... More
Providing and laying Reinforced cement concrete of mix design of M-20 Grade with cement @ 320 kg, 20mm and graded granite or trap or basalt jelly of approved quality @ 0.69 cum and fine aggregates @ 0.46 cum, super plasticiser @ 3lts confirming to IS-9103-1999 reaffirmed 2008 machine mixing,laid in layers of not more than 15 cms thick, well consolidated including centering, formwork, vibrating, curing, smooth finishing to the required plumb and face in C.M.1:3 proportion wherever necessary as per design and specifications etc., complete for RCC roof slab,top dome,ring beam of all spans (exclusive cost of steel and fabrication charges) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

0.2

-

1977.36

... More
Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

0.05

-

3749.6

... More
Providing and fixing 60x60cms M.S inspection door with necessary M.Sframe made out ofM.S.angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1

-

1908.9

... More
Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

0.84

-

90.85

... More
Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of themeter shall be as per ISO 4064 class B specification. Dry dial excavated counter housingfully protected against flooding ensuring easy reading in all climates. etc., complete as per specification, design and drawings including cost of all material, labor charges and hire charges of machineries with all lead and lift as directed by the Engineer-in-charge of work

1

-

26807.55



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.