Directorate Of Municipal Administration Tender
... More
The DMA has issued a formal invitation for competitive bids for the Directorate Of Municipal Administration project, for Construction Of Compound Wall Front Side Of Tmc Kurugodu Office At Kurugodu Limits in Ballari, Karnataka, with an estimated contract value of Rs. 4,23,153. The bid opening date for this tender is 16-05-2025 and the last date for bid submission is 02-06-2025. Interested bidders for Directorate Of Municipal Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 10,579Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DMA/2025-26/BD/WORK_INDENT38827Tender No
DMA/2025-26/BD/WORK_INDENT38827Tender Authority
Directorate Of Municipal Administration ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
002 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. ( SR 2024-25 Volume-I Page No. 15 Item No. 2.1.2)
2.64
5947
15700.608
... More
013 - Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.PWD DSR 2023-24 Volume-I Page No. 9 Item No. 2.5.1
0.81
6961
5638.815
... More
007 - Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding PWD DSR 2023-24 Volume-II Page No. 86, Item No. 11.34A
1215
176
214326
... More
010 - Form work Foundation upto Plinth(Isolated)(PWD DSR 2021-22 Volume-I Page No. 111 Item No.1(a) 8% OF CONCRETE RATE)
0.38
168
63.897
... More
001 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m SR 2024-25 Volume-I Page No. 8 Item No. 1.14.1
11.38
107
1218.798
... More
008 - Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Vol II Building SR- 2023-24 Item No. 11.16.2 Page No. 82
539
154
83194.65
... More
003 - Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering,
including cost of all materials and labour with all lead and lift complete as per specifications vol 1 item no 1.23 pg no 54
5.94
2816
16727.634
... More
005 - Providing Raised and cut pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. SR 2024-25 Volume-II Page No. 44 Item No. 8.19.2
17.6
486
8556.24
... More
015 - Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (All other type of structures).PWD DSR 2023-24 Volume-I Page No. 18, Item No. 2.11h
0.2
82961
16592.31
... More
016 - Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD DSR 2024-25 Volume-II Page No. 48 Item No. 8.41
78
175
13677.3
... More
012 - Form work Foundation upto Column (PWD DSR 2021-22 Volume-I Page No. 111 Item No.2. 70% OF CONCRETE RATE)
1.08
4873
5262.894
... More
004 - Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand), SR 2024-25 Volume-II Page No. 9 Item No. 5.1.1
4.95
5891
29163.1725
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements