Directorate Of Municipal Administration Tender

... More
Karnataka, also known as Karunadu, is a state in the southwestern region of India. Karnataka was formed originally as Mysore State on 1st November 1956 and currently is the biggest state in south India. Its capital and largest city is Bengaluru. It covers an area of 191,791 km2 (74,051 sq mi) and is the sixth largest state by area comprising 31 districts. Karnataka is also a state of multiple languages; Kannada being the official and most widely spoken language in Karnataka. Other languages spoken in the state include Tamil, Telugu, Malayalam, Kodava, Konkani and much more.Karnataka tenders are issued by the government of Karnataka, public & private sector organisations. The state government issues majority of the Karnataka tenders, which are for goods and services including construction, road and bridge construction, IT services, engineering services, medical services, educational services amongst many others. Bidassist is one of the largest eprocurement portals, which offers all government tenders from across the world in one place. Bidassist offers information on all Karnataka tenders and other state and authority tenders in no time. Bidassist is a platform where users can look for various Karnataka tenders as well as other tenders.

Directorate Of Municipal Administration - DMA Tender

Civil And Construction
Drainage Work
Opening Date7 Jun 2022
Closing Date12 Jul 2022
Tender Amount₹ 1,08,05,509 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means. (PWD DSR 2021-22 Vol 3 P. No.29 It No. 5.1 A(i) )

1344

-

60910.08

... More
Bituminous Macadam Grading - II for traffic <20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG- 30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (PWD DSR 2021-22 Vol 3 P. No.30 It No. 5.8 A(ii)

67.2

-

545837.38

... More
Tack coat on Bituminous surface : Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (PWD DSR 2021-22 Vol 3 P. No. 29 It No. 5.3 A(i) )

1344

-

16611.84

... More
Semi Dense Bituminous Concrete : Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (PWD DSR 2021-22 Vol 3 P. No.145 It No. 21.A 1 )

33.6

-

366118.03

... More
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD DSR 2021-22 Vol 3 P. No. 15 It No. 3.6 )

291.2

-

123873.57

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes (PWD DSR 2021-22 Vol 3 P No.56 SL No 803 it No. 8.13 )

58

-

6989.58

... More
PQC : Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (PWD DSR 2021-22 Vol 3 P. No. 138 It No.20.29 )

235.2

-

1656304.27

... More
Providing and fixing displaying information such as name of work, tender cost, name of Contractor, Name of Engineer in- charge with mobile no, complettion and liability period etc., having rectangular shape of 1.20 m x 0.90m size made out of 1.25mm thick MS sheet painted with 1 coat of zinc chromate stoving primer and two coats of enemal paints on front side and grey stove enemal on back side and border/ messages /symbols etc., with approved colour, shade and paint complete on MS angle of size 35 x 35x 3mm frame with properly cross braced MS angles of 35 x 35 x3 mm duly painted including two MS angle iron post of size 65 x 65 x6 mm , 3.65mtr hight long painted with altrenate black and white bands of 25mm width including all fixtures etc., and fixing the board in PCC 1:4:8 concrete of block size 0.60 x 0.60 x0.75m including excavation, refilling, transportation and labour etc., complete specification No as directed by engineer- incharge & MORTH specification no 804 (PWD DSR 2021-22 Vol 3 P. No.151 It No. 4 )

5

-

46350

... More
Earth Work Excavation Mechanical :Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (PWD DSR 2021-22 Vol 1 P. No.8 It No. 1.14.1 )

1702.8

-

128033.53

... More
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD DSR 2021-22 Vol 3 P. No. 15 It No. 3.6 )

189.2

-

80483.79

... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (PWD DSR 2021-22 Vol 1 P. No.15 It No. 2.1.3 )

94.6

-

560463.38

... More
RCC (M20) Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub-structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 5% (PWD DSR 2021-22 Vol 1 P. No.16 It No. 2.4.2 )

303.59

-

1956236.81

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 5%

303.59

-

97810.63

... More
Filling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ram- ming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications

255.42

-

53668.85

... More
TMT Steel Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. (PWD DSR 2021-22 Vol 3 P. No.71 It No. 9.3 ) As per Govt Issure circular Order no:SEBC/Tech/Shedule of Rates/2022-23/138 date: 8/04/2022

17.49

-

1698696.14

... More
Earth Work Excavation Mechanical :Earth work excavation for Foundation by mechanical means for all works & depth up to 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift up to 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work (PWD DSR 2021-22 Vol 1 P. No.8 It No. 1.14 )

28.66

-

2154.95

... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (PWD DSR 2021-22 Vol 1 P. No.15 It No. 2.1.3 )

5.05

-

29919.03

... More
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates (PWD DSR 2021-22 Vol No I, P. No.15 It No. 2.2.1.1 )

8.59

-

55130.02

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 5%

8.59

-

2756.53

... More
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates (PWD DSR 2021-22 Vol No I, P. No. 17 It No.2.5.2 )

46.24

-

309195.78

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Beam form works consider 20%

9

-

12036.15

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Column form works consider 10%

3.76

-

2514.24

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Wall form works consider 8%

34.5

-

18455.43

... More
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.

305.04

-

63466.62

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For building & Other structure works consider 25%

305.04

-

15868.18

... More
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m� over and including priming coat of exterior primer applied @ 2.20 kg/10 m�) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD DSR 2021-22 Vol No 2, P. No.46 It No. 8.30)

305.04

-

42730

... More
Form Work As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Painting of building & Other structure works consider 25%

305.04

-

10682.5

... More
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a prim- ing coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.. (PWD DSR , 2021-2022, Volume -2 P. No.82 No. 11.25.2)

553.5

-

61571.34



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.