Directorate Of Municipal Administration Tender
... More
The DMA has issued a formal invitation for competitive bids for the Directorate Of Municipal Administration project, for Construction Of Shed At Graveyard Near Mirapurhatti New Highschool And Construction Of Compound Wall in Belagavi, Karnataka, with an estimated contract value of Rs. 3,49,507. The bid opening date for this tender is 14-02-2025 and the last date for bid submission is 28-02-2025. Interested bidders for Directorate Of Municipal Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Directorate Of Municipal Administration - DMA Tender
Opening Date14 Feb 2025
Closing Date28 Feb 2025
Tender Amount₹ 3,49,507.59
Costs
EMD
₹ 10,500Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DMA/2024-25/OW/WORK_INDENT35981Bid Award Id
ViewTender No
DMA/2024-25/OW/WORK_INDENT35981Tender Authority
Directorate Of Municipal Administration ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
code06 - Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Form Works Consider 50% for Plinth Beams PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2)
2.12
3319
7037.5096
... More
code14 - Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm(+ 0.05 %) totalcoatedthicknesswithzinccoating120 g/m2 as per IS: 277, in240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer in- charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPD Mseal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. (PWD SR /2023-24/V-2/P.No26 /I No 7.38) Rate 568.00+5%= 596.40
35.46
596
21148.344
... More
code01 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the Work PWD Common DSR 2023-24 Volume 1 (P No: 8 I.No:1.14.1) Rate 102.00+5%=107.10
22.671
107
2428.0641
... More
code09 - Providing Brick work with common burnt clay modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. PWD building DSR 2023-24 Volume 2 (P No: 13 I.No:6.4 )Rate 8611.00+5%=9041.55
4.47
9041
40415.7285
... More
code12 - Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thin able priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD building DSR 2023-24 Volume 2 (P No: 45 I.No:8.25 )Rate 137.00+5%=143.85
25.2
143
3625.02
... More
code05 - Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Form Works Consider 70% for Columns PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2)
1.26
4647
5855.7366
... More
code13 - Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes including cost of materials, labour, usage charges of machinery complete as per
specifications and as per directions of the Engineer-in-Charge. (PWD SR /2023-24/P. No 81 /V-2 /I No 11.16.3)Rate 122.00+5% = 128.10
856.87
128
109765.047
... More
code04 - Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Form Works Consider 8% for foundation up to plints i Isolated PWD Common DSR 2023-24 Volume 2 (P No: A-7 I.No:22.2)
1.43
531
759.5159
... More
code10 - Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. PWD building DSR 2023-24 Volume 2 (P No: 41 I.No:8.1.2 )Rate 241.00+5%=253.05
25.2
253
6376.86
... More
code11 - Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and othersimilar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
(PWD SR /2023-24/V-2/ P.No. 7/ It.No.1.9)Rate 266.00+5%=279.30
7.63
279
2131.059
... More
code02 - Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. M 10 Grade Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 15 I.No:2.1.3 )Rate 5989.00 +5%=6288.45
3.0149
6288
18959.047905
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements