Directorate Of Municipal Administration Tender
... More
The DMA has issued a formal invitation for competitive bids for the Directorate Of Municipal Administration project, for Package-3b-devlopment Of Road And Drain Works From Nagaraju House To Patanjali Yoga Mandir And Road Works From Tumkur Road To Kaluve And Deck Slab Near Shekar And Gajendra House And Construction Of Bus Stand In Ward No 13 Of Kunigal Town Municipal Council Limits. in Tumakuru, Karnataka, with an estimated contract value of Rs. 21,46,809. The bid opening date for this tender is 29-01-2025 and the last date for bid submission is 14-02-2025. Interested bidders for Directorate Of Municipal Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 26,875Document Cost
Refer DocumentsTender Fee
₹ 540
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
DMA/2024-25/RD/WORK_INDENT32661/CALL-2Bid Award Id
ViewTender No
DMA/2024-25/RD/WORK_INDENT32661/CALL-2Tender Authority
Directorate Of Municipal Administration ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
PWD CSR 2023-24, VOL-1, Page -15, Item No 2.1.3 - Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thick ness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appur tenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)
Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
7.335
6168
45247.19445
... More
PWD CSR 2023-24, VOL-1, Page No -8, Item No 1.14 - Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
62.3475
105
6550.22835
... More
PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 - Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
15.825
6512
103063.31925
... More
PWD CSR 2023-24, VOL-1, Page -7, Item No 1.9 - Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
7.71
273
2112.3858
... More
PWD SRRB 2023-24, VOL-3, Page -149, Item No16.28 - PQC
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,Mix laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
148.5
6956
1033058.07
... More
PWD SRRB 2023-24, VOL-3, Page -17, Item No 3.6 - Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
66
507
33514.14
... More
PWD CSR 2023-24, VOL-1, Page No -8, Item No 1.12 - Mechanical Means
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
198
97
19374.3
... More
PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 - Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
For Drain works consider 35% of item concrete rate ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
15.825
2279
36072.138
... More
PWD SRRB 2023-24, VOL-2, Page -13, Item No 6.2 - Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
1.018
8217
8365.25212
... More
PWD CSR 2023-24, VOL-1, Page No -7, Item No 1.8 - Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
99
488
48333.78
... More
PWD SRRB 2023-24, VOL-3, Page -15, Item No 3.1 - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work.
62.3475
87
5458.523625