Department Of Revenue Tender
... More
The Department Of Revenue has issued a formal invitation for competitive bids for Estimate For Arranging Power Supply To 70kw Commercial Installation For Kalyan Mantap Of Commissioner Ksdb Kudalasangam At B.bagewadi Town In B.bagewadi Section Of Basavan Bagewadi Sub Division. Under Self Executive Scheme. in Vijayapura, Karnataka, with an estimated contract value of Rs. 7,50,840. The bid opening date for this tender is 23-05-2025 and the last date for bid submission is 06-06-2025. Interested bidders for Department Of Revenue tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Department Of Revenue Tender
Energy, Oil and Gas
Electrical Goods and Equipments
Electrical and Electronics
Opening Date23 May 2025
Closing Date6 Jun 2025
Tender Amount₹ 7,50,840.27
Costs
EMD
₹ 19,000Document Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
KDSDB/2024-25/EL/WORK_INDENT2/CALL-4Tender No
KDSDB/2024-25/EL/WORK_INDENT2/CALL-4Tender Authority
Department Of Revenue ViewPurchaser Address
-Website
http://kppp.karnataka.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
051 - Swith gear B)Labour Cost
1
719
719
... More
046 - Swith gear i) A1 lead wire-120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.
45
180
8100
... More
002 - RCC Pole-9.0M Long 145 Kg WL (Hard Rock). As per the direction of Engineer-in-charge of work B)Labour Cost
2
3104
6208
... More
026 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work B)Labour Cost
13
61
793
... More
017 - Rabbit ACSR Conductor with 1.5% Sag. As per the direction of Engineer-in-charge of work A) Material Cost
1.705
61515
104883.075
... More
039 - concreting materials for guy set (without cement). As per the direction of Engineer-in-charge of work B)Labour Cost
4
200
800
... More
041 - Guy wire 7/10 SWG. As per the direction of Engineer-in-charge of work A) Material Cost.
10
80
800
... More
015 - Guy sets. As per the direction of Engineer-in-charge of work A) Material Cost
4
1209
4836
... More
024 - concreting materials for guy sets without cement. As per the direction of Engineer-in-charge of work B)Labour Cost
4
200
800
... More
059 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work B)Labour Cost
2
32
64
... More
032 - 45 KN Disc insulators. As per the direction of Engineer-in-charge of work A) Material Cost.
3
202
606
... More
056 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work. A) Material Cost.
1
146
146
... More
036 - 12 KV /433V, 100KVA, 3 phase 50 Cys Distribution Transformer BEE-5 Star Rated with oil off Load Tap. As per the direction of Engineer-in-charge of work B)Labour Cost
1
1151
1151
... More
010 - Horizontal cross arms with clamps, HT ST supports, bolts, nuts and washers (for RCC poles). As per the direction of Engineer-in-charge of work B) labour Cost
4
122
488
... More
029 - 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles). As per the direction of Engineer-in-charge of work A) Material Cost.
1
32553
32553
... More
034 - Guy sets . As per the direction of Engineer-in-charge of work B)Labour Cost
4
448
1792
... More
052 - 11 KV solid core type HG fuse unit. As per the direction of Engineer-in-charge of work. A) Material Cost.
1
1032
1032
... More
035 - 12 KV /433V, 100KVA, 3 phase 50 Cys Distribution Transformer BEE-5 Star Rated with oil off Load Tap. As per the direction of Engineer-in-charge of work A) Material Cost.
1
214306
214306
... More
005 - PSC pole-8.0 M Long for stud. As per the direction of Engineer-in-charge of work A) Material Cost
3
3578
10734
... More
037 - Earthing materials pipe type for grounding as per Drawing, No. BESCOM/GM/CP/15 & 34/Dt: . As per the direction of Engineer-in-charge of work A) Material Cost.
3
1733
5199
... More
003 - PSC Pole-9.0M Long 200 Kg WL (Hard Rock). As per the direction of Engineer-in-charge of work A) Material Cost
12
4276
51312
... More
058 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work. A) Material Cost.
2
93
186
... More
062 - TC Pencing . As per the direction of Engineer-in-charge of work B)Labour Cost
1
39999
39999
... More
044 - Swith gear a) LT Protectin kit for 100 kVA. As per the direction of Engineer-in-charge of work. A) Material Cost.
2
1915
3830
... More
057 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work B)Labour Cost
1
61
61
... More
018 - Rabbit ACSR Conductor with 1.5% Sag. As per the direction of Engineer-in-charge of work B)Labour Cost
1.705
3299
5624.795
... More
008 - Stud clamp. As per the direction of Engineer-in-charge of work B) Labour Cost
3
122
366
... More
016 - Guy sets. As per the direction of Engineer-in-charge of work B)Labour Cost
4
448
1792
... More
030 - 9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles). As per the direction of Engineer-in-charge of work B)Labour Cost
1
5205
5205
... More
040 - GI Wire 8 SWG. As per the direction of Engineer-in-charge of work A) Material Cost.
5
78
390
... More
033 - Guy sets . As per the direction of Engineer-in-charge of work A) Material Cost.
4
1209
4836
... More
047 - Swith gearii) Copper lugs-120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.
12
145
1740
... More
025 - Caution/Danger Board as per Drawing No. BESCOM/GM/CP/40/Dt: 24-10-07. As per the direction of Engineer-in-charge of work A) Material Cost
13
146
1898
... More
012 - Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers (for PSC poles). As per the direction of Engineer-in-charge of work B)Labour Cost
12
122
1464
... More
014 - 45 KN Ploymeric Disc insulators. As per the direction of Engineer-in-charge of work A) Material Cost
12
202
2424
... More
048 - Swith gear iii) PG clamps-Rabbit to 120 Sq mm. As per the direction of Engineer-in-charge of work. A) Material Cost.
4
309
1236
... More
006 - PSC pole-8.0 M Long for stud. As per the direction of Engineer-in-charge of work B)LabourCost
3
1072
3216
... More
038 - Earthing materials pipe type for grounding as per Drawing, No. BESCOM/GM/CP/15 & 34/Dt:. As per the direction of Engineer-in-charge of work B)Labour Cost
3
725
2175
... More
007 - Stud clamp. As per the direction of Engineer-in-charge of work B) Material Cost
3
435
1305
... More
061 - Three phase Four Wire 5-30A Thread trough type composite meter Housing Box with complete Set. As per the direction of Engineer-in-charge of work B)Labour Cost
1
1145
1145
... More
027 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work A) Material Cost
13
93
1209
... More
064 - 95 Sqmm, 4 Core Cable . As per the direction of Engineer-in-charge of work B)Labour Cost
0.2
23647
4729.4
... More
028 - Anti-Climbing Device (12mtrs/1 Kg G.I. Barbed wire) Lumpsum. As per the direction of Engineer-in-charge of work B)Labour Cost
13
32
416
... More
060 - Three phase Four Wire 5-30A Thread trough type composite meter Housing Box with complete Set. As per the direction of Engineer-in-charge of work. A) Material Cost.
1
19135
19135
... More
004 - PSC Pole-9.0M Long 200 Kg WL (Hard Rock). As per the direction of Engineer-in-charge of work B)labour Cost
12
3104
37248
... More
049 - Swith gear iv) Spacers for DTC wiring. As per the direction of Engineer-in-charge of work. A) Material Cost.
8
41
328
... More
022 - EG Stirrps with G.I. wire lacing. As per the direction of Engineer-in-charge of work A) Material Cost
14
287
4018
... More
020 - Spiral earth electrode. As per the direction of Engineer-in-charge of work A) Material Cost
14
248
3472
... More
013 - 11 KV Ploymeric Pin insulators. As per the direction of Engineer-in-charge of work A) Material Cost
39
221
8619
... More
063 - 95 Sqmm, 4 Core Cable. As per the direction of Engineer-in-charge of work. A) Material Cost.
0.2
514040
102808
... More
043 - 11 KV lightning Arrester, Metal oxide, 9 KV, 5 KA. As per the direction of Engineer-in-charge of work B)Labour Cost
1
90
90
... More
001 - RCC Pole-9.0M Long 145 Kg WL (Hard Rock). As per the direction of Engineer-in-charge of work A) Material Cost
2
7153
14306
... More
055 - 11 KV GOS 200 A single break. As per the direction of Engineer-in-charge of work B)Labour Cost
1
805
805
... More
009 - Horizontal cross arms with clamps, HT ST supports, bolts, nuts and washers (for RCC poles). As per the direction of Engineer-in-charge of work B) Material Cost
4
668
2672
... More
042 - 11 KV lightning Arrester, Metal oxide, 9 KV, 5 KA. As per the direction of Engineer-in-charge of work A) Material Cost.
1
1736
1736
... More
021 - Spiral earth electrode. As per the direction of Engineer-in-charge of work B)Labour Cost
14
70
980
... More
054 - 11 KV GOS 200 A single break. As per the direction of Engineer-in-charge of work. A) Material Cost.
1
9125
9125
... More
045 - Swith gear a) LT Protectin kit for 100 kVA. As per the direction of Engineer-in-charge of work B)Labour Cost
2
260
520
... More
023 - EG Stirrps with G.I. wire lacing. As per the direction of Engineer-in-charge of work B)Labour Cost
14
125
1750
... More
019 - PG clamps for Rabbit conductor. As per the direction of Engineer-in-charge of work A) Material Cost
12
116
1392
... More
050 - Swith gear v) Fish plate with necessary clams. As per the direction of Engineer-in-charge of work. A) Material Cost.
2
229
458
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%